4816_001.pdfRAM Engineering December 18, 2018 City of Edmonds Development Services Department c/o Brad Shipley 1215 1h Avenue North Edmonds, WA 98020 RE: Select Lot 1 of 2-Lot Short Plat, 1122 Viewland Ave Plan Check BLD20181126 Vt Engineering Site Plan Review Comment Response RAM Job No. 16-001 Mr. Shipley: This letter outlines the revisions and corrections made per Staff review. Below is a list of the comment response documents addressing the comments and requests: Planning: Brad Shipley, Comments dated September 21, 2018 Site Plan: Under "Site Data," acreage does not match square footage. Please correct. Response: Listed area in Site Data corrected. F 1 Indicate If patios are covered. Response: Covered patio areas callout added to plans. Provide lot coverage calculations. Response: Lot coverage calculations added to plans. F' Point "C" of the height rectangle falls off the property. When this occurs, the point should be the average of the two points where the height rectangle crosses the property boundary. Response: Height calculations adjusted with property boundary. Engineerin : Jennifer Lambert, Comments dated November 7, 2018 GENERAL 1) Submit Side Sewer Perniii Application form Response: Okay. 2) Note AFN's for all easements and/or recording documents for proposed easements as applicable (may reference short plat number). Response: Easement AFNs andlor short plat number callouts added to easements as requested. 3) Consistent with Edmonds Community Development Code 18.80.060, driveway slopes shall not exceed 14% slope. Please indicate this requirement on the plans. Response: Maximum driveway slope note and to plans. RAM Engineering 1653113111 Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAM engineer! nginc.corn Select Lot I of 2-Lot Short Plat, 1122 Viewland Woy Plan Check BLD20181126 1st Engineering Site Plon Review Comment Response Page 2 of3 RAMJob No. 16-001 December 18, 2018 Sheet 1 of 3 — SITE DEVELOPMENT PLAN WATER 1) As indicated by the Fire Department, afire sprinkler system is required for this property. Typically if there is an existing water service line from the watermain to the meter, the water service line/meter will not be the appropriate size and a new tap will be required. The applicant will be required to pay for the new tap on the main and the new meter. Please revise plans to include the following: a. Please add a note that a I" meter is to be installed b. Show the water meter located in the right-of-way, such that the back of the meter is on the property line, The water meter shall not be located within the driveway. Response: 1 " water meter callout added to plans. Water meter adjusted to property line and out of proposed driveway area. 2) Add a note to the plans indicating where the landscape irrigation backflow assembly will be located (if one is proposed). Response: No irrigation meter proposed. SEWER 1) Add the invert elevation at the stub (installed with the short plat). Response: Sewer stub invert elevation added to plans. STORM 1) Show where the retaining wall drainage will discharge to if drains are to be installed. Response: Retaining wall discharge connected to dry well as shown on plans. 2) The surface water runoff from the driveway shall not sheet flow over the sidewalk. Please show the surface water runoff from the driveway being collected and discharged to the onsite stormwater management system. Response: Per discussions with staff, driveway runoff across sidewalk is acceptable. Surface water collection is being provide by stormwater system shown on the Short Plat civil construction plans. DRY UTILITIES No Comments Sheet 2 of 3 — GRADING AND TESC PLAN TESC 1) Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Please reference the Edmonds Standard Detail. Response: Note and detail to oddfilter socks added to plans. 2) Add note: Install and maintain all TESC measures according to approved plan , City of Edmonds standard details, and all other measures that may be required during construction. Response: Note added to plans. RAM Engineering 16531 13t" Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com Select Lot I of 2-Lot Short Plot, 1122 Viewland Way Plan Check BLD20181126 Ist Engineering Site Plan Review Comment Response Sheet 3 of 3 — GFIN FIZA 1, NOTFS & DFITAII's No Comments STORMWATER ENGINEER REVIEW Refer to separate review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachnrNxichardson(a edinondsN�a.-o% with any specific questions you may have regarding his comments. Stormwater Engineer Review: Zack Richardson, Comments dated September 20, 2018 Review Comments: The building permit is dependent on the plat design, which has not been finalized or approved at this time; accordingly, this building permit cannot be issued, as submitted, until the civil approval of PLN20180024 is issued. Page 3 of3 RAM Job No. 16-001 December 18, 2018 a. Alternatively, full design and construction details of the detention system could be included and reviewed with the current permit submittal, but this would likely be a duplication of effort as the detention system would also need to be reviewed with the plat civils. Response: Okay. Short Plat civil construction plan approval will be processed concurrently to avoud duplication. 2. The surface discharge of the perforated pipe is not permissible; reconfigure the outfall as needed. a. If discharge to a private system is proposed, the applicant must demonstrate legal rights to, and adequate capacity and condition of, the existing system. Response: Perforated downspout pipe connected to stormwater control tank system/stub provided by short plat development plan. b. Given the site constraints, the City will permit the perforated pipe connection to be placed in-serieslupstream of the detention system (despite previous City direction). Response: Okay. Runoffisurface flows may not be directed across public walkways; revise plans to collect runoff from driveway surfaces prior to flowing across the sidewalk. Response: Per discussions with staff, driveway runoff across sidewalk is acceptable. See update storm water memo with adjusted impervious surfaces per plan revisions. If there are any questions regarding the items above, please contact me at your earliest convenience; I can be reached at (425)678-6960 or RobL@RAMengineeringinc.com. Thank you, Rob Long, PE Principal RAM Engineering 16531 131h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAM engineer! ngi nc.com