Loading...
4177_001.pdfRAM Engineering City of Edmonds Development Services Department 121 51h Avenue North Edmonds, WA 98020 RE: WrigleySFR21423 98'h Ave W, Plan Check BLD20181095 V Review Comment Response RAM Job No. 18-018 Dear Staff: October 19, 2018 Sewiner., I— e"—' �. ft--fta This letter outlines the revisions and corrections made per planning, building and engineering review comment letters. Below is a list of the comment response documents addressing the comments and requests: Planning Review: Mike Clugston, September 5, 2018: 1. Sheet SP-01: a. Label the elevations of the existing ground contours (and on Sheet TP-01). Response: Ground contour elevations added. b. Verify that the structural lot coverage for the site includes the existing detached 400 sq. ft. garage and that the total amount proposed is less than the 35% maximum coverage allowed for the site. Response: Square footage listed in lot coverage includes existing garage. Building Review: Eric Evensen, September 18, 2018: A3: 1. Holddown Schedule, Mark T-5 lists 7/8" diameter anchor bolt. Please clarify the required embedded hardware. Response: See architect plans. Engineering Review: JoAnne Zulauf, September 7,2018: GENERAL 1) Submit ROW Permit Application form Response: ROW permit application will be made by applicant. 2) Submit Side Sewer Per�i�it Application form Response: Side sewer permit application will be made by applicant. 3) A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction, final RESUS location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. OCT 2018 Response: See attached signed Stormwater Covenant. BUILDING DEPAFi'rMENr CITY OF EDMONDS Wrigley SFR 21423 98th Ave W Plan Check BLD20181095 1st Review Comment Response RAM Job No. 18-018 4) Please add note: "Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required." Response: Note added to plans as requested. 5) Please correct the north driveway note to state "install" instead of "installed". Response: Note was corrected. 6) Add top of wall elevation and toe of wall elevation to plans. Response: See TP-01 for wall top & toe callouts. TESC 1) Orange protective barrier fencing shall be placed at the drip line of trees to remain. Response: No onsite trees to be retained. Added notefor all trees to be removed. SEWER 1) Please correct the sewer call out to state "install" instead of "installed". Response: Note was corrected. STORM 1) Provide invert elevations for drain drywell trenches. Response: Added invert elevations to callouts on sheet SP-01. STORMWATER ENGINEER REVIEW Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.i-icliat-dsoii(it�e(imoiids-,va.gov with any specific questions you may have regarding his comments. Response: See responses below. Stormwater Engineering Review: Zach Richardson, PE, September 10, 2018: Review Comments: Geotech Report: The subsurface text section does not appear to match the boring data or is missing some info; revise report text to reflect the LOAM layer found in the borings and clarify if the moisture sensitive soils are the fill material or the loam material (or if the loam material is the fill?). Update drainage BMPs to reflect updated info as needed. Response: See attached clarification emailfrom Geotech. 2, Provide enough information to verify that a minimum of 2'of cover is maintained over the driveway culvert, or revise/replace as needed. Response: Replaced pipe with ductile iron pipe and made connection to west storm drain intake pipe with catch inlet. 2'cover cannot be achieved. 4. Provide information or written response to verify the additional driveway fill is not going to impound runoff from the east from the ROW and adjacent private parcel, Response: Addedflow arrows to show existing and proposedflow patterns. Page 2 of3 RAM Engineering 1653113111 Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com Wrigley SFR 21423 98th Ave W Plan Check BLD20181095 1st Review Comment Response RAM Job No. 18-018 Page 3 of 3 5. Provide enough grading information or notes as needed to ensure surface runoff from the driveway is direct to the ditch line to the west (and not out into the roadway). Response: Added spot elevations & flow arrows to show drivewayflow. Added riprap pad to prevent erosion from driveway runoff. 6. TP-01: Add a wattle/temp check-clam/etc just upstream of the pipe inlet for sediment control within the existing ditch on 214th. Response: Added wattle in ditch. If there are any questions regarding the items above, please contact me at your earliest convenience; I can be reached at (425)678-6960 or MikeM@RAMengineeringinc.com. Tha W Principal RAM Engineering 165311311, Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com From: Rob Long Sent: Friday, October 19, 2018 12:14 PM To: Mike Morris Subject: FW: Response to comment Rob Long, PE RAM Engineering, Inc. 1653113 th Ave W, Suite A108, Lynnwood, WA 98037 Phone: - Cell:Qp§)_2��_��9.8 From: Adam Shier <adam.shier@earthsolutionsnw.com> Sent: Monday, September 24, 2018 2:18 PM To: Zachary.Richardson@edmondswa.gov Cc:'Rob Long' <Ro bL@ ra mengi nee ri ngi nc.com >;'Henry Wright' <Heiii-y.Wright@earthsolutionsnw.com>; 'Kayla Clark' <kayla.cla rk@O Lltlook.conl> Subject: Response to comment Mr. Richardson, ESNW has reviewed the Geotechnical Evaluation letter for the subject site located at 21423 — 98th Avenue West, the review comment, and an email from you with clarification. Based on the observed conditions at the subject site, it is our opinion the subject site would not be favorable for infiltration as native glacial till soils would restrict infiltration and create saturated soil conditions within the upper soils. Glacial till is generally compact, coherent, and is commonly termed "hardpan" in western Washington. Glacial till is comprised of a nonsorted mixture of clay, silt, sand, pebbles, and cobbles in varying amounts. The material is typically very dense and weakly cemented resulting from glacial overburden. The upper, medium dense deposits observed between two to four feet below the existing grades may be characterized as "weathered", and the underlying, dense deposits may be characterized as "unweathered". The unmentioned 2' layer of loam shown at the test pit locations is the weathered glacial till layer. The identified "till" layer marks the transition between weathered and unweathered till. Based upon the results of USDA textural analyses performed on representative soil samples, native soils may also be primarily classified as gravelly sandy loam and slightly gravelly loam. Additionally, the USCS classification for the sits soils was classified as Silty sand (SM) with gravel, typical of glacial till. Please review our response and let us know what further action is required for this project. Thanks, Adam Z Shier, G.LT. Staff Geologist Earth Solutions NW, LLC 1805 - 136th PI NE, Suite 201, Bellevue, WA 98005 Phone: 425-449-4704 Fax: 42�_'4i_9_-_4_7"1_1 C e 11: 6 -'2 8 0 -'1'314 Emaii:'��Wr;;.;�i�,�De aI hso ILI I io nsnw corn This e-mail is intended for the use of the individual to whom it is addressed and may contain information that is privileged, confidential or otherwise exempt from disclosure under applicable law. if the receiver of this e-mail is not the intended recipient or the employee or agent responsible for delivering the message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited.