Loading...
5.31.19 - Eng Comments 3.pdfOV E11A, CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: May 31, 2019 FROM: Chris Rivera, Engineering Tech. Chris.rivera@edmondswa.gov RIE: Application 4: bld20190088 Project: Tenant Improvement Project Address: 123 3 d Ave S. During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2 nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. I st Review — February 20, 2019 2 nd Review — April 3 0, 2019 Yd Review — May 31, 2019 2/20/2019 - ***Based on a meeting held with Coast Bank, City of Edmonds Engineering Department and the Fire Department on 1/31/19, it was determined that a riser room, fire sprinklers and DCDA would be required in order to allow for addition occupancy. For this reason, we will need an updated site plan providing the following. 1 . Ok 2. Ok 3. Ok 4. 5/31/19 - Ok 5. Ok 6. Ok 7. 5/31/2019 —Ok 8. 5/31/2019 — Ok 9. 5/31/2019 - Please submit a Ri2ht of Way Permit Application. 10. 5/31/2019 — Submit a Traffic Control Plan to be attached to the civil sheets. Traffic control should be consistent with city standards handout E-81. 11. 5/31/2019 — Please note: The City of Edmonds requires Develop ers/C ontracto rs to notify affected residents and businesses of any planned water main shuts offs. Please review the City ofEdinonds Water Outa,-e Policy for Private Development Proiects. Page 2 of 2