Loading...
4467_001.pdfHUTTEBALL +OREMUS architecture November 6, 2018 Mr. Chuck Miller Senior Plans Examiner, City of Edmonds 121 51h Avenue North Edmonds, WA 98020 Re: ESD Seaview Elementary Outdoor Learning Center — Permit Comments Building Permit Application: BLD2018-129 7 Mr. Miller, We received comments from the City of Edmonds Building Division on October 23, 2018 related to the proposed outdoor classroom for Seaview Elementary School. Please find our response to each comment below. The unique and specific nature of the work necessary to complete your project requires special inspection per IBC 1704. A City of Edmonds'Special Inspection and Testing Agreement' (see the end of these comments) for any 'field -welding' will need to be completed and returned prior to permit issuance. It is assumed that any 'shop -welding' will be performed at a facility employing certified welders. Response: Please see attached 'Special Inspection and Testing Agreement'. 2. C1.0 - TESC &Demo Plan —Include in the extent of the area to be 'cleared and grubbed' that required to provide an accessible route to the outdoor classroom per International Building Code (IBC) 1104.2. The exterior accessible route is required to have a minimum clear width of 44 inches per IBC 1101.2.1. Response: Refer to sheet C1. 0 for revised extent of area to be cleared and grubbed, including the area for the accessible path. Exterior accessible route to the outdoor classroom space has a minimum clear width of 44-inches. 4010 LAKE WASHINGTON BLVD. NE, SUITE 320, KIRKLAND, WA 98033 1 425.828.8948 1 HOARCH.COM 3. C2.0 - Civil Site Plan — Specify on the plans the proposed method and materials to be used to construct the accessible route to the outdoor classroom. There is also concern regarding accessibility to the planting boxes that may be part of the learning experience. Response: Refer to sheet C2. 0 for location and material of accessible path to the outdoor classroom. Refer to sheet A 1. 0 for horizontal control of the accessible path. The planting boxes have been removed from the scope of this ptoject. 4. A1.00 - Enlarged Site Plan - Indicate on the plans the accessible route to the outdoor classroom complying with IBC 1101.2. 1. There is also concern regarding accessibility to the planting boxes. Response: The clouded area on 11A 1. 00 - Enlarged Site Plan now shows an accessible path complying with IBC 1101. 2. 1 leading from the surrounding asphalt play area to the paved patio area. The planting boxes have been removed from the scope of this project. 5. S1.01 - General plan review note regarding the teaching shelter — Provide as part of a complete permit application submittal structural calculations supporting the capacity of the details represented on sheet'S1.02' to resist lateral loads per IBC Chapter 16/American Society of Civil Engineers (ASCE) 7-10 — Minimum Design Loads for Buildings and Other Structures. Response: Please see attached calculations. 6. S1.01 - Structural Notes — Wood — Specify on the plans the proposed species of wood, or method of treatment, of the wall framing (sill plate, studs, wall slats) used to construct the teaching shelter and required to be protected per IBC 2304.12. Response: Sawn lumber shall be naturally durable Western Cedar No. 2 per roof framing plan Note #3. 7. S1.01 - Plan 1 — Foundation Plan — Change on the plans the minimum number of anchors required to connect the 'prefab greenhouse' with an extension kit to the concrete slab on grade from '8' to '10' per page 64 of the provided manufacturers information — Palram Applications, Ltd. — Glory 8'x8'with Glory 8'x4' Extension Module - see also plan review comment'8'. Response: The greenhouse has been removed from the scope of this ptoject. 8. Palram Applications Cover sheet — Clarify the indicated snow load and wind resistance. It does not appear to comply with that required for structures in this jurisdiction per IBC Chapter 16 (25 psf non -reducible ground snow load — 85 mph basic/1 10 mph ultimate wind speed). The selection of an alternative structure of a different construction/conf ig u ration may affect the applicability of other comments in this review or result in additional comments. Response: The greenhouse has been removed from the scope of this project. 4010 LAKE WASHINGTON BLVD. NE, SUITE 320, KIRKLAND, WA 98033 1 425.828.8948 1 HOARCH.COM 9. Palram Applications Page 5 (indicating the exterior dimensions) — Clarify the indicated dimension of the door opening. Even without the installation of the door (which would appear to completely swing out of the opening), it does not comply with the 32 inch clear width required per IBC 1103.1 and ICC Al 17.1-2009 Section 404.2.2 — see also plan review comment'8'. Response: The greenhouse has been removed from the scope of this project Thank you for your time spent reviewing our submittal. I hope the information provided above and attached with this letter will adequately address all items. Please feel free to call if you have any questions need additional information. Sincerely, Steve Busig Principal c: Nick Chou, Design and Construction Manager, Edmonds School District 4010 LAKE WASHINGTON BLVD. NE, SUITE 320, KIRKLAND, WA 98033 1 425.828.8948 1 HOARCH.COM '1)C. is t) " CITY OF EDMONDS 121 5th Avenue North, Edmonds WA 98020 Phone: 425.771.0220 - Fax: 425.771.0221 9 Web:www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT - PLANNING - BUILDING - ENGINEERING DATE: 10/24/2018 TO: Applicant RE: Cons oli dated Plan Review Comments and Status Report Permit#: BLD20181297 Project Type: 01 -Accessory Structure Project Name: 8426 188TH STSWI EDMONDS All assigned departments have reviewed the submitted application. Plan review comments are now ready for your review and response. The following hyperlink will take you to your online permit information. Once you have selected the permit, scroll down to the ASSOCIATED FILES section to review all department comments. LINK: Online Permit Information Depa rtment Response required Approved as submitted Planning 11 Building Engi neeri ng/ Storm Water Fi re El Stormwater City Ha I I Development Services Permit Center 121 5th Ave N-2nd Floor Edmonds, WA 98020 Counter Hours: Monday & Tuesday 8:00 AM —4:30 PM Wednesday 8:30 - Noon Thursday & Friday 8:00 AM —4:30 PM Please re -submit 2 hard copies (not bound or stapled) of all revised documents & plans addressing comments from an departments. Includea response letter to each reviewer. Note: Do not re -submit large reports that have not changed. Ex: Storm water and/or Geotech reports. Thankyou, DENISE NELSON Permit Coordinator City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 23, 2018 TO: Steve Busig Hutteball+Oremus Architecture sbusip,((__�hoarch.com FROM: Chuck Miller, Senior Plans Examiner chuck.mi1ler624edmondswa.y,ov RE: Plan Check: BLD2018-1297 — I" review Project Address: 21911 76 1h Avenue W, Suite 211 Project: Seaview Elementary outdoor learning center Scope: Construct patio, greenhouse, and teaching shelter (gazebo) for outdoor instruction -extend existing path — nonseparated Education group E occupancy — 29 occupants — VB construction Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/docunients, includinp, a written response in itemized letter forniat indicating where the 'clouded' or otherwise highli2lited changes can be found on the revised plans, have been submitted to a Permit Coordinator. Only those sheets specifically referenced as follows need to be resubmitted. Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General plan review comment: The unique and specific nature of the work necessary to complete your project requires special inspection per IBC 1704. A City of Edmonds 'Special Inspection and Testing Agreement' (see the end of these comments) for any 'field -welding' will need to be completed and returned prior to permit issuance. It is assumed that any 'shop -welding' will be performed at a facility employing certified welders. On sheet C1.0 — TESC & Demo Plan: 2. TESC & Demo Plan — Include in the extent of the area to be 'cleared and grubbed' that required to provide an accessible route to the outdoor classroom per International Building Code (IBC) 1104.2. The exterior accessible route is required to have a minimum clear width of 44 inches per IBC I 10 1.2. 1. On sheet C2.0 — Civil Site Plan: 3. Civil Site Plan — Specify on the plans the proposed method and materials to be used to construct the accessible route to the outdoor classroom. There is also concern regarding accessibility to the planting boxes that may be part of the learning experience. On sheet A1.00 — Enlarged Plans: 4. Plan I — Enlarged Site Plan - Indicate on the plans the accessible route to the outdoor classroom complying with IBC I 10 1. 2. 1. There is also concern regarding accessibility to the planting boxes. On sheet S 1. 0 1 — Foundations and Roof Plans: 5. General plan review note regarding the teaching shelter — Provide as part of a complete permit application submittal structural calculations supporting the capacity of the details represented on sheet 'S1.02' to resist lateral loads per IBC Chapter 16/American Society of Civil Engineers (ASCE) 7- 10 — Minimum Design Loads for Buildings and Other Structures. 6. Structural Notes — Wood — Specify on the plans the proposed species of wood, or method of treatment, of the wall framing (sill plate, studs, wall slats) used to construct the teaching shelter and required to be protected per IBC 2304.12. 7. Plan I — Foundation Plan — Change on the plans the minimum number of anchors required to connect the 'prefab greenhouse' with an extension kit to the concrete slab on grade from '8' to '10' per page 64 of the provided manufacturers information — Palram Applications, Ltd. — Glory 8'x8' with Glory 8'x4' Extension Module - see also plan review comment '8'. On the provided information from Palram Applications, Ltd. — Glory 8'x8' with Glory 8'x4' Extension Module: 8. Cover sheet — Clarify the indicated snow load and wind resistance. It does not appear to comply with that required for structures in this jurisdiction per IBC Chapter 16 (25 psf non - reducible ground snow load — 85 mph basic/ I 10 mph ultimate wind speed). Theselectionof an alternative structure of a different construction/configuration may affect the applicability of other comments in this review or result in additional comments. 9. Page 5 (indicating the exterior dimensions) — Clarify the indicated dimension of the door opening. Even without the installation of the door (which would appear to completely swing out of the opening), it does not comply with the 32 inch clear width required per IBC 1103.1 and TCC At 17.1-2009 Section 404.2.2 — see also plan review comment '8'. Page 2 of 2