7. Fire Marshal Response.pdfI /) C. I S k) ",
121 51h Ave N Edmonds WA. 98020 124:
Serving the cities of Brier, Edmonds, and Mountlake Terrace
Department of Fire Prevention
To: SALUS ARCHITECTURE DOUGLAS MCNUTT
From: Karl Fitterer
Date: April 30, 2018
Re: BLD20180447 Edmonds Recovery Center
Salus Responses - June 25, 2018
'A 98208
1. Resub for G2.1 0 Add Occupant tag for each space Tags have been added on the revised floor plans
2. Resub for G2.20 Add Occupant tag for each space G2.1 0 and G2.20
Response: yes, ceiling and floor spaces (below the rated GWB
floor assembly) will be of non-combustible materials
Deferred Submittal: Owner will hire a qualified agency to determine if a DAS
1. DAS (Distributed Antenna System) system is require
2. Fire Sprinkler including walk ins and accessory structures Response: these items have been submitted
3. Fire Alarm with Emergency evac. Response: these items have been submitted
4. Kitchen hood Type I The Kitchen. kitchen equipment, and the hood have
been deleted from the project. All food will be catered
3. Show Fire lane Markings per Fire Prevention standards on plans. Fire lane markings have been approved
- see notes on following page
4. Reaffirm ceiling and floor spaces will be of non or limited combustible materials to eliminate
upright sprinklers in void space. Response: yes, ceiling and floor spaces (below the rated GWB
floor assembly) will be of non-combustible materials - see notes on
Karl Fitterer CH following page
Deputy Fire Marshal
City of Edmonds
Department of
Fire Prevention
kfitterer(g'bsouthsnofire.orq
425-775-7720
425-551-1980
Salus Response, dated 06/13/18-
Please see attached email confirmation of Karl Fitterer dated
05/23/18 and Douglas McNutt dated 05/22/18 below.
-Douglas McNutt
Douglas Mcnutt
From: Fitterer, Karl <kFitterer@southsnofire.org>
Sent: Wednesday, May 23, 2018 6:20 AM
To: Douglas Mcnutt; Zweber, Kevin; Brough, Paul; Bjorback, Leif
Cc: Teresa McClure (tmccl u re@ north poi ntrecovery.com); Adam Vance; Faramarz Manteghi; Sangni Qu
Subject: RE: BLD20180447 Edmonds Recovery Center - Department of fire prevention permit review
comments
Douglas,
Answers to questions,
1. Yes please tag all rest rooms over I occupant and add corridors and all other rooms.
2. You need to have a qualified agency or company test your site to determine if a DAS system is required, we do not
perform the testing.
I Disregard as these comments were submitted prior to the deferred submittals.
4. Fire lane markings are approved as submitted and will be subject to field inspection.
5. Correct, Building and fire will also be reaffirming, through inspection, that there are no combustibles or ignition sources
in these spaces. Subject to field inspection, no sprinklers will be required between the TH's.
I hanK
you,
- I
Karl Fitterer CH
Duputy Fire Marshal
kfitterer@southsnofire.org
City's of Brier, Edmonds
and Mountlake Terrace
Department of
Fire Prevention
425-771-0213
425-551-1980
The information in this email is confidential and may be legally privileged. It is intended solely for the addressee. Access or use by any other person to this internet
email is not authorized and may be unlawful. If you are not the intended recipient, please delete or destroy this email. If you do not wish to receive future emails
from this sender, please reply directly to this email requesting you be removed from any mailing list.
From: Douglas Mcnutt [douglas.mcnutt@salus.archi]
Sent: Tuesday, May 22, 2018 2:19 PM
To: Fitterer, Karl
Cc: Teresa McClure (tmccl u re@ north poi ntrecovery. com); Adam Vance; Faramarz Manteghi; Sangni Qu
Subject: BLD20180447 Edmonds Recovery Center - Department of fire prevention permit review comments
Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files
Karl,
We have reviewed your permit review comments and have several questions:
1. "Resub for G2.10 Add Occupant tag for each space".
Do you wont this tog in every room? Does this tog need to be added to toilet rooms and corridors?
P 1 11
Q Q
GROUPEDU
ASSEMBLY
243 SF
ISOLF
16 OCCUPANTS
0 ww-� � � � � � � � � � � �
2. Deferred Submittal item#1: Is the DAS System required?
3. Deferred Submittal item#2 Sprinkler System & 3# Fire Alarm system: The fire sprinkler submittal have already
been submitted to both the City of Edmonds and the DOH. Do we need to submit these systems to the
Deportment of Fire prevention as well?
4. Fire Lane Markings. Please see attached plan A1.00 which shows the location of the "fire lane — no parking"
signage on the pavement — is this correct?
5. Reaffirm ceiling and floor spaces will be of non or limited combustible materials to eliminate sprinklers in the
void space.
The attached 'fire rating draw" shows the secondfloor building section. There are no combustible materials in
the void space above the lay -in acoustic ceiling tile and the underside of the Type-X gypsum board (which is part
of the 1 -hour rated floorlceiling assembly). — Is this the area you are asking us to reaffirm?
The rotedfloor assembly has wood TJI's, but is enclosed by GWB on the bottom and cementitious topping above
and doesn't need sprinkler heads between the TJI's — correct?
Thank you for your help
Douglas McNutt Principal
1402 Third Avenue, Suite 200
Seattle WA 98101
Cell: 206 605-5597
Direct: 206 957-1906
Office: 206 652-0722
Fax: 206 652-0720
Email: douglas.mcnutt@salus.archi
Web: www.salus.archi
Oj' SALUS
;0 HEALTHCARE ARCHITEI