Loading...
650349.pdfM , BUILDING DEPARTMENT Applicant M PERMIT APPLICATION Inside Heavy Lines NA39EI (0 14 15 OF is a? PHONE NUMBER I [3 YES E3 NO BUILDINE4 PERMIT 650349 NUMBER 13 YES C] NO 10 YES 13 NO r GROUP I I R1 �L ow I BUILDING VALUATION L 0 WORK TO)�E DONE 2 BUILDING PERMIT FEE 70" 0 3 PLUMBING PERMIT FEE HEAT & GAS LINE 4 PERMIT FEE El L A3 NEW ADD DEMOLISH SIGN 10 0 FENCE NUMBER OF STORIES 5 SIGN PERMIT FEE 6 DEMOLITION PERMIT FEE ALTER REPAIRI - RESIDENTIAL NON-RESIDENTIAL Ro NU E F LLING UNITS 7 PLAN CHECK FEE 8 AMOUNT DUE ?�J I hereby acknowledge that I have read this application; that the In- formation given is correct; and that I am the owner, or the duly author- Ized agent of the owner. I agree to comply with city and state lawn regu- iaung construction; and In doing the work authorized thereby, no person win be employed In violation Of the Labor Code of the State of Washington relating to Workmen's Compensation Insurance- (Except Demolitions which shall be NOTE: Permit Limit One Your completed In ninety days.) SIGNATU (0 R OR AGENT) SIGNED 4-Y J ATTENTION THIS PERMT AUTHORIZES ONLY THE WORK NOTED INSPECTION DEPARTMENT CITY OF EDMONDS APPLICATION APPROVAL This application is not a pernilt until signed by the Director of Building Inspec- tion, or his deputy; and fees are paid, and receipt Is acknowledged in space provided. DIRECTOR'S SIGNATURE Z7 NOTE: APPficant subject to Plan Check Fee This remit covers work to be done on private property ONLY. Any construction on the public domain (curb@, sidewalks, driveways, marquess, etc.) will require separate Perm!56ion. PH 6-1107 FILM L . .... ..... oe V. 'i, :L 0outh Fdmonds Wesh- 317 5th AVO. I 10 G TY OF EDMONDSs I WASHINGTON BUILD ING PERMIT ifies that a plot, plan, drawings, and sufficient details to indicate 11411 requirements of this code are attached hereto. 7 made for permit to do the following work: . ............................................................. . ......... Block ....... �7 .. ................... i� ............................. This Space Is For city inspector ORIYJ C4 tf (4z . .. . .. . . . .. . ......... ............................. ................ ........... ... . . .. ..... ........... . .. ....... . .... .... . .... . . .......... . 2b, .......... .... ........ . .................. 6 .......... .. X ..... 7 ... 6 ................ I. Building dimensions a ............... 2. Lot dimensions .... X ... .................... 3, ing ;will be ...... ............... stories. Bu ........... asement 5 0 of building will be ..... .................................................... ccupancy . ...... �.Q ........... feet from the nearest adjoining line. -7 ... all-ur, A Owner. ............................................................. . ..... ---- - --- 8 0wri 1 er a Address ........ ��i . .......................... . ..................... 9. Builderliff-LL ... 10. Builder's Address. ............ .............................................. 0 ...... . ................... ................................................................................................... Date..J.0 .. .................. 19." a gent) (Owner or J Permission is hereby granted to do the work described hereon, according to the approved plans and specifications Pertaining ha-eto. subject to compliance with the ordinances of the City of Edmonds. 4.7/ Life of permit.... .1-A ....... I date PERMIT N? 633 R -v (Issuing Officer) Department of Buildingps City of Edmonds 1. The building permit fee which applicant pays when permit is issued shall be based on estimated cost of the proposed structure, at the rate of $2.00 for each: $1000.Oo of cost. If the actual cost of the structure, when finally determined, exceeds the estimated cost by more than 5clo. applicant agrees to pay an additional fee".. of $2.00 for each $1000-00 of such excess cost. 2, Whenever a contract for construction is executed for any structure costing more than $1000.00 for which a licensed architect or engineer Is not requited by the Building Code of the City of Edmonds, the application for a building permit shall be accompanied by a copy of the contract Ind a copy of the detailed. specifications. 3. prior to employing any labor or commencing work. notify the Industrial Insurance Division of the Department of Labor and Industries. giving an estimateof the payroll and malce monthly reports of payrolls. Full instructions should be obtained from the nearest office of the Department of Labor and industries. Before final payment, the owner should obtain a release from the general contractors who in turn should obtain release from all sub-contractots. The releases should be Ruested by the Department of Labor and Industries. The above proceduzes are requirements of the State Industrial Insurance Act. I