Loading...
4TH RESPONSE LETTER.pdfi A �* 3w"�o BEYLER CONSULTING November 26, 2019 Zack Richardson, Stormwater Engineer City of Edmonds 121 5th Ave N, Edmonds, WA 98020 Phone: 425-771-0220 RE CHUNG LOT 2 BLD20181466 725 EDMONDS Dear Zack, S "canneo Please find attached revised site plans, which reflect the changes as requested in the plan review dated November 7, 2019. Our response to each comment is shown below in bold. 1. The architectural site plan refers to civil drawings for grading and drainage but no civil drawings were submitted. A site -specific site plan showing grading and drainage along with the improvements proposed under this permit, is required. Update: The drainage report and limits of construction shown suggest a majority of the driveway will be constructed under the plat civil permit. Add a call -out identifying those portions of driveway as "improvements constructed under separate permit" and provide reference to the appropriate permit number; or update all materials to include full limits of driveway surface, with details, elevations, check -dams, and utility protection information as needed for construction. A noted was added stating the permit number for the short plat improvements. 3. Include an erosion and sediment control plan and ensure it protects the infiltration facility areas from construction traffic. Update: The currently proposed construction entrance location doesn't make sense; either a. The driveway is constructed, and the construction entrance needs to be placed beyond the paved limits to prevent migration of sediments from soft surfaces (or vehicles can remain on the paved surface at all times), OR b. The driveway is not constructed and the entrance needs to be placed at back of sidewalk to prevent picking up sediment downstream of the entrance. The construction entrance was removed and replaced with a note saying vehicles will park on the paved surfaces. 4. Show the limits of the rock around the chambers and update dimensions between the property line and edge of infiltration facility; setback are applied to the limits of the rock (infiltration occurs in full footprint of rock). LAKEWOOD OFFJCE 5920 loot', St SW, Ste #25 Lakewood, WA 98499 RESUB phone: 253-301-4157 fax: 253-336-3950 DEC 10 2019 Plan. Design. Manage BUILDING DEPARTMEN-1 CIVII & S I RUCI URAI. ENGINEERING I LANDSURVEYING I PLANNING GrTY OF EDMONDS PROJECT MANAGEMENT I FEASIBILITY I PERMIT EXPEDITING a. If utilities fall within required setbacks from the chamber system, provide additional information (trench elevation vs chamber elevation) and/or additional improvements (impervious liners, etc) to ensure infiltration water does not end up in utility trenches. Update: Limits and dimensions shown, but no accommodations appear to be shown to prevent migration of infiltration water into the sewer proposed sewer trench; update as needed. A note has been added with instructions to wrap trench in impermeable layer. 6. Identify where the footing drains for the home are proposed to outlet. Update: Now proposed to drywell; provide drywell detail as needed for construction (illClUding elevation information), show observation port in plan view, and revise drywell comply with infiltration setback requirements and provide dimensions as needed. Footing drains will daylight to the swale on Lot 1. Sincerely, Mark Keller, P.E. Page 2 of 2 BEYLER C 0 N' S U 11 T1 17 G