622 Bell St-Approved Cost Est.-Sewer.pdfSite Improvement Bond Quantity Worksheet S15 Webdate: 04/03/2015
L-9 King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: 622 Bell Street LLC Date: 30th March 2017
Location: 622 Bell StReet Edmonds, WA. 98020
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
SITE BONDS.As
Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
END -ro IM tWPLD 4*1L *
F:O�It> ev 1'-4V'"LS Wwp-g���Ihx tOT^LL*-r(OM
61r- A- QFW E9W9V- LA-fvq� - C474 v,)ILL olx-apm�/
GAPW,**, -Qkq MIK umeb -S164iZ41-7.
1KJ -"hS Lfrt"44., ( "WO, otz-
C"S' rw- 9"W-45MAWT-
ATP12-O&O -eOWD ftWVJ-�-( �- et(16100d—
P
A ENGINE ING
/-Z:?,/Vl 7
Owe:
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Reference #
Unit
Price
Unit
Quantity
# Of
Applications
Cost
EROSIONISEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESCA
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
30
45
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESCA 0
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESCA 1
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESCA 2
$ 12.00
LF
Piping, temporary, CPP, 8"
ESCA 3
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESCA 5
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESCA 6
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'xl 5'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 1 00'x1 5'xl'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see Paw 9)
Each
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
SITE B0NDS.xIs
$ 45.00 IA5-
$ 1350
$ bb.bU
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
I Cost
QuantT
Cost
Quant.
Cost
GENERAL ITEMS
N a,_
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI-2
$ 9.00
CY
15
135.00
Clear/Remove Brush, bv hand
GI - 3
$ 1.00
SY
C lea ri ng/Grubbing/Tree Removal
GI - 4
Is 10,00000
Acre
Excavation - bulk
GI - 5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
_CY
151
75.00
Fencing, cedar, 6'high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6'high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20'
GI - 9
$ 1,400.00
Each
Fencing, split rail, Thigh
GI - 10
$ 15,00
LF
Fill & compact - common barrow
GI - 11
$ 2500
CY
15
375-00
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39,00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65,00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 9000
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
G1 - 17
$ 2.50
SY
Grading, fine, with grader
G1 - 18
$ 2.00
SY
10
20.00
Monuments, 3'long
GI - 191
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
1
850.00
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers
GI - 24
$ 120.00
HR
8
96000
Trail, 4" chipped wood
GI - 251$
8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
2.41500
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
SITE BONDS REVISED.xIs Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
E)l
xisting
Right-of-wa
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROADIMPROVEMENT
No.
AC Grinding, 4'wide machine < 10OOsV
Rl- 1
$ 3000
SY
AC Grinding, 4'wide machine 1000-200osV
RI - 2
$ 16.00
SY
AC Grinding, 4'wide machine > 20OOsV
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
5
175.00
Barricade, tVpe I I I ( Permanent
R1 - 6
$ 56.00
LF
Curb & Gutter, rolled
R1 - 7
$ 17.00
LF
Curb & Gutter, vertical
R1 - 8
$ 12.50
LF
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 550
LF
Curb. extruded concrete
RI - 11
$ 700
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
20
37.00
Sawcut, concrete, per 1 " depth
RI - 13
S 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
201
40.00
Shoulder, AC, ( see AC road unit price
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
Rl - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and disposal
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
R1 - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and disposal
RI - 20
$ 40.00
SY
Sign, handicap
Rl - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk
RI - 23
$ 3.00
SF
IStriping, 4" reflectorized line
RI - 24+
0500 1
LF
Page 4 of 9
SUBTOTAL
252.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
SITE BONDS REVISED.As Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
_quant. cost
Quant. Cost
_L_
ROAD SURFACING
No.
(4" Rock 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS-2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS-3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS-4
$ 28.00
SY
10
280.00
HMA Road, 2", 4" rock, Qty. over 2500 SY
RS-5
$ 21 00
SY
HMA Road, 3", 9 1/2" Rock, First 250O.SY
RS - 6
$ 4200
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SY
RS-7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1 ", 4" Depth
RS - 12'
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 12;
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14.
$ 10.00
SY
PCC Road (Add Under Write-ins w/Design)
RS - 15
Thickened Edge
IRS - 17'
$ 8.60
LF
Page 5 of 9
SUBTOTAL
280.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction Version: 03/02/2015
SITE BONDS REVISED.xIs Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant Cost
T
Quant. Cost
DRAINAGE (CPP= Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Averag of 4' cover was assumed. Assume perforated PVC is same price as solid F
Access Road. R/D
D - 1
S 21.00
SY
Bollards - fixed
D-2
$ 240.74
Each
Bollards - removable
D-3
$ 452.34
Each
* (CBs include frame and lid)
CB Type I
D-4
$ 1,500.00
Each
CB Type IL
D-5
$ 1,750.00
Each
CB Type 11, 48" diameter
D-6
$ 2,300.00
Each
for additional depth over 4'
D-7
$ 480.00
FT
CB Type 11, 54" diameter
D-8
$ 2,500.00
Each
for additional depth over 4'
D-9
$ 495.00
FT
CB Type 11, 60" diameter
D-10
$ 2,80000
Each
for additional depth over 4'
D - 11
$ 60000
FT
CB Type 11, 72" diameter
D - 12
$ 3,600-00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D-26
1$ 5600
LF
Culvert, CMP, 30"
D-27
$ 78,00
LF
Culvert, CMP, 36"
D-28
$ 130-00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
S 270.00
LF
lCulvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
SITE BONDS REVISED.As Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Cost
Quant.
Cost
Culvert, Concrete, 8"
D-32T$
25.00
LF
Culvert, Concrete, 12"
D-33
$ 36.00
LF
Culvert, Concrete, 15"
D-34
$ 42.00
LF
Culvert, Concrete, 18"
D-35
$ 48.00
LF
Culvert, Concrete, 24"
D-36
$ 78.00
LF
Culvert, Concrete, 30"
D-37
$ 125.00
LF
Culvert, Concrete, 36"
D-38
$ 150.00
LF
Culvert, Concrete, 42"
D-39
$ 175.00
LF
Culvert, Concrete, 48"
D-40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 1600
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 3500
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ %00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 13000
LF
Ditching
D - 49
$ 950
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 2800
LF
French Drain (3'depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6'deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1.350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1.700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
ITrash Rack, 21"
D - 64
$ 550.00
1 Each
Page 7 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction Version: 03/02/2015
SITE BONDS REVISED.xls Report Date: 5/18/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
xisting
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. I Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base course
PL-2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum ���
I
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
SANITARY SEWER
No.
Each
Install new 6" lateral and
WI - 1
$ 7M0.00
EA.
1
7000
WI - 2
LF
Install cleanout and cap
WI - 3
$ 600.00
EA.
1
600
B-inch sewer main replacement
WI - 4
LF
6
720
WI - 5
WI - 6
Wl - 7
WI - 8
wi - 9
wi - 10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
*KCC 27A authorizes only one bond reduction
SITE BONDS REVISED.xIs
8.320.00
11,267.00
3.38010
14,647.10
B
x U016 Pew I tj
C
Ak III I -Cos. -1 AI 91 0&1 -
V.
D
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/18/2017