Loading...
4272_001.pdfOV Eb4fo SPECIAL INSPECTION AND TESTING AGREEMENT ,,,A .1 + Permit It: 130D 2n�? /3-54�) Project: Install (11) Driven Piers to stabilize foundation. Prior to issuance of a pertnit, thisjorm noust be compiered in its endreo and reiurfied iu Me chy-fiou- approvaL The completedform must have signatures of achnowledgment by afl parties. DUTEES AND RESPONS11111UTIES Special 111s1wetimi Firm and Special Inspectors: The Special Inspection firm of Longitude One -Twenty Engineering. will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): E] Reinforced Concrete C] Bolting in Concrete E] Prestressed Concrete E] Shotcrete E] Structural Masonry [] Structural Steel/Welding [] High Strength Bolting E] Spray applied Fireproofing E] Smoke Control Systems F1 Lateral Wood structural Observation by design professional Grading/soils Other: rnme texti [] Other: [Tvw text] All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and fir7n must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perfonn the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Nar/fbIders15p/qJrfqsxx0h I 15wgblOn9ihfrO000gnrr/com.microsoft.Outtook/Outlook Temp/BLD2017-0865 Special inspection foffn[Il.docIO/10/2018 By:T;�_f - Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications niust be inade available, at thejobsite for tile use ofthe special inspector and tile City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspect ions perforined by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. BuildiliL, Department: The building departinent shall review any revisions and addenda. The City inspector will monitor the special inspection functions for conipliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. ll)esiull Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firin to perforni in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and tile Building Official's approval of the special inspector. In such a case a new special inspector and/or firin would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement inay result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACIKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Sean Monahan Owner: 4; Signature Date Contractor: Ram Jack West Signature- —Date: - 10/10/18 Signaturc1&_1__rJ1V__ Date: Arch./Eng:__wn �rin *V0 Special Insp. SPMel Signature- Date: Special Insp. Agency ArrPPTED FOR THE CITY OF EDMONDS BUILDING DIVISION Date: lyarlfoldersl5pinjrfqsxxOhll5wgbiOn9lhfrOOOOgnITIcom.microsoft.OutlooklOutfookTemplBLD2017-0865 Special inspection fonn[l].docIO/1012018