Loading...
524 MAPLE ST-REVISED.pdfMAPLE MAI _,J rA'\ ROADWAY CROSS SECTION TIE-IN TRANSITI N FITTING 2" MPE 2SN C/L & 186-W C/L ___'N G/L & ___'W C/L F-EAT 1. 11N) TYP. UTIL CROSSING SECTION HOLE HOG TABLE STANDARD GAS CONSTRUCTION NOTES: I E "s MORT A, _E_. IDU­­ E F.57—I Mp T_ A 9-1— W A A AT _ — A � r"a —1 PIE F. IL ­11 —1.— ­1 N.—T 1.1 .1E L� FTS��R�g.%E�,��&�.E��V.��E:,A.R�K�L� , I.I.8—TAL.—P.—II-1 T 1, EE�4.Tp�.­L=V%TE,E­ 11. —T. _"IMMM, ism m IIGEID �2.W N-1., ft'l d-th Z IN !FFAIL i T E:j_ r co- P. I!h, CP TEST LEA BOX COMPLETE (BIWIRE UP IN eCX) r G2V 1.�ll WE SE-CE AT 123'W C/L . ---'W NO ADDRE E # P LAT MAP DOES NOT SHOW THIS SERVICE . . . C/L � ---'E C�A (123'W. EXISTING MAIN JOE #853B 1966) PIPE 2' RPI 11 MAIN 22-H C/L ---'N C/L C P 2* MPE 22-N CA & 421'W CA 'N CA A 22N G/L & 234'E C A ---'N CA. ---'E CA (TYP)APPROX L6 N.=/ 2- ETW IP 131, DO - - - - - - - - - - - - - - - MAPLE STE EFROPOSSO 1 1/�' MPE IP EERVGE 4, 1IML pof�f .1 PROPOSED 1 1/4- MIS IP SERVICE DO UTIUTI CROSS RGE E- D A POTHOLE AT w OUTSIDE �E PITS U'Ll I GEosslNGE J2 TYP) OUTSIDE - PIT, rm (2 TYP) F3-1 Z-9 1 - - - - - - - - - - ALLEY PLOT PLAN SCALE 1-- N. o -A K �FOR PUTS (,'.0- N F.7,1.U. —RANGE 'I "z- _-R, —"OTHER LITILITIES __,TAL TICAL TYP. . Q '4.N EXT-1- PS.SIN39�gW THEC E NDrROUP,LLC �ZPE' P "M 0 THIS APftCAl`4% S ALL BE t W" "? "LL 'I ca"ImI 'fOmU SEDIMENT ­LL BE REMOVED ON A REGULAR PAZ 1 11 MAINTAIN FILTRATION, E .. G71"N'. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS Fftm 1� WIDIIIN. NIN. 7. ATTAU. ,%n- NAm WN IPUI Nu NO- .1 CO INLET PRO ECTION tw Pau S74M NO SCALE WI cWNm OR GIIURSED BID IWIE MX, WA "A —D GDAREL LlMNIIWID GMUND 41 i A _BRC 11 A rILL_G SILT FENCE DETAIL . -1 GENERAL R/W USE RESTORATION REQUIREMENT5 (8-040) 1 AT THE ENGINEER'S DISCRE710.4, PRIOR TO COMI ANY CONSTRUCTION, PHOMSM HIS DEPICTING PRE-EYIS7ING ROADWAY COWITIONS WILL BE REQUIRED VERY 50 FEEL IN PIPPOM AREAS ON AV OTHER LOCATION AS SPECIFIED BY THE FLOWER. 2 SIGNING FT,kGOL G AND 7RAF9C CONTROL SPALL BE IN ACCORDANCE WITH THESE STANDARDS. THE WSDOT TRAFFIC MANUAL AND THE NANDAI OF UNIFORM TRAFFIC CONTROL D- CES. 3 ONE LANE OF TRAFFIC SAILL REMAIN OPEN 9 ALL TIMES. ATTENDED BY FLADMEN AND APPROPRIATE CONSTRUCTION SIGNIN. PROVIDED THE MAD EFI BE RE70RED TO 7W -WM TRAFFIC 9 THE END OF EACH WORKING DAY APPLICATIONS FOR TOTAL MA CLOSURES XUS7 BE FILED WITH THE CITY OF EDMONDS FOR REVIEW AND APPROVAL A EX17IN ORANAGE DITCHES, CULVERTS, ETC. DEALT BE KEPT CLEAN AT ALL 71MES TEN RD TRY DIVERSION OF ANY DRAINAGE SYSTEM WILL N07 BE PER VOTED W17HOO THE CONSENT OF THE Cl OF EDMONDS ENGINEER ANY DRAINAGE CULVERT, CA7CHBASILL, MANHOLE OR OTHER GRALRAG STRUCTURE DISTURBED BY EXCAVATION SHALL BE R p H T I OF E WED WIT NEW WE ML OR REPAIRED TO THE WISFAC710M OF HE M ED.OKDS E WIN EER TEMPORARY EFROSION/SEDIMENTATION CONTROL MEASURES SHALL " EMPLOYED TO PROTECT ADJACENT PROPERTY AND STORM DRAINAGE FACILIFLUES :N omt SNOW" DULM3 III, lUxmI 9*- 111 lwm to w C.60% .0 "1 MINIIIIUM, IV a �" cm,",m Ct.90 SURIUCING TOP COURSE 6, 9 . INIP OP.% CIF bt r.010M VrAhft W0131M XRVO%I*f �O INIT W INNI %( MAMELP lit"M JWIC JINI rDt INC ft" 04 W10I 70 THE REFORATION OF THE ROADAWAY EXCA-DIN SHALL CDSE IMMED97LY AND CLUNUP SALL BE ?MVPT_Y ACCOMPLISHED F. ANN INK 0. VM WM STWO HW= M&I AW K INMW AN A WT 01WIM mv T4 MI 4mm x sx. A Ulm AA To Am IA.%G wo INc mc., B NO EXCESS OR UNSUITABLE MATERIAL SHALL BE WASTED ON CITY FIGHT-O—AY A. SUCH MATERIAL DUMPED ON PRIME PROPERTY MAY REQUIRE A GRADING PERMIT VERIFICATION WITH CITY OF EDMONDS PLANNING & DEVELOPMENT SEWICES IS REDDIRED 9. STREET SURFACES SHALl. BE GLEANED AT THE ENO OF EACH DAY'S DPERATION WITH A POWER BROOM OR OTHER APPROVED MEANS 10. NO OPEN CUT CROSSING OF � ROADS OR STREETS SHALL BE MADE WITHOUT THE APPROVAL OF THE ENGINEER H CRY OF EDMONDS 11. MA IMUM AMOUNT OF OPEN TRENCH IN ROADS SALL BE 400 UNEML FEET AT THE EN OF EACH DAY ALL DITCHES MUST BE IM KFILLED OR COVERED WITH STEEL PLATES AND BARRICADED WITH FIASHING WARNING LIGHTS TO PREVENT PEOPLE OR ANIVATS FROM FALLING IWO THE TRENCH. 12 FINA CLEANUP INCLUDING COMPLETE RESTORATION OF SHOULDERS. CLEANING OF DITCHES. CULVERTS AND GATC�BASLNS, AND REMEMA' OF LOOSE MATERIAL FROM DICK SLOPES OF D17CHES SHALL M07 EXCEED 1500 L F. BEHIND EXCAVATING OPERATIONS OR AS REQUIRED BY THE ENGINEER TREN�_U� 1. LONGITUDINAL TRENCH - PER CITY STANDARD OCTAL [23. 2 EX157ING PAVEMI 3 WIVE MATERIAL. BANK RUN GRAVEL, CSIC MAY BE REQUIRED BY IHE ENGINEER 4 KEA Ll I CUP. CLEAN, CAT & TASK [DOES WITH SURER CSS-1 & SEAL WITH NOT _AJ CILMENI 5 TEMPORARY R STORATION OF TRENCHES FOR OVERNIGHT USE SAILL BE ACED. RED HED BY USING COW MIX, AIB, OR STEEL PLATES PAT N SHALL BE MACHINE ROLLED FLUSH W17 EXISTING MOMENT AND SALE K P AGED PER SECTION 5-01 OF THE WEDQT/APWA SPECIFICATIONS ER DEPTH OVER UNDERGROUND UTULNES SALE CONFORM 70 FEDERAL AND S ATIE REGlJL0ONS 8 TRENCHES IN CONCRETE PAVEMENT SHALL BE RESTORED USING TIE MRS OR DOWEL MRS IN ACCORDANCE WON SECTION 5-05 OF THE WSDOT/APWA SPECIFICATIONS SEE 7EXT SECTIONS 8-02, 8-04. 8-05 GENERAL NOTES� I ALL 07ERALS AND WORK SHOWN ON THESE PLANS SAILL CONFORM TO THE CITY OF EDMONDS STANDARD PLAINS AND DETAIL-S, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL. STME. AND FEDERAL CODES, RULES AND REGUILATIONS -CURRENT INTERNATIONAL BUILDING CODE (ISO) -2012 WMI STANDARD SPECIFICATIONS FOR READ, BRIDGE AND MUNICIPAL CONSTRUCTION. -WASHINGTON 5 AHE DEPARTMENT OF ECOWDTF 51ORMWER MANADENEW MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND �E NUMBERS INDXI ON IHESE DRAWINGS PREFER 10 CITY OF EDMONDS STANOMM DMILS, UNLESS NOTED OTHERWISE 16. ALL RIOURED S70ROATER FACILNES MUST BE CONSTRUCTED AND IN OPERATION PRIOR HE INSlAILAION OF ANY PAVEMEW UNLESS 01HENISF APPROVED BY THE ENGINEER 17. ALL ROOF DRAINS. REMINDER FOUNDATION DRUNS. CATCH BASINS AND OTHER EXTERN L GRANS SHALL BE CONNECTED 70 THE STORM DRAINAGE SYSTEM. UWE' S NOTED 07HEWISE 18, CONTRACTOR SALL OBTAIN AND PAY FOR ALL PERM17S REQUIRED FOR INSWLA7ION OF ALL 517E IMPROVEMENT INDICATED ON THESE GRARRINGS 19. AS A MINIMUM REQUIREMENT ALL DISTURBED ARM ON AND OFF SITE SALL BE RETURNED TO THE EQUIVALENT BE THEIR -REC"STRUC710 M CONDITION IN ACCORDANCE WITH APPROPRIATE REDUREMENTS AND STANDARDS. 16NACIPY OF THESE APPROVED PLAINS MUST BE ON THE JOBSILE WHENEVER C RUCTION IS IN PROGRESS. 20. ALL DISTURBED SOIL AREAS SALL BE SEED- OR STABILIZED BY MITER ACCEPTABLE METHODS FOR THE PREVENTION OF - -SUE EROSION AFTER THE 4 DEVIATIONS FROM THESE PLAINS MUST BE APPROVED BY THE ENGINEER OF RECORD COMPLETION OF CONSTRUCTION SEE EROSION CDNTROL PLANS FOR SPECIFIC AND THE LOCAL GOVERNING AUTHORITY. OWING AND EROSION CONTROL REQUIREMENTS. 5 CONTRACTOR SHALL RECORD ALL APPROVED DEVAINGES FROM THESE PLANS ON A BUT 7 'AS-SUUJ` EPAWINGS AND SALL SUMMARIZE ALL AS-BUIL7 CONDITIONS ON ONE SET Of REP EDUCIBLE DRIWONGS PER 5UBMUTAL TO THE OWNER PRIOR PROJECT CON RETURN AND ACCEPTANCE A 57 OF AS -BUILT DRNWINUGS SUALL BF SUBMITTED TO PIC CITY OF EDMONDS PRIOR 70 FINAL APPROVAL OF THE BUILDING DCGUPAMM/FIW_ PROJECT APPROVAL. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FUTURES SHOWN HEREON PAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM ANAUBLE RECORDS A D SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY CON LEE IT IS THE SOLE RESPONSIBILITY 0. THE CONTRACTOR TO INDEPENGE WLY VERIFY THE ACCURACY OF 4 UTILITY LOCUONS SHOWN AND TO FURTH R DISCOVER AND PROJECI ANY OFFER UTILITIES NOT SHOWN HE EON WHICH AD BE AFFECTED BY THE IMPLE WATCH Of THIS PI AN ED NTRAGTOR SALT VIFRIFY LOCAVON, DEPTH. 517E "t"' MINI At ""17" of VI P*Wn C"I or . BEFORE TRENCHING FOR NEW THE TIES ENGINEER ASSUMES NO RESPONSIBTLITY FOR THE COMPLETENESS DR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENT D ON THESE DRAWINGS ENGINEER SHALL ED N071FIED IMMEDIATELY or CORE LOIS THAI ARISE LUST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRALION SALL VERIFY ALL CONDITIONS AND DIMENSIONS 9 THE PROJECT SITE BEFORE STARTING WORK AND STALL POMIFY CIANER'S REPRIES—TIVE 7 ANY DISCREPANCIES, 10 P PE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANCE DUE TO FIELD CONDII 11. CONTRACTOR SHALL OBTAIN A Co PY OF THE GEOTECIENICM. REPORT (WHERE APP I CABLE) AND SHALL THOROUGHLY TAMILAUR111 IM1111 WITH THE CONTENTS THERE A a SITE WON SALL BE PERFORMED IN STRIET COMPLANCE WITH THE RECOMMENDATIONS OF 7 IS REPORT 12 STRILE7TRAL ILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE REM"XII Or *4 NMW W930INICA 7 13 MAN -HOLES. CATCH BASINS, TIL171ES AND PAVEMENT SLIALL BEAR ON MEDIUM DENSE TO VTRY DENSE NATIVE SDIL OR COMPACTED STRUCTURAL FILL IF SOIL IS DISTURBER. SDF LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUPEGRAIDE ELEVATION REMOAT AND PEFFLACE WITH COMPACTED STRUCTURAL FILL PER GEOGRAPHICAL REPORT I� SEE SURVEY AND ARCH17EVURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDRIGS. LANDSCAPED ARDS AND OTHER PROPOSED OR EX191W SITE FEATURES 15 SEE AR H17EUUDL DROINGS MR PERIMETER TO NDATION DRAINS FOUND91ON DEWIN 5 SHALL BE INDEPENDENT OF OTHER SITE DMIN LINES AND SHALL BE TIGHTENED TO THE STORM GRAIN SYSTEM WHERE INDICATED ON THE PLAINS, APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE BY: 21 THE CONTRACTOR SALE VEER OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL N07 BE ALLOWED WITHOUT PRIOR APPROVAL 22 THIS PROJECT IS M07 A BALANCED EARTWOR PROJECT. BOTH EXPORT AND IMPORT OF BELL AND ROCK MATTERALS ARE REQUIRED 21 SP6S DP7 BE FINISHED GRADE SALL BE CONSTANT BETWEEN FINISHED CONTOURS OR T ELEVATIONS SHOWN 21 FINISHED GRACE SHALL SLOPE AWAY FROM BUILDING WALLE AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OP HE FEEI. 25 CONTRACTOR SHALL BE RESMINSIBLE FOR AND SHALL INSTALL AND INANTAN SHORING AND BRACING AS NECESSARY 70 PROTECT WORKERS, EXISTING BUILDINGS, SOFFITS. N NWAYE, UTILITIES AND OTHER EXISTUNG AND PROPOSED IMPROVEMENTS AND MIMI row Laz of Wom w :A" tw6MI towft" SHALL AM HE RESPONSIBLE FOR REMOVAL OF SHORING AND SPACING AS REQUIRED 21 OR SHALL OBTAIN APPROVAL FROM THE CUP AND rOLLOW CITY CONTRA EDO RES FOR ALL WAIER SERVICE INTERRUPTIONS HYDRANT SHI STREET CLOSURES OR OTHER ACCESS RESTRICTIONS COK17RACTOR SAILL NET RELOCATE OR ELYINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WR171N APPROVAL FROM THE TIRE NAL 27 CODRIGNATE AND ARRAINCE FOR ALL UTILITY CON ECTLENS, UTILITY RELOCATING AN D/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES, CONNEC71ONS 70 EX17ING UTILITIES SALL BE ME ONLY WIDTH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES 28 EXIS71NG UTILITY LINES IN SEWED WHICH ARE DAMAGED DUE 70 CDASTRUGTQN WO K SAILL BE REPAIRED AT CON7W4TDR'S EXPENSE AND INSPECTED AND ACCEPTED BY GUY OF EDMONDS AND OWNER'S REPRESENTATIVES PRIOR M MCKFILLING 29 NEW TILPY LOCATIONS ARE UNERALLY SHOWN BY DIMENSION, WHERE NO DMEWSIONS ARE INDICATED, LOCATIONS My BE SCALED FROM DRAWIN S. FIELD ADJUSTMENI S SALE BE APPROVED BY OWNER'S REPRESENTAWE AND CITY 30 WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 5" OR LESS. PLACE POLYLIPFILENE PLASTIC MAY AS A CUSHION BE I WEEK THE UTILITIES 31 SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UPLUES WITHIN THE BUILDING 02 SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK 33 SEE LANDSCAPE OWINGS (WHERE APPLICABLE) FOR SUE IRRIGATION SYSTEM CITY INSPECTION REOU IRED ON ALL EROSION CONTROL MEASURES BEF 0 RE WORK CAN BEGIN PSE / INFRASOURCE CONSTRUCTION NOTES FQR SNOHOMISH COUNTY 1. FIELD LOCATE ALL UTILITIES TWO WORKING DAYS PRIOR TO CONSTRUCTION AT I-EI 2. NSTAL ONE POUND ANODE EVERY 1000' OF DETECTION WIRE / INSTALL ANODE AND TEST LEAD WIRES PER PIE STANDARDS- , - ALL MAIN TIE-IN'S SHALL BE GAUGED AND MONITORED FOR CHECKING FEEDS. 4. INSTALL VALVES OUT OF TRAFFIC WHERE POSSIBLE 5. ANY CHANGE IN ROUTE OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE PROJECT MANAGER 6. ALL PROPOSED SERVICES ARE SHOWN AS:F�T.j 7. ALL J'�5' PAVING CUTS SHOWN AS: 8 ALL WORK WITHIN SNDHDVISH COUNTY TO COMPLY WITH EROSION AND 5 DIVENTATION CONTROL RLOUIREMENTS OF SNOHOMISH COUNTY CODE, CHAPTER 3063A.220, NOLL DING: A PREVENT DR MINIMIZE THE TRANSPORT OF SEDIMENT ONTO PAVED SURFACES DURING CONSTRUCTION. I A Y SOIL STOCKPILES SHALL BE STABILIZED AND PROTECTED WIT H SEDIMENT R TENTION 3MP'O WITHIN 24 HOURS. EXCAVATED MATERIALS SHALL BE PLACED ON TH E U FRILL SIDE OF TRENCHES, UNLESS INCONSISTENT WITH SAFETY AND SITE CONSTRAINTS C DISTURBED AREAS MUST BE STABILIZED AFTER 2 DAYS (BETWEEN OCTOBER I AND APRIL 30) OR AFTER 7 DAYS (BETWEEN MAY 1 AND SEPTEMBER 30). EROSION CONTROL MATERI LS MUST BE KEPT ON SITE AND IN ADE UATE QUANTITIES AT ALL TIMES, NO MORE THAN 500' OF CONTINUOUS TRENCH MAY REMAIN OPEN AT ONE TIME UNLESS CHECK DAMS ARE USED. D, STORM SEWER INLETS RECEIVING STOP WATER RUN-OFF SHALL BE PROTECTED WITH FILTER FABRIC OR CTWM %WAFM MMI COVIETNI f"It ~97-tAMW VI 9. CALL SNOHOMISH COUNTY INSPECTOR -8 HOURS PRIOR TO CONSTRUCTION AT (425) 388-3385. 10. GASHED LINES ( --- � ARE TO BE USED TO VERIFY/CORRECT INSTALLATION OF MAIN ON AS -BUILT. ITUI I OIAT ONE ARE AT T11-11 TO MAIN All I INITI 11 1111 ISTAILL11 NOTED, 1, , N ETURN ALL AS-SUILTS TO INFRASOURCE PROJECT MANAGER. 12. CUI PAI M000 ON VAI PRO"" VALL COWON 10 OX STANI 13 PREFERR C METHOD OF CONSTRUCTION UNDER HARD SURFACE IS BORE, PREFERRED METHOD OF CONSTRUCTION UNDER SOFT SURFACE IS OPEN TRENCHING. H��IJISII COUNTY %07 I A THE ENGINEERS DISCRETION. PRIOR TO COMMENCING ANY CONSTRUCTION, PHDTOGRA HE DEPICTING PRE-EXISTING ROADWAY CONDITIONS WILL BE REQUIRED EVERY 50 FEET IN PAVED AREAS OR ANY OTHER LOCATION AS SPE CITED BY THE ENGINEER. 2. SIGNINO. FTAGGINO AND TRAFFIC CONTROL SHALL BE IN ACCCORDANCE WITH THE E STANDARDS, THE ASCOT TRAFFIC MANUAL AND THE NUAL OF UNIFORM TRAFFIC CONTROL DEVICES 3. ONE LANE OF TRAFFIC SHALL REMAIN OPEN AT ALL TIMES. ATTENDED BY FI-AGMEN AND APPROPRIATE CONSTRUCTION SIGNING PROVIDE THE ROAD SHAL BE RESTORED 70 TWO-INAY TRAFFIC AT THE END OF EACH WORKING DAY. APPLICATIONS FOR TOTAL ROAD CLOSURES MUST BE FILED WITH END OMISH COUNTY PUBLIC WORKS AT L-E ST 5 DAYS PRIOR TO THE ANTICIPATED CLOSURE 4. EXISTING DRAINAGE DITCHES, CULVERTS, LTC , SHALL BE KEPT CLEAN AT ALL TIMES TEMPORARY DIVERSION OF ANY DRAINAGE SYSTEM WILL NOT BE PERMITTED WITHOUT THE CONSENT OF THE ENGINEER. ANY DRAINAGE CULVERT CATCHBA IN, MANHOLE OR OTHER DRAI MADE STRUCTURE DISTURBED BY EXCAVATION SHALL BE REPLACED WITH NEW MATERIAL DR REPAIRED TO THE SATISFACTON OF THE ENGINEER. TEMPORARY EROSION/SECIMENTAT­ C"TRDL MEASURES SHALL BE EMPLOYED TO PROTECT ADJACENT PROPERTY AND STORM DRAINAGE FACILITIES. 5, GRAVEL I GUILDERS DISTURBED By EXCAVATION SHALL BE SHAPED TO COU TY STANDARDS AND PROVIDED WITH A MINIMUM OF 6 INCHES COMPACTED CRUSHED sw-cmo To- COUML 6 IF IN THE OPINION OF THE ENGINEER, WEATHER CONDITIONS DETERIORATE TO T E POINT WHERE THE TRAVELED ROADWAYS ARE UNSAFE FOR THE PUBLIC OR GET MENTAL TO THE RESTORATION OF THE ROADWAY. EXCAVATION SHALL CEASE IMMEDIATELY AND CLEANUP SHALL BE PROMPTLY ACCOMPLISHED 7. &t ftW OR OW4 VI STMID AI&4 COCIIIII ROIT-01H-UkV wJS1 Nr P CED AT A SAFE DISTANCE FROM THE TRAVELED ROADWAY IN SUCH A MANNER AS TO AVOID FALLING ONTO THE ROADWAY. 8. NO EXCESS OR JNSUITABL MATERIAL SHALL BE WAITED ON COUNTY RI Of- AW S=14 WATEftL OWWO ON "11I PRI Wv REOUI;E A III NO P RMIT. VARIFICATION WITH SNOHOMISH COUNTY PLANNING k DEVELOPMENT SERVICES IS REQUIRED. 9. STREET SURFACES SHALL BE CLEANED AT THE END OF EACH DAY'S OPERATION WITH A POWER BROOM DR OTHER APPROVED MEANS. 10. NO OPEN CUT CROSSINGS OF COUNT ROADS OR STREETS SHALL BE MADE WITHOUT THE APPROVAL OF THE ENGINEER. 11. MA IMUM AMOUNT OF OPEN TRENCH AT ROADS SHALL BE 100 LINEA FEET AT THE END OF EACH DAY. ALL DITCHES MUST BE BACKFILLED OR COVERED WITH STEEL PLATES AND BARRICADED WITH FLASHING WARNING LIGHTS TO PREVENT PEOPLE OR ANIMALS FROM FALLING INTO THE TRENCH 12. FINAL CLEANUP INCLUDING COMPLETE RESTORATION OF SHOULDERS. CLEANING OF DITCHES, CULVERTS AND CATCHEASINE. AND REMOVAL OF LOOSE MATERIAL FROM BACK EL RES OF DITCHES SHALL NOT ESCEED 1500 LF, BEHIND EX -TING OPERATIONS OR AS REQUIRED BY THE ENGINEER. ONE RWM�� CB INLET PR07ECTION EXIST PAVED STREET NO SCALE RII ERAU tow, 8'. 11 GA IELI�E SIR ED AL RINGS TTACH rt:1. rAIIIIIN, V WIFE DDU LAS ELFVATID SILT FENCE DETAIL . -11 NO.1 ORAGEC m aslywo G-DE SLOPE .I IN "o GRAVEL 1-r�'�-LTCR FA RC -N A R-1.NDH r S� TRFNrH NQTFq I LORD T11 NAL TRE" I - I' IIIHALT C-1 B CIER­ TIA NINEQ TRENCH - 2' ASPHALT CLASS 8 OVE­ WHERE 1111PLE CROSSINGS BY SAIE UTILITY, L EXISTING PAIE.ERF - 6' ACP OR 2- 1CP . 4" A-�B T;ALONSIT DINAL TRENCH 5� ATS INSVIRII TRINIH IF CONCRETE RESTERI All DR 2� 1CP I SHALL BE IN ACCORDANCE WITH SECTION 5-05 OF THE W'OCT/APWA SPECIFICATIONS IFNS'T` MATERIAL, BANK RUN SPAVEL, GETC OR CONTROL C 11 FILL -1 11 F­ BY Ill "NEEK LINE CUT. CUS 7 SAN. EAT , 7.K CODES WT� BEALE1 . I- WITH HOT ASPHALT CEMENT :S -7E,MPDR RY REST -ION OF TRENCHES FOR Jk VIX�ERN GHT SHALL 9' ACCOMPLISHED BY USING =LD AT., DR STEEL P-SE 4VIE-E I A'NH ALL. BE MAECHINE RD LED FLUSH WITH EXISTING AL 9 PI_ACED PER SECTION - OF THE WIDOT/Al" SPEC'FCA71CN' a COVER DEPTH OVER UNDERGROUND UTILITIES SHALL CONFORM 70 FEDERAL AND GTA7E REGULIJIONS USIN TR VCHES IN CONCRETE PAVEMENT SHALL BE RESTORED C'71E EAFS� ORT DOWEL'SARS IN AS ORDANCE W17H -1 -11 , I - SEE TEXT SECTIONS 8-02. B-04. 6-05 GENERAL R/W USE RESTORATION REQUIREMENTS (8-040) 1. AT THE ENGINEERS DISCRETION, PRIOR TO COMMENCING ANY GO NS RUCTION, PHOTOGRAPHS DEPICTING PRE-EXISTING ROADWAY CONDITI NS WILL BE RE.UIRIG EVERY ED FEET 11 PAVED AREAS OR ANY OTHER LOCATION AS SPECIFIED BY THE ENGINEER. 2 SIGNING, FLAGGING AND TRAFFIC CONTROL SHALL BE IN A CORDANCE WITH THESE STANDARDS. THE WSDCT TRAFFIC MANUAL AND THE MANUAL OF UNIFORM TRAFFIC NTRCL DEVICES. 3. ONE LAM OF TRAFFIC SHALL REMAIN DIEN AT ALL TIMES, ATTENDED BY FIUAGMEN AND APPROPRIATE CONSTRUCTION SIGNING PRO IDED THE ROAD SHALL BE RESTORED TO TWO-W Y TRAFFIC AT THE END OF EACH WORKING DAY. APPLICATIONS FOR TOTAL ROAD C LDSURES V ST BE FILED WITH SNOHOMISH COUNTY PUBLIC A.11S AT LEAST 5 DAYS PRIOR TO THE ANTICIPATED CLOSURE. 4. EXISTING DRAINAGE SITE ES, CULVERTS, ETC , SHALL BE KEPT CLEAN AT ALL TIMES TEMPORARY DIVERSION OF ANY DEAN AGE SY EM WILL NOT BE PERMITTED W17HOUT THE CONSENT OF THE ENGINEER� ANY GRAINA E CULVERT. C4TCHBASIN, MANHOLE OR OTHER DRAINAGE STRUCTURE DISTURBED BY EXCAVATION SHA; L BE REPLACED WITH NEW MATERIAL OR REPAIRED TO THE SATISFACTION OF TI E ENGINEER. TEMPORARY EROSION/SEDIMENTATION CONTROL MEASURES SHALL BE EMPLOYED TO PROTECT ­ACIENT PROPERTY AND STORM DRAINAGE FACILITIES I GRAVEL SHOULDERS DISTURBED BY E CAVATION SHALL BE SHAPED T6 COUNTY STANDARDS AND PROVIDED Al A A MINIMUM OF 6 INCHES COMPACTED CRUSHED SURFACING TOP COURSE ' IN THE OPINION OF THE ENGINEER, WEATHER CONDITIONS RTER'DRATE TO THE POINT WHERE THE TRAVELED ROADWAYS ARE U NSAFE OR THE PUBLIC OR DETRIMENTAL TO THE RESTORATION OF TH" GAD Ay. EXCAVATION SHALL CEASE IMMEDIATELY AND CLEANUP I HALL " PROMPTLY ACCOMPLISHED 1. ALL PIPE OR OTHER MATEIRIAL STORED ALONG COUNTY RIGHT-OF-WAY MUST BE PLACED AT A SAFE DISTANCE FROM THE TRAV LED ROADWAY IN SUCH A MANNER AS TO AVOID FALLING ONTO TH E ROADWAY EXCESS OR UNSUITABLE MATERIAL SHALL BE WASTED ON C 'bUN" RIGHI ANY SUCH MATERAL D NPED � PRIVATE PROPERTY. MAY REQUIRE A GRADING FERMI T I RIFICATION WITH SNOHOMISH COUNTY PLANNING & DEVELOPMENT SERVICES IS REOUIRED 9 STREET SURFACES SHALL BE CLEANED AT THE END OF EACH DAY'S OPERATION WITH A PO'WER BROOM OR OTHER APPROVED MEANS. 10 NO OPEN CUT CROSSING OF COUNTY ROADS OR STREETS SHALL BE MADE WITHOUT T"l APPROVAL OF THE INGINEER 1, MAX I MUM AMOUNT OF OPEN TRENCH IN ROADS I ILL BE ADD LINEAL FEET AT THE END 01 EACH DAY, ALL DITCHES MUST BE BACKFLLEO OR COVERED WITH STEEL PIUATES AND BARRICADED WITH FASHING WARNING LIGHTS TO PREVENT PEOPLE OR ANIMALS FROM FALLING INTO THE TRENCH. 12 FINAL CLEAN P INCLUDING COMPLETE RESTORA ION OF SHOULDERS . CLEANING Cz DITCHES, CULVERTS AND CA7CHBASINE, AND REMOVAL OF LO SE MATERIAL FROM BACK SLOPES OF DITCHES SHALL NOT EXCEED I EDO L . BEHIND EXCAVATING OPERATIONS OR AS REOU IRED By THE ENGINEER, 1� A. ­ IS. OP. -I U-P-1-.1 Y., �c _.­ Y.. ... I - 11