Loading...
4.pdfReadwin, Jennifer From: Readwin, Jennifer Sent: Friday, April 21, 2006 11:00 AM To: `sniovell@comcast.net' Subject: Building Plan Review Corrections PC6-571 Steve, went a head and wrote up the thing I talked to you about earlier but after reading the letter provided from Dennis Bruce the temporary shoring walls he talked about will also require calculations and plans. See my attached correction. Hopefully who ever you have working on the retaining walls can also provide the information on the temporary shoring. 20060421050713.p df (39 KB) Jenny Readwin Plans Examiner City of Edmonds 425-77.1-0220 1 a� Endo City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: April 21, 2006 TO: Steve Lovell Snlovell@comcast.net FROM: Jenny Readwin, Plans Exami r RE: Plan Check # 05-571 Project: Addition Project Address: 8312 Talbot Rd. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Initial corrections 12/28/06 Second set of corrections 2116106 Third set of correction 3130106 Fourth set of corrections 4120106 1) ok 2) ok 3) ok 4) ok 5) Still need no response given. See attached structural comments from city consultant. Respond to each item in writing. • Structural Consultants Item #E What is the connection required for beam marked D to the triple rafter? Nothing is specified at this time. Please add this information to the drawings. Specify which THG hangeryouintend to use. There are several different ones in the Simpson catalog. T 6) Still need no response -given. It is my understanding that you are working on this item. Rockeries and retaining walls located in a critical area, regardless ofheight,_reguire a separate permit. See enclosed handout for submittal requirements. Details and Engineered .stamped calculations are required for review and it is possible that peer review will be required. 7) Letter_ from Dennis Bruce, PE dated April 6, 2006 received April 13, 2006 says that temporary shoring will be required. A temporary shorin_g plan and details with Engineered stamped calculations are required (same as rockeries and retaining walls). Please redline plans or submit two (2) sets of revised plans/documents (affected sheets_only_) with a written response to each of the above items to a Permit Coordinator.