Loading...
75 Pl W - 15515_Hilliard SFR_BLD20080117_2.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Engineering Plan Review Comments Application #: BLD20080117 Date: May 27, 2008 Project Name/Address: Hilliard SFR / BLD20070117 Contact Person/Address, Fax or E-mail: Steve Barnes / sbarnes@cornerstonearch.com Reviewer: Edward Sibrel Division:Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at sibrel@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Review 1 – April 7, 2008; Review 2 – May 27, 2008 1.OK. See item #2. 2. Existing grading quantities exceed 500 cubic yards and trigger a SEPA determination. ~~Engineering is unable to determine method used to recalculate grading quantities. Calculations appear to only include foundation excavation and not include site work for landscaping, debris wall, driveway, etc 3.OK. 3.1. Please cross-reference exterior debris wall with its detail and design calculations. ~~Debris wall referenced to sheet A7; should be sheet S7. 4. Drainage plan is adequate per ECDC 18.30, however ECDC 19.10.030(F)(1) specifically requires drainage calculations to accompany drainage design. ~~Written reply dated April 21, 2008 read: “Drainage calculations are shown on civil sheet 2 of 3.” No calculations are shown on that sheet. The intention of ECDC 19.10.030(F)(1) is to have the drainage designed by a licensed engineer, and that the City of Edmonds standard handouts used in the Storm Drainage Study dated February 1, 2007, from which the drainage designs were extracted, are not an adequate substitution by themselves for an engineered system. In this case, this requires the submittal of calculations that show the design does indeed limit the peak rate of runoff to the predeveloped condition two-year, 24-hour design storm, while maintaining the predeveloped condition peak runoff rate for the 10-year, 24-hour and 100-year, 24-hour storms. 5.OK 5.1.OK 6.OK 7.OK 8.OK DATE E-MAILED 5/27/08 PAGE(s) 1 of 2 City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Engineering Plan Review Comments 9.OK 10. OK DATE E-MAILED 5/27/08 PAGE(s) 2 of 2