Loading...
650218.pdfPermit Fin B!OINEBS xP !�'Gl I IP , . 2� JOB ADDRESS //4// — SIDE YARD TELEPHONE NUMBER USE ZONE BUILDING PERMIT NUMBER 650218 REAR YARD [] YES 13 NO 0 �.OT AREA -VA—RIANUM —NUMBER ALL BUILDING SETBACKS NOTE: TO EAVE LINES n- ADDRESS -Encroachment Permit PERMIT NUMBER b-rnWjU-r U�� V�U�j Required 1­1 YES rl NO YES 13 NO BUILDING VALUATION BUILDING PERMIT FEE NUMBER OF STORIE PLUMBING NEW DEMOLISH 3 PERMIT FEE ElADD 4 HEAT & GAS LINE PERMIT FEE ALTER RESIDENTIAL NUMBER OF REPAIR NON-RESIDENTIAL DWELLING UNITS 4AMOUNT 5 DEMOLITION PERMIT FEE 01 DUE I hereby acknowledge that I have read this application; that the in- ATTENTION formation given in correct; and that I am the owner, or the duly author- ized agent of the owner. I agree to comply with city and state laws regu- THIS PERMIT lating construction; mul In doing the work authorized thereby, no person AUTHORIZES will be employed in violation of the Labor Code of the State of Washington ONLY THE relating to workmen's Compensation Insurance. WORK NOTED NOTE: PERMIT LIMIT ONE YEAR INSPECTION SIGNATURE JPWN19" Wt N�1) DEPARTMENT CITY OF EDMONDS PLOT PLAN CHECK & APPR . OVED PR 6.1107 FILE [] YES [3 NO - O-V 1 1 ­4 , C-1 V I APPLICATION APPROVAL This application Is not a pernilt until signed by the Director of Building Inspec- tion, or his deputy; and fees are paid, and receipt is acknowledged in space provided. W !-rJ I CITY OF EDMONDS, WASHINGTON BUILDING PERMIT Applicant h byfucerHtifies that a plot, plan, drawings, and sufficient details to indicate tiolrthe inten to fi all requirements of this code are attached hereto. Application is hereby made for permit to do the following work: ............... :2t . . .... . .... . ................ . .............................................................................. . ......... ... .. ............................................................................... . . ................................ Lot........................ 7 ........................... 1. Building dimensions .................. 1;6 ..... X.... ............................ 2. Lot dimensions ......... A�:Z-45� ........ X ...... ........... 3. Building will be ........... / ......... stories. 4. Basement ........................ 5. Occupancy of building will be .......... ....... .......................................... 6 . ..... I ,? . ...... gf I fro� the nearest ��oining line. 'e * olli�4 7. Owner .... . .. . ... , I .......... 7 ........ E ..... ...... ........ 8. Owner's Address .......... !:r:4! . . .. ....................................................................... . ............... 9. Builder ................ ......................................... . .................. 10. Builder's Addre&,, . ..................... .................................... . ...... g. /t') . *­ ............... ** ... ­­ .... ..... *­ .... .... Date-�-'.'� . .............................. ................. (Owner or his agent) a This Space Is For City Inspector Only I F Yranted to do the work described hereon, according to the approved plans and specifications pertaining hereto Permission is hereby 1, subject to compliance with the ordinances of the City of Edmonds. PERMIT. N? .'.910 Estimated cost ..................... Life of permit ............. z .... >.'?� .......... date Plans filed: Yes 2"'�No 0 Department of Buildh City of Edmonds i. The building permit fee which applicant pays when permit Is issued shall be based on estimated cost of the proposed structure, at the rate of $2.00 for each Siollo.00 of cost. If the actual cost of the structure, when finally determined, exceeds the estimated cost by more than 5%. applicant agrees to pay an additional fee of $2.00 for each $1000-00 Of such excess cost. 2. Whenever a contract for construction Is executed for any structure costing more than $1000.00 for which a licensed architect or engineer is not required by the Building Code of the City of Edmonds, the application for a building permit shall be accompanied by a Icopy of the contract and a copy of the detailed specifications. 3. Prior to employing any labor or commencing work, notify the Industrial Insurance Division of the Department of Labor and Industries, giving an estimate of the payroll and make monthly reports of payrolls. Full Instructions should be obtained from the nearest office of the Department of Labor and Industries. Before final payment, the owner should obtain a release from the general contractors who in turn should obtain release from all sub -contractors. 'rhe releases should be Rttested by the Department of Labor and Industries. The above procedures are requirements of the State Industrial Insurance Act. �4 CITY OF EDMONDSo WASHINGTO BUILDING PERMIT 9"nt hereby certifies that a plot-, plan, dmwings,,and sufficient details to indicate I I t I io . n.tD fulfill all requirements of this code are attached hereto. Q%is hereby made for permit to do the following work: ri;.*.';i...'. ...................... .................................................. V ....... .... ................................ .... .... . ................ . ................ ........... .... . ... ............... z ...... ........... ....... ...... . ...... . .................. . .. . . .... . ... a ..... d M ............. 1. Buil ing dimensions ..... ..... ............... X .... dimensions ........ .......... x ......... 2., Lot 3. Build ing will be ........ .............. stories. 4. Basement .... ...... 5 Occu of building will be ................... . . ... ........... ................................. 'n ........ T djo ing line. 6. ....... :- feet from the n r t adjo 7. Owner .... ....... . . . .. ..... .... .................................................................... 8. Owner's Address ....... ....... . ................ . ............... ................ ..... . ..... 9. Builder ............................... .... ... ..... ......... .............. 10. Builder's Address .............................................. . ...................................... . .................. .................................................................................................. Date ....... .................... 19.�Z ......... or his aii;�6) A 7 This Space Is For City Inspector Only JVQ V Permission is hereby granted to do the work described hereon, according to the approved plans and specifications pertaining hereto, subject to compliance with the ordinances of the City of Edmonds. PERMIT N? 658 Estimated cost $144.5 . ....... Life of permit. .... 4�� ......................... date I Plans filed: Yes Z[--"'No El I ............................ Received by (Issuing Officer) Department of Buildings City of Edmonds 1. The building permit fee which applicant pays when permit Is issued shall be based on estimated cost of the proposed structure, at the rate of $2.00 for each Si000xo of cost. U the actual cost of the structure, when finally determined, exceeds the estimated cost by more than 50/c, applicant agrees to pay an additional fee of $2.00 for each $1000.00 of such excess cost. 2. Whenever a contract for cothtruction Is executed for any structure costing more than $1000.00 for which a licensed architect or engineer Is not required by the Building Code of the City of Edmonds. the application for a building permit shall be accompanied by a copy of the contract and a copy of the detailed specifications. 3. Prior to employing any labor or commencing work, notify the Industrial Insurance Division of the Department of Labor and Industries, giving an estimate of the payroll and make monthly reports of payrolls. Full instructions should be obtained from the nearest office of the Department of Labor and Industries. Before final payment, the owner should obtain a release from the general contractors who In turn should obtain release from all sub -contractors. The releases should be arrested by the Department of Labor and Industries. 71e above procedures are requirements of the State Industrial Insurance Act. i