Loading...
4117_001.pdfROD NOVION Architact 10.12.2018 Project address: -915 PINE STREET RE� �LANO USE GOMMENTS- -RESPONSE- - BLD201,81,036. 1. Sheet A-1.0 a. In Project Notes, remove note under Height stating "5' Additional roof (4/12 slope)". NOTE REMOVED b. Remove the 'exi�rMg house TBR' dashed Wilines. Show and label the access easement crossing Future Lot 2 and identify the area of the easement. EXISTING HOUSE REMO VED AND THE A CCESS EASEMENT IS IDENTIFIED. c. Structural lot coverage is shown for both the existing lot and future condition of Lot 2. Verify those areas are correct, particularly the lot area of Future Lot 2 after the access easement area is subtracted out. Per ECDC 21.15.110: "Coverage means the total ground coverage of all buildin.9sor structures on a site measured from the ouLsWeof external walls or -supporting, members -or from a point twD -and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area." ADJUSTED THE LOT AREA TO EXCLUDE THE EASEMENT AREA. VERIFIED THE LO T CO VER CAL CULA TIONS. ALL BLDG AREAS ARE INCL UDED EXCEPT ROOF OVERHANGS THATARE Z50R LESS. d. A smalt second story deck is shown encroaching: into the, west setback area,. While roof eaves may project into a required setback up to 30", the code does not have an exception for 2nd story decks. Please remove that portion of the deck that encroaches into the setback and verify that all roof eaves project only a maximum of 30" into a required setback. REMOVED THE DECK PORTION(S) THAT ARE INTO SETBACKS AND HA VE DIMENSIONED THE CRITICAL OVERHANGS. SHEETA-1. 0 AND A-4. 0 e. Because the west deck must be reduced, the height calculations will need to be updated. Reposition height corners PI and P4 and update the 'average grade calculation' box as necessary. AVG. GRADE POINTS AND CALCULATIONS ARE REVISED. A-1.0 & A-4.0 RESUB OCT I � 2018 BtJILDING DEPARTMEW CiTY OF EDMONDS October 12, 2018 2. Sheet A-4.0 a. Update the average original grade, maximum.allowed height, and proposed height as necessary if any changes resuft from the -height calculation change on Sheet A-I-.O,. THE CALCULATIONSAND ELEVATION AVERAGE ORIGINAL GRADESARE UPDATED. 0 Page 2