Loading...
4459_001.pdfNovember 8, 2018 Natalie Griggs City of Edmonds 12 1 """ Avc Nortil Edmonds, WA 98020 RE. Permit BLD20181169 10610 240 PL SW, Edmonds Engineering Comment letter October 2, 2018 Dear Ms. Griggs, We are in receipt of the comment letter dated October 2, 2018 and have made changes to our plans in response. Below are the items from the letter, with additional comments describing our updates to the plans. GENERAL I . OK 2. OK 3. Note materials for the proposed new driveway and show the connection within the City ROW to 106th PI W. We have added the materials to ourplans. 11/1/2018 - Please note the edge of pavement near the proposed new driveway. Clearly note the portion of asphalt driveway extending from the edge of pavement to the new concrete driveway. Notes are on the plan indicating the edge ofpavement near the new driveway. We have added a gray screen to graphically illustrate the new asphalt in the right of way. 4. 11/1/2018 — Remove clouding on the plans. The clouding has been removedfrom theplans. TESC 1. ll/l/2018 —Extend the filter fence parallel to 106th PI W to the northern end of the proposed infiltration trench. Show this change on the plans. Thefilterfence has been extended around the infiltration trench. 2. 11/1/2018 — Please note on the plans that all disturbed soils shall be compost amended per BMP T5.13. Also note that soils in the vicinity of the existing driveway to be removed shall be compost amended and permanently stabilized. We have added these notes to the site plan. R E U NOV U d 203 158ffi Ave NE, Suite 250 BUILDING DEPAI-11 MEN _�edmond, WA 98052 MY OF EDMONDS 425-636-8006 1100 e sewer cleanout will need to be installed at the property line isition per Olympic View Water Sewer District standards. )cation of the cleanout on the plans. is side sewer cleanout to the plans at the property line. - show the location of any downspouts to be added to the id/or garage, if applicable. �wnspouts to the utilities plan for coordination - show tightline to the infiltration system. Also show any or cleanouts on the plans within the infiltration trench. * tightline information to the plans including the call out * wells, and cleanouts. the location of the catch basin on the plans and call out invert e catch basin on the plans and added the invert elevations. e refer to Stormwater Engineer comments. r the stormwater comments to the plans andprovided a owing the updates to the plans. -all should you have any questions on this resubmittal. I)esign Group, Inc. ; dated 11/08/2018 cl: 83 83 158" Ave NE, Suite 250 Redmond, WA 98052 425-636-8006