Loading...
6th & Elm Gas Main Move.pdfo VIIS DOCUMENT HAS BEEN REVIEWED FOR GENERAL CONI PX11 III 1,11AW1111 DESIGN CONCEIrf AND THE F0110%% ING IS NO IT D; [3, NO EXCE PTIONS T.A KEN' NI W, CORUCTION'S NOTED St BMIT SPECIFIED ITEM RE% ISE AND RESU"IT REJECTED By - Date: 21 STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES I NO —GAS CUSTOMERS. OR DISTRIBUTE FLYER 11-1 A MINIMUM OF TWOWORKING DAYS PRIOR TO A PLANNED 1A.E 2 INSTALL ON FOUND ANOCE FOR EVERY 10W OF LOCATING VARE INSTALL ANOCIE AND MST LEAD WRES PER PSE GAS OPERATING STANDARD 2525 23(XI 3 NJk NTAIN CA—C PROTECTION! FOR STEEL WINS BY THE USE Of CONTINUITY BONDS OR OTHER MEANS DETERNINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 26M 1300 4 INSTA L ANODES AND MST LEAD WIRES AS REQUIRED PER FSE GAS FIELD PROCEDURES 4515-0 AND 4515 ­0 AND PSE GAS OPERAJING STANDARD 2600 1200 MST LEAD WRES ME REQUIRED ON ALL TRANSITION FITTINGS 5 INSTALL URE VALME AT PROPERTY LINE OR I- PE WHIP AT WIN (� REQUIRED) ON NEW AND EXISTING SERVICES PER PSE GAS OPERATING STANDARD 255o 1600 6 REFER TO PSE GAS OPERATING STANDARD 2525 1700 FOR MAIN AND SERVICE COVER REQUIREMENT. 7 WINS AND SERVICES SHALL BE TESTED AND PURGED P RPSEGASOPERATINGSTANDARDS252-00.252-0 AND 2525 1200. AND PSE GAS FIELD PROCEDURE 4100,1500 a PROUECT MANAGER TO MAKE EGOR RUN IMMEDIATEI-Y PRIOR TO STARTING CONSTRUCTION 9 INSTALL REPLACEMENT WINS PER PSE GAS OPERAT NO STANDARDS 2525 2100 FOR INSERTIONS AND 2525 3501 FOR ABANDONMENT OR DEACTIVATION 10 P UG ENDS OF DEACTIVATED OR INSERTED "NS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERAIING STANDARDS 2S25 2100 AND 2525 3600 11 REMOVE OR RENDER I NOPERABLE DEACTIVAIED VALVES ON CASING WHERE MPE PIPE IS INSERTED 12 INSI E METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PIE OAS OPERATING STANDARDS 2575 23X AND 25SO 1700 13 REPLACE EXISTING ACTIVE SEWCES PER PEE GAS OPERAJING STANDARDS 2525 21DO AND 2575 14 REPLACE ALL 'NO RECOPtD`SERVCES AND 1-118- FE SERVICES INSTALLED PRIOR TO 15 AC1`IVE SERVICES TO BE REPLACED DENOTED BY: Q� SAP BATCH YEAR & FOOTAGE SUE OF RETIRED MAIN MATERIAL RETIRED ORIGIN L JOB ORI L YGINA EAR PRO�ED LENGTH OF RETIREME�T ACTUAL LEN TH OF ETIREMENT 2 STW 6620 1964 157' FITTER'S CHECKLIST (CHECK BOXTOCONFIRM COMPLETION) R 0 0 C] LeAft-It.... aw— Qa,II STANDARD GAS CONSTRUCTION NOTES: I FIELD LOCATE ALL UNDERGROUND UTILITIES EXCIVATORTOC—ONE-CALL TWOWORKING DAYS PRIOR TO TOWN �UCMON,IN�SMRN�SHING�C�L:l�424.�5 ORCALLNITI—DE 811 2 NOWyAPPR0iNIaATE PERMITTINGA097CY PRIOR TO JOB START (SEE PERNITREQUIREMENTS) AL CONSTRUCTION 11 -CONFIRM TO ISE GAS DIE-- ITANDIRDS AND 11 FIELD PROCEDURES ER ION AND SEDIMENT CONTROL SHALL BE PER PEE STANDARD PRAC CE 01503—TECIANIQUES FOR TEMPORARY EROGION AND SEDIMENT CON4TROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS I NCTIFYPROPE TY OWNERS ADJACENT TO PROPOSED CONSTRUCTION A-VITIES A MINIMUM OF TVVG WGRwN. DAYS PRIOR TO BEGINNING CONSIR—ON USE iSi TO USTRIBUTE FLYERS IF— IS LA GE,OTHERASEHIND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFO —ON ABOUT THE 0 PORTUNITY TO PURCHASE AN EXCESS FLOW VAI-VE WHEN THEIR SERVICE 15 INSTALLED OR R—ED P R GAS OPERATING STANDARD 25SO 1600 ALLOWADEQUATE TIME FOR CUSTWER DECISION AND RE —SE . ANYCHAAGEI ROUTE, PIPE SIZE(TYPE, TIE-IN METHOD OR ADDITIO-L MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE 7 COMPLETE 'PIPE CONDITION REFO— ON ALL METALLIC PSE FACILITIES CHECK BOX ON REPORT FOR WRE BOX ITEST LEAD) INSTALLATION . PIMUW AAAIbU= AND YeARMAID 510M $HALL ME $41MILLID ANO ftCORDt D by MR PSE GAS OPERATING STANDARD 2525 — I INSTA L WIN VALVES OUT OF TRAFFIC WHERE POSSIBLE VALVE MARKERS SH L BE INSTALLED AND RECORDED BY THE CON CTOR PER PSE GAS OPERATING STANDARD 2525 2600 FOR ALL HP VALVES IF THE — IS NOT READILY ACCESSIBLE. AND FOR ALL VALVES WHERE PERSISTENT SNKYWFAIL MY OBSCURE THE VALVE BOX 10 TO PREVENT ACCIDENIA1. OVERPRESSURE OF ADUOINING SYaTEMS. NO TWO MAINS SHALL BE CONNE.MD EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE I I SYSTEM MAOP DENOTED BY: 12 GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED 13 RESTORE ALL DRIVEWAYS SUNECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION 51 PURGE101 I —PRESSURE TAPI TO BE NITALLEDPER PSE III OPERA7`NG STANDARDS 211II'S1 I AND 2125 121 MANS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2— SIMI AND M25 — 16 IF METALUC PIPE IS INVOLVED. —0 DINATE INSTALLATON VATH CP TECH yx— AN`N0H . PHONE 425-766-1307 17 NOTE ALL A TUN- FOOTAGE, LOCATION AND MATERIAL CHANCES ON THE AS -BUILT IN RED DENOTES FOOTAGE BETWEEN FITTINGS. 18, EXCESS FL VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER (REODFIDALL INFORWTION ON D4 CARD) GAS MAIN V1.1.11y Map N/A I-- 1[3 TESTED BY PSE PRESSURE CONTROL. SEE FORM 19M I 0 00 00 S Ivice/M.I., S—I./Male, S.Ivica/md., Semice/Meter �M Salim IXI MSA /Developer Contact Info DiS Rag / FT NIA HP SYdMSA NIA Relocate N/A ATTN: NIA NIA . P.ject M .. Ear C,,I,,t Wom,flo,: Fee (XVM601% bs�" I -058,CALL PEE CMS"3) AIYM� JORDAN MCLEAN CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG CWP� 425653-31`03 E-M.it j,,d,n cl,,,@p,, THIS SKET11 NOI TO 11 —DO IPOI 11N EXACT LOCAT— OF EXIIIING FAULITI11 "Locate, R,quimd" YES 0 No 0 ESTATIEJEASEMENT IREAL Tl ... - Re..i.d" Y— n A. m 1 DATE I BY IDESCAMPTmMm FuNCnON PHONE NO I DATE I' PROJECT NOR ENGR-GAS JORNmey I DOAO 425-424-6426 1 4/16117 1 I SNOHOMISH 1 5 1 c5mom ICIP APPROVAL K ANION 421,76111D7 4121117 1114 SEC I P MAP 1p"', 1 NW 25-27-03 IM 062 I JOINT FACILITIES ARRANGEMENTS A. I NIA I NIA PHOMENI NIA I IIIA I NIA 49& ME CITY OF EDMONDS WATERLINE REPLACEME 1A r ' U P16 D 2" MPE IP MAIN RELOCATE ENERGY 1143 6TH AVE S, EDMONDS, WA 90020 CALE DESIGNED BY PEE I =. :2 TEE SVC 1/2"X5/8- PE OUTLET (GAUGE TEE) __'N CA & ---'w CA TIE-IN STOPPER 2"X150 B/O & ELBOW 2"X9O - WELD 36-N CA & 17-W CA N CA & ---'W CA X CUT & CAP, CAP 2" WELE 34'N CA & 17'W CA NHE ELM WAY —' N CA & ---'w CA LL EX. 2' S.'W 1p 24'.4 6F20 M4 Oe PROPOSED PIPE 2" MPE IP MAIN WE CA (_'E CA) DEACTIVATE IN PLACE EXISTING 2" STW IP MAIN CUT & CAP CAP 2" WELD 112'S CA & 22-W—E PA --'s CA & ___'W-E PA TIE—IN STOPPER 2"X150 B/O & ELBOW 2"X90* WELD 114-S CA & 21-W—E PA ___'s CA & ___'W—E PA TEE SVC 1/2"X5/8" PE OUTLET (GAUGE TEE) ___'S CA & ---'W-E PA PLOT PLAN SCALE: I" = 20'-0" 5' 5/8" SION 1994 TRANSIT10N FITTING 2" MPE 36'N CA & 16-W CA ___'N CA & —'w CA CP WIRE #10 TEST LEAD & CP TEST LEAD BOX COMPLETE _'N C/L Ac CA L -W 3 ?N 6'N CA & 9 E CA ELBOW 2"X90* MPE _N CA & __'E CA _710,-Zt�_IEE .1 7ZX2' 21-N C/L & WE CA I — , N CA & _-E CA INSTALL #4 CABLE MTH 2- MPE INSTALLATION, AT BOTH NORTH AND SOUTH TIE-IN LOCATIONS NTH 2- STW PIPE INSTALL TEST LEAD WRES BRING ALL WIRES UP IN TEST LEAD BOXES INCLUDING #4 CABLE BONDING CABLE NTH TEST LEAD WRES AT BOTH LOCATIONS. SOLAR IMPRESSED CURRENT SYSTEM #015958 WILL BE ISOLATED IF #4 CABLE IS NOT INSTALLED WTH MPE PIPE. - ----------- - — ------------- <�7, ti 5 x/17 s ELBOW 2"X90' MPE 21-N CA & 30'W C/L 'N CA & _'W CA INSTALL (2) 20# ANODE END TO END WITH TEST LEAD WIRES. BRING ALL WIRES UP IN TEST LEAD BOX BONDING ANODE WITH (1) #5 TAGGED WIRES N CA & ---'w CA EX. 2' TW I p '7--TW P 714k TEE SVC 1/2"X5/8- PE OUTLET (GAUGE TEE) __'N CA & ___'W CA TIE—IN —J STOPPER 2-Xl50 B/O & ELBOW 2"X90' WELD 14-N CA & 30'W CA _N CA & —'w CA TIE-IN DETAIL .I.: NONE CP NOTE: 04/21/17 PER KEVIN ANSON 425-766-1307. IN DETAIL #1 INSTALL 2-20# ANODES END TO END NTH TEST LEAD WIRES BRING ALL WIRES UP IN BOX BONDING ANODES WITH ONE #5 TAGGED WIRE . A NEW GALVANIC SYSTEM MIGHT BE CREATED TO PROTECT REMAINING 2" STW PIPE HEADING WEST ON ELM WAY. ON 6TH AVE S. INSTALL #4 CABLE WITH 2- MPE INSTALLATION, AT BOTH NORTH AND SOUTH TIE-IN LOCATIONS NTH 2" STW PIPE INSTALL TEST LEAD WIRES BRING ALL WIRES UP IN TEST LEAD BOXES INCLUDING #4 CABLE BONDING CABLE NTH TEST LEAD WIRES AT BOTH LOCATIONS. SOLAR IMPRESSED CURRENT SYSTEM #015958 WILL BE ISOLATED IF #4 CABLE IS NOT INSTALLED WITH MPE PIPE. w ISTH AVE S ASPHALT 60'ROW .. ml 30, ROADWAY CROSS SEMON A Scale: NONE KEY FOR PITS (SHO ENURMD FOR Cl_ARITY) �* ..T FOR MAN TIE—IN Pnijact Manage, Contact W-11— M.-W. JORDAN MCL AN CaN Ph. 425,563-3103 E-Mak lonf., claiina,nia 'Locate, Requinad' Y.. [] No D .Fl ... in. R ... iied" — rl .. rl PROPOSED PIPE 2" MPE IP MAIN 21-N CA (---'N CA) NSITION FITTING 2" MPE CA & 30-W CA .'N CA & ---'w CA WIRE #10 TEST LEAD & TEST LEAD BOX COMPLETE .'N CA & ___'W CA DEACTIVATE IN PLACE EXISTING 2" STW IP MAIN CUT& CAP CAP 2" WELD 14-N CA & 28'W CA — , IN CA & ---'w CA E MINIMUM CLEARANCE FROM OTHER UTILITIES: HORIZONTAL: 5' VERTICAL: V 4' EX UI4JM PCR PLAN V_ PAUM Ell (LOCAT" VNOM PER PLAN) OCATION. � 77= GAS (—;� VA.FOES fiMocnla0sWti­" 1-861KALL PSE 05-5773) CALL511 ATLEAST2 BUSINESS DAYS BEFORE YOU DIG rEAL ESTATEAEASSAIIENI! DATE BY jommpnom FUNCTION CONTACT mmmo DATE 1pmEcruG5 I J MCLEAN JEIM - GAS I PRA�n BY 1 0 GAG 425-42�6­ 6 0 CD N 00 + GILBERT M p cq F-- U-1 FURNISH & INSTALL: 1-8" RSGV, MJxMJ OPEN 4'e, - REMOVE EXIST PRV STATION, FURNISH & INSTALL NEW STA B6+45 PRV STATION, SEE SHT C-30 FURNISH & INST,�LL� FOR ADDITIONAL DETAILS _M MJX 1-8" D 1 45' BEN J REMOVE EXS I T FH PUGET SOUND ENERGY TO RELOCATE GAS LINE FURNISH & INSTALL: 1-8" DI 22.5* BEND, MJxMJ STA 85+53 FURNISH & IN!7 1-8%4" D I TEE Li - FIL GG 2-8" RSGV, FLGxMJ 1-4" RSGV, FLGxMJ1 Cz 1-4" D I LONG BODY SLV SEE CONNECTION DIET B. SHT C-32 1143 PILLAR 16, 71 O"p ORP 0"p- TA B5+()O-- 4M86 02LW _M V*D,17 la.T.. r 71 Ix It.' .7 --- SEE SHEET C-6 MATCHLINE STA B8+20 % n! 0 1 q - , A, I T Y 1- 12" EZ VALVE < STA 86 .59 FURNISH & INSTALL: fA 1-8" D 1 45* BEND, MJxMJ RESTORE CONIC S/W & CURB/GUTTER PER DET V E2.8 & E2.13, SHT C-29 gIN U.1 I I NN, STA 86+70 V) — I - . a d� hw- ILD, w w- - 8"D I CONNECT TO EX I ST WATER SYS FURNISH & INSTALL: �7 �, -AMMVIII6 4.Z - - G 4-1) 1-12"x8" DI TEE, FLGxFLG CRAVCI� RSGV, FLG.MJ F- DNA 2459-JO5 TOP CASE 201 (-1 8"S 2- 12' .11 i 1-8" RSGV, FLGxMJ MAG NAILI WASHER *V TOP NOT 211 M --- IOP CASE 10 - 12" D I LONG BODY SLV 4% -2 2 ARV. SEE SHT C-�7 TOP 101 60 588 1-8" D I LONG BODY SLV W I INTERS K . ENDALL 486 ZONE WMN -S25 ZONE WMN STEINKE: SEE CONNECTION DET C, SHT C-32 ..I 98j a 1"01 114 3: 1 I I ill , 1.4 FURNISH & INSTALL: ISTA B4+68 PLAN INSTALL JOINT RESTR ON " WATER SERV ICE & METER, SEE FURNISH & INSTALL: M�TCHL I NE STA D4+24 PROP 12" & 8"DI WMN DET E7.6, SHT C-27 (TYP) 1-12" EZ VALVE SEE SHEET C-5 SCALE: I "= 20' OUTSIDE OF PRV VAULT 1 220 215 210 + K) Go 04 < 205 Ld bi m V) 200 Ld W U.1 z On 0 195 F- 190 185 m cc U) 01 V)r- cc .+ �: + + -t Lh Ld + 3:+ U-1 + + CD --t Ln LO Ln Ln CO --- M F-- 03 E-cn m 1.- 00 J-- I-- ...c cn.�c (0 (A U) cn 0 0 cn cn F- x F- XF- X F- X)-- X x x CC w w L'i L11 LAJfA UJ V) UJ In UJI Lj x x + fu V) x X V) Uj_ W.— [EXIST GRADE 0 PIPE Q 4' -j- 6.1 N AI vo Ir n OPOSED Dp CI t4is iALL RIS B3+40 B3+60 B3+80 134+00 --cl OUSL E I vr' CONIT 11 14U ERMED 1 A\jo 10 114-T s 134+20 84+40 84+60 134+80 135+00 B5+20 135+70 B5+60 cn 0 LO ID w m m m cf) 0 z 0 LLI LL 0 ZI-- wz > - 01 + F- + -i < r- m V) > < Uj (A W C14 00 m (D F- 'I, W Li Li La 135+80 B6+00 36+20 B6+40 136+60 136+80 B7+00 B7+20 87+40 B7+60 B7+80 B8+00 B8+20 PROF I LE SCALE: 1 "=20' HOR I Z. 1 "=5' VERT NOTES 1. ALL MECHANICAL JOINT FITTIINGS SHALL BE RESTRAINED IN TH MEGALUGS. F ELD LOK AS SHOWN ON PLANS. 2. DEPTHS OF EXISTING UTILITIES ARE APPROXIMATE AND BASED ON THE BEST AVAILABLE DATA AT THE TIME OF DESIGN. CONTRACTORS SHALL POTHOLE EXISTING UTILITIES A MINIMUM OF 200 FEET AHEAD OF WATER MAIN CONSTRUCTION TO VERIFY DEPTHS AT CROSSINGS AND CONNECTIONS. 3. REMOVE ALL WATER VALVE BOXES AND EXTENSION ALONG THE ABANDONED MAIN AND BACK FILL WITH CDF TO SURFACE 4. COORDINATE WITH CITY TO ACCOMPLISH WATER MAIN CONNECTIONS TO EXISTING SYSTEM CITY STAFF SHALL OPERATE ALL WATER SYSTEM VALVES. CONTRACTOR NOT ALLOWED TO OPERATE VALVES. 5. ALL SERVICES ARE I" (DETAIL E7.6) UNLESS OTHERWISE NOTED. 6. MAINTAIN I FOOT VERTICAL SEPARATION BETWEEN WMN AND OTHER UTILITIES. INSTALL ETHAFOAM 220 PAD TO PREVENT UTILITIES FROM BEARING ON WMN WHERE SEPARATION IS LESS THAN I FOOT. 7. WHEN WMN PASSES UNDER EXISTING STORM OR SEWER, INSTALL WMN SO THAT THE PIPE ABOVE IS CENTERED BETWEEN WMN PIPE JOINTS. 8. ANY MAILBOXES THAT WILL BE DISTURBED DURING CONSTRUCTION ARE TO BE TEMPORARILY PLACED NEAR TO THE ADDRESSES SERVED, THEN PERMANENTLY REINSTALLED. PSE f-4 61 4�,c /1 c:f- 012..# -re 220 215 210 205 200 195 190 185 NOnCE 0 wiefffiF.= IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO SICKE HSK E - R- MMSmA&Assod*sjflc. Engimers/Plamus 2707 Colby Avenue, Suite 1110 P90NE 425.252-9003 MSA Everett, fashin& 98201-3566 FAX 425.252.0053 0? EpA, 0 CITY OF EDMONDS 2017 WATERLINE REPLACEMENT PROJECT SCHEDULE A PLAN & PROFILE STA 133+40 TO STA B8+20 SHEET C-3 6 of 37 DESIGNED 13AW DRAWN CEH —EHECKED A 104/10/171 q H E #I NO. I DATE !ADDENDUM By REVISION PROJECT NO.: 16- 1852.202 1 SCALE: AS SHOWN I DATE: APRIL 20171 ce CATCH BASIN THIS APPLICATION SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION PERIOD. SEDIMENT SHALL BE REMOVED ON A REGULAR BASIS TO MAINTAIN FILTRATION EFFECTIVENESS. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS FILTER FABRIC MATERIAL, NEWLY GRADED MIRAFI 10OX OR EQUAL OR DISTURBED SIDE SLOPE USE STAPLES 0 2`x 2"x 14 GA, WELDED R WIRE WIRE FENCING OR EQUAL. 20 GA RINGS TO ATTACH WIRE TIE r1K- FILTER FABRIC TO BACK M IN. WIRE FENCING. iA / - /8-3/4" MIN. .... WASHED S-6' GRAVEL a" Sir 2' L 1 :IUNDiSTURBEO GROUND L BURY FILTER FABRIC IN A 8" x 8" GRAVEL -FILLED I 48-0.c.(TYP) TRENCH 2'.4- DOUGLAS FIR NO. 1 GRADE OR EQUAL ELEVATION SECTiO SILT FENCE DETAIL NO SCALE TRENCH NOTES7 GENERAL R/W USE RESTORATION REQUIREMENTS (8-040) 1. AT THE ENGINEER'S DISCRETION, PRIOR TO COMMENCING ANY CONSTRUCTION, PHOTOGRAPHS DEPICTING PRE-EXISTING ROADWAY CONDITIONS WILL BE REQUIRED EVERY 50 FEET IN PAVED AREAS OR ANY OTHER LOCATION AS SPECIFIED BY THE ENGINEER. 2. SIGNING, FLAGGING AND TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THESE STANDARDS, THE WSDOT TRAFFIC MANUAL AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. 3. ONE LANE OF TRAFFIC SHALL REMAIN OPEN AT ALL TIMES, ATTENDED BY FLAGMEN AND APPROPRIATE CONSTRUCTION SIGNING PROVIDED. THE ROAD SHALL BE RESTORED TO TWO-WAY TRAFFIC AT THE END OF EACH WORKING DAY. APPLICATIONS FOR TOTAL ROAD CLOSURES MUST BE FILED WITH THE CITY OF EDMONDS FOR REVIEW AND APPROVAL. 4. EXISTING DRAINAGE DITCHES, CULVERTS, ETC., SHALL BE KEPT CLEAN AT ALL TIMES. TEMPORARY DIVERSION OF ANY DRAINAGE SYSTEM WILL NOT BE PERMITTED WITHOUT THE CONSENT OF THE CffY OF EDMONDS ENGINEER. ANY DRAINAGE CULVERT, CATCHWIN, MANHOLE OR OTHER DRAINAGE STRUCTURE DISTURBED BY EXCAVATION SHALL BE REPLACED WITH NEW MATERIAL OR REPAIRED TO THE SATISFACTION OF THE CITY OF EDMONDS ENGINEER. TEMPORARY EROSION/SEDIMENTATION CONTROL MEASURES SHALL BE EMPLOYED TO PROTECT ADJACENT PROPERTY AND STORM DRAINAGE FACILITIES. 5. GRAVEL SHOULDERS DISTURBED BY EXCAVATION SHALL BE SHAPED TO CITY STANDARDS AND PROVIDED WITH A MINIMUM OF 6 INCHES COMPACTED CRUSHED SURFACING TOP COURSE. 6. IF IN THE OPINION OF THE ENGINEER, WEATHER CONDITIONS DETERIORATE TO THE POINT WHERE THE TRAVELED ROADWAYS ARE UNSAFE FOR THE PUBLIC OR DETRIMENTAL TO THE RESTORATION OF THE ROADWAY, EXCAVATION SHALL CEASE IMMEDIATELY AND CLEANUP SHALL BE PROMPTLY ACCOMPLISHED. 7. ALL PIPE OR OTHER MATERIAL STORED ALONG COUNTY RIGHT-OF-WAY MUST BE PLACED AT A SAFE DISTANCE FROM THE TRAVELED ROADWAY IN SUCH A MANNER AS TO AVOID FALLING ONTO THE ROADWAY. 8. NO EXCESS OR UNSUITABLE MATERIAL SHALL BE WASTED ON CITY RIGHT-OF-WAY ANY SUCH MATERIAL DUMPED ON PRIVATE PROPERTY MAY REQUIRE A GRADING PERMIT. VERIFICATION WITH CITY OF EDMONDS PLANNING & DEVELOPMENT SERVICES IS REQUIRED- 9. STREET SURFACES SHALL BE CLEANED AT THE END OF EACH DAY'S OPERATION WITH A POWER BROOM OR OTHER APPROVED MEANS. 10. NO OPEN CUT CROSSING OF CITY ROADS OR STREETS SHALL BE MADE WITHOUT THE APPROVAL OF THE ENGINEER & CITY OF EDMONDS. 11. MAXIMUM AMOUNT OF OPEN TRENCH IN ROADS SHALL BE 400 LINEAL FEET. AT THE END OF EACH DAY, AL DITCHES MUST BE BACKFILLED OR COVERED WITH STEEL PLATES AND BARRICADED WITH FLASHING WARNING LIGHTS TO PREVENT PEOPLE OR ANIMALS FROM FALLING INTO THE TRENCH. 12. FINAL CLEANUP INCLUDING COMPLETE RESTORATION OF SHOULDERS, CLEANING OF DITCHES, CULVERTS AND CATCHBASINS, AND REMOVAL OF LOOSE MATERIAL FROM BACK SLOPES OF DITCHES SHALL NOT EXCEED 1500 LF. BEHIND EXCAVATING OPERATIONS OR AS REQUIRED BY THE ENGINEER. 1. LONGITUDINAL TRENCH - PER CITY STANDARD DETAIL E2.3. 2. EXISTING PAVEMENT. 3. NATIVE MATERIAL, BANK RUN GRAVEL, CSTC MAY BE REQUIRED BY THE ENGINEER, 4. NEAT LINE CUT, CLEAN, HEAT & TACK EDGES WITH SEALER CSS-1 & SEAL WITH HOT ASPHALT CEMENT. 5. TEMPORARY RESTORATION OF TRENCHES FOR OVERNIGHT USE SHALL BE ACCOMPLISHED BY USING COLD MIX, ATB, OR STEEL PLATES. 6. PATCH SHALL BE MACHINE ROLLED FLUSH WITH EXISTING PAVEMENT AND SHALL BE PLACED PER SECTION 5-04 OF THE WSDOT/APWA SPECIFICATIONS. 7. COVER DEPTH OVER UNDERGROUND UTILITIES SHALL CONFORM TO FEDERAL AND STATE REGULATIONS. 8. TRENCHES IN CONCRETE PAVEMENT SHALL BE RESTORED USING TIE BARS OR DOWEL BARS IN ACCORDANCE WITH SECTION 5-05 OF THE WSDOT/APWA SPECIFICATIONS. SEE TEXT SECTIONS B-02, 8-04, 8-05, GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: -CURRENT INTERNATIONAL BUILDING CODE (IBC) -2012 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION. -WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION). 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE. 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCT10N IS IN PROGRESS. 4 DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD ;ND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND STE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTIUTY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. MANHOLES, CATCH BASINS, LMLITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOGRAPHICAL REPORT. 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN UNES AND SHALL BE TlGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE BY: CITY ENGINEERING DIVISION 1 6. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENT INDICATED ON THESE DRAWINGS. 19, AS A MINIMUM REQUIREMENT. ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILTTIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERMCE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAJNING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES, CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 31. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 32. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 33. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL MEASURES BEFORE WORK CAN BEGIN. 0.^, M­"., C-l.. I.-- F,, wint-ts below dial 1.868-CALL PSE (22�5773) M .. W. JORDAN MCLEAN CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG C.IlPt,o- 425-56�703 E-M.H., J�,d­ -1-@'. -1-1 - .1-1de -1 1­1.. R.q.i.d' Yee [] No 0 IREAL ESTATFJEA,8,,EMENT rll[MFT� "Flagging Requived" Y­ 1771 No 1-1 REV# DATE BY IDESCIRIPTION IFYNCTM 1 CONWTACT PHONE NO DATE I OJECTIAGIR J MCAIEM 425� 7 I =NGR - GAS_ Ir I IORAWN BY D DAD 425-424-64- SNOHOMISH 5 T JCP APPROVAL 1 KANSON 1 42S.MI30? 4F2lrlY 11/4 SEC IOP MAP MAP I I NW 25­27� W052 iPLAT CSIP, COPM 6PP.1 I I NIA CONTACI OW& MET CITY OF EDMONDS WATERLINE REPLACEMENT E D 2" MPE IP MAIN RELOCATE ENERGY 11 43 6TH AVE 8, EDMONDS, WA 98D20 BY PSE NfA NfA SAP S,p Ord,, Nbr 1 09104188 1. -20