509_9thAveN_SW_Rev_Comments.pdfRequest for Waiver from onsite detention The applicant is requesting that the requirement for detention be waived since he can discharge directly into the - QUQQ fa 4-9.44just west of his site. This system eventually discharges into Puge oun . ot��!J wq%k Waiver Justification: This waiver is justified due to the specific con itio s of P;pe CAV this site. Since the northwest site area has be de-classffied as a wetla there is no need to direct some of the site runoff to that area. In addition, there is a fogional QlatoPUGN faQd4*just downstream of the site which can be use �--yv-his project. Since this system has direct discharge to the Puget Sound, there is no need for detention. �-%r vv'q Reviewed and Approved by the City: Date: By ............................................... I--- City Engineer S 4VV IS' k4kL L�M� Domi�ON Section 1: Project Information Project Name: 98h Avenue N Short Plat Project Site Address: 503 91h AvenueN. Edmonds, WA 98020 City File Number: S-05-09 Project Engineer: Lovell-Sauerland &Associates, Inc. 19400 33d Avenue W., Suite 200 Lynnwood, Washington 98036 Phone: (425) 775-1951 Project Applicant: Thuesen Custom Homes 17296 Talbot Road Edmonds, WA 98026 Phone: (425) 670-2825 Project Total Area: 1. 03 Acres Number of Lots: 2 - singlefamily Soils Data: Alderwood 'C' per Sheet #56 of SCS Soil Survey of Snohomish County June Revision Executive Summary This revision incorporates 3rd City review comments as follows: 1. Delete requirement for detention tank. 2. Because Wetland designation has been eliminated, no flows need to be directed to that area, so drainage can connect to the existing dof-p-tia , -,--L- to the west of the site. F? SIT In XVM-940 p-,PIE 3. The sewer extension has been revised to be on the east side of 8th Avenue N. Section 2: Existing Site Conditions. r The site is a rectangular -shape 1.03-acre parcel t at is occupied with one single family house that is currently under constructio �.pes generally to the northwest at an average grade of about 30%. Existing vegetation consists of pasture and some trees. Section 3: Proposed Project: The applicant proposes to build 2 new single family homes, removing the existing site improvements. A public alley off of 8 th Avenue N. will serve the west lot. The east lot will be served by a panhandle driveway in an easement to 9th Avenue N. The onsite water will be collected in an underground system and the offsite water will be collected in an interceptor trench. Both will directly discharge to the existing 4e�eft+i-o- at the west of the site. Section 4: Upstream Analysis The upstream basin consists of runoff from the natural vegetated portions of the uphill single family lots to the south of the project. Currently this runoff sheets flows northwesterly across the site. This offsite flow will be collected in a perimeter rock interceptor ditch with a perforated pipe and discharged into the onsite stonn system. Section 5: Downstream Analysis %41P,400 PVTOWts The project runoff and offsite runoff will discharge directly into the just to the west of the site. This system eventually discharges to Puget Sound, so the City is not requiring project detention. Section 6: Drainage Methodology and Applicable Code See the discussion in section 5 above. WGL VAJ Section uwity_�� r Pub v IWT Dwn'sivii W?tu Lk Va-ter quality is provided in the detention facility downstream of the project. The onsite --- ,downstream catch basin wd-U_huv4,q4-�m��evarator tee to reduce contaminant discharizeD Section 8: Temporary Construction Sediment & Erosion Control During construction standard BMPs will be employed to control potential adverse impacts to adjacent properties. These methods will include a temporary construction entrance, silt fencing, existing catch basin protection, dust control, and temporary seeding of disturbed areas as required. If required, a temporary sediment pond can be constructed to reduce runoff turbidity. Section 9: Detention Calculations: None required. EX. C.S. iNV.90.18-"N. EX C.8, --Top �-qS02 �26 INV _ 12 ---------- !a " 1 21 L 0 C K 8 a N a951 5r E vt�f�Ke*5(2- 40 (90