Loading...
4620_001.pdfIEC INSIGHT ENGINEERING CO. September 26, 2018 Zack Richardson 121 5 1h Ave NE Edmonds, WA 98020 (425) 771-0220 Re: Zimmerman Edmonds SFR — BLD20180576 IECO No. 17-0858 Dear Zack, The project referenced above is revised in response to the review comments dated August 2 1, 2018 (Amended 9/10/18). The review comments are numbered on the letter and have been addressed in italics as follows: Review Comments: 1. Update the drainage report, to reflect the critical areas as determined through CRA20170078, as needed to address additional comment below, and identify any and all pipes or systems on -site which discharge to the creek. The pipes to the system have been identified and shown on the revisedplan. 2. Staff have been made aware of the presence of a storm drain system underneath and within the footprint of the existing garage which is believed to be the creek. Update plans and report to show the system, identify the system as private, and address as needed. The pipes have been shown on the revisedplan. The pipe layout is based on information the homeowner provided and uncovered. 3. Update drainage report to reflect the observed conditions noted in the geotechnical report include seeping walls, discharging sub -surface pipes, creeks, and groundwater expressed on surface; identify where these flows travel for conveyance and address concerns as needed. a. If no improvements to address the groundwater of the site are proposed, engineer shall explain why this condition is proposed to remain as -is. PO Box 1478 # Everett, WA 98206 * Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net The plans have been updated to show the numerous pipes onsite. The homeowner is working with his geotechnical engineer tofix the seeping walls. No other subsurface mitigation is beingperformed 4. City records for the private 4" drainage system within the Dayton St ROW and driveway do not match that shown on the plans and the information provided is not sufficient to connect to this existing private system. a. It is believed that the 4" private system conveys runoff across the property frontage without bringing the runoff onto private property as shown in the topo and that the driveway system is not actually connected to the ROW system. Uponfurther investigation, we believe this to be true as well. Please see the new design to the existing system in Dayton Road b. It is also believed that portions of this line may be perforate pipe and therefore not eligible to carry additional conveyance flows; this pipe appears infeasible for connection of the project drainage and will not be permitted without significant additional information to verify pipe condition/make-up/ownership/etc. Understood. Please see answer to 4a. c. Runoff will not be permitted to be discharged across the public walkway either (ic. bubble -up with surface overflow not an option). We areproposing a tightline to the existingpipe system within thepublic right-of- way of Dayton Road. d. The 6" public line further into Dayton (see map.edmondswa.gov) may be used for connection (at a new CB), but conveyance calculations still need to be provided to verify adequate capacity of the 6" system. The outletfrom the detention pipe has been connected to the 6 "public line in Dayton St. Refer to the conveyance analysis in appendix E of the drainage report. 5. Update drainage report to include a sizing calculation for how the impervious surfaces proposed were converted into the detention pipe size proposed. Refer to appendix Bfor the detention pipe sizing calculations. 6. Update plans and report to address the retrofit requirement per ECDC 18.30.060; MR #5 must be applied to 25% of the existing impervious surfaces to remain. a. Please verify the existing impervious surfaces to remain value on the plans; staff scaled -off a different value for just the existing roofs than is shown. Table on sheet C1 has been updated. PO Box 1478 * Everett, WA 98206 # Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net 7. By interpolation, detention sizing appears to have been done for the new plus replaced surfaces only, however it is unclear how the engineer intends to separate and collect only the runoff from those impervious surfaces. Either, a. Update plans and report to be size the BMP for all impervious surfaces actually draining to the facility, OR The new and 25% of the existing roof of the home will be directed to the detention system per the City ofEdmonds code. Refer to the revisedplans and drainage reportfor more information. The existing roof drains on the north and northwest corner of the house will continue to drain to the existing downspouts. b. Provide enough roof sloping, downspout location, and/or grading information to show how the only areas requiring mitigation will be collected and routed into the system. Refer the downspout locations shown on sheet C1. Grading information has been shown on sheet C2. The existing roof drains on the north and northwest corner of the house will continue to drain to the existing downspouts. 8. Cl: Update hatchings in impervious section exhibit for consistency/elarity; shed, house, and garage all appear to be different hatch types or line thicknesses but only I of them matches the legend. The hatch for the shed, house, and garage match the legend and are all considered existing impervious to remain. 9. Cl: Update the table of treatment areas to: a. Include a retro-fit value equal to 25% of the existing to remain and a proposed BMP for the retrofit requirement, and b. Include a lawn and landscaping value equal to all disturbed pervious areas and list BMP T5.13 as the stormwater facility. The table has been updated accordingly. 10. C 1: C13 #2 and the detention system all have invert values which are below the discharge point of CB #1; correct elevation as needed for positive flow. Invert elevations have been revised accordingly. 11. C 1: Include the missing invert elevation (NE) at CB # 1. Invert elevations have been shown. 12. C I: Add callouts for all 4" drain -line systems (ie. frontage system and alley system): "Private drainage system; not maintained by City " PO Box 1478 # Everett, WA 98206 * Phone: (425) 303-9363 Fax: (425) 303-9362 # Email:info@insightengineering.net Callout has been added. 13. C I: Identify the start and end invert of the detention pipe (or provide dimensions from 12" invert in detail) Inverts have been shown. 14. C 1: Correct inconstant rim elevation between CB #2 callout and control structure details. Rim elevation has been revised 15. C 1: Update detention detail to include vent pipe. .. Vent pipe has been added to the detail. 16. Cl: Update detention detail to include an underdrain and identify the discharge point. An underdrain has been added to the detention detail. 17. C2: Identify "VEG" in the legend. The legend has been updated accordingly. 18. C2: Add notes to reflect the need to apply BMP T5.13 to all disturbed pervious areas and provide detail or specifications sufficient enough for the contractor to install soils meeting requirements. Note has been added to sheet C2. 19. C2: Identify the limits of storm drain line proposed for removal (or update plans to reflect 4 connections at C13 #1 and potential conflict with C13 #2). The storm system has been updated. Refer to the revisedplan. 20. C2: Provide perimeter protection on the downhill sides of clearing limits; insufficient vegetation length appears to exist before the property line to the west or critical area buffer to the south to be a suitable standalone BMP. Siltfence has been added. 21. C2: Provide enough grading information (spot elevations at comers, grade breaks, and low points) to verify that runoff from the driveway surface will be directed to the CBs as intended. Spot elevations have been added to the driveway. PO Box 1478 * Everett, WA 98206 * Phone: (425) 303-9363 Fax: (425) 303-9362 4 Email:info@insightengineering.net Please feel free to contact me with any questions or comments you may have. Sincerely, B alab, P.E. PO Box 1478 # Everett, WA 98206 # Phone: (425) 303-9363 Fax: (425) 303-9362 4 Email:info@insightengineering.net