Loading...
75_Pl_W-15810-sidewalk_waiver.pdfCITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building ® Engineering March 8, 2005, Gil and Janet Thiry 15810 75"' Place West Edmonds, WA 98026 GARY HAAKENSON MAYOR 7,,,,.,,°,, RE: Request to Waive Sidewalk Requirements — Short flat S-04-108 at 15810 75"' Place West Dear Mr. and Ms. Thiry: I have reviewed your letter dated February 11, 2005, requesting reconsideration of the sidewalk requirement under the subject short plat. Based on your meeting with staff February 9, 2005 and on further discussion with Lyle Chrisman and Steve Bullock, it is my understanding the existing house encroaches onto your other lot, and in order to be able to construct a house on the empty lot, the Planning Division required you to submit for a short plat so modifications could be made to the existing property lines. When the City designed and constructed the walkway along 75"' Place West (from 157"' Street SW to North Meadowdale Road), that portion of the walkway along your property frontage was not constructed because the steep roadway and side slope would have required a specially constructed walkway. The cost to construct such a walkway was well beyond the budget for the project, and since there were other areas between your property and Meadowdale Beach Road that required specially designed and constructed walkways, the decision was made not to include the walkway along your frontage. Since your application is really for a modified lot line adjustment, and the City did not construct a walkway along your frontage due to the expense of constructing an elevated walkway, the requirement to construct a walkway along your property frontage is hereby waived as being economically infeasible to construct, per Chapter 18.90.030B of the Edmonds Community Development Code. Attached is a copy of the revised Engineering Requirements for the subject short plat. If you have any questions, please contact Lyle Chrisman at 425-771-0220 Ext. 1324. Sincerel AVKK, BERT, P.E. City Engineer DKG/ALC/cmc Enclosure c: Duane Bowman, Development Services Director Steve Bullock, Senior Planner M:Advrw\sp\04-108 thiry ltndoc 0 Innnrnnrated Auau.gt 11. 1890 CITY OF EDMONDS ENGINEERING REQUIREMENTS FOR PLATS AND SUBDIVISIONS Name: Thiry File No.: S-04-108 Approved by: Vicinity:15810 75th PL W Engineering Program Manager date ReW& lkeqd w/bldg. Bond poste Complete prior to Permit recording 1 Rights -of -way for public streets: X 2. Easements (City utilities, private access, other utilities): Provide all easements as needed. X Lot 2 shall share the private access driveway with lot 1 X 3 Street improvements (ACP with curb and gutter): None required x 4. Street turnaround: Provide on -site turn around to City Stds. X 5 Sidewalks and/or walkways:. None required x 6 Street lights: N/A 7 Planting strip: N/A 8 Water system improvements (pipelines, lire hydrants, pump stations, telemeterin , D.S.H.S., etc.): Provide service to each lot. X Connect to public water system. X 9 Sanitary sewer system improvements (pipelines,; pump Stations, telemeterin , health district, etc:OVWSD Provide new service to each lot X Connect to public sewer system X 10. Storm sewer system improvements (pipelines, pump Stations, DOE, fisheries, etc.): Provide storm sewer service to all proposed lots. X Construct storm detention system sized to provide adequate X capacity for proposed single family dwellings and access improvements in accordance with ECDC 18.30. Connect to Public Storms stem X 11. On -site drainage (plan per Ord. 3013): Connect all new impervious surfaces to detentions stem. X 12. Underground wiring (per, Ord.1387): Required for all new services X 13. Excavation and grading (per UBC, Chapter 70 : Submit a grading plan as part of engineered site plan. X 14. Si na a(per City Engineer): All signs shall be vinyl letters and to City Stds. No silk screen N/A signs will be permitted Provide "Private Access Ends" N/A Provide fire and aid address si na e X VAdvnv\sp\04-108 thiryplt.doc N/A for all utilitv construction. X a) Plat showing lots, easements, legals, survey information X X b) Legal documents for each lot X c) Field stake lot corners (by professional engineer) X d) Clustered mailbox location per Postmaster e Maintenance agreements 18. Engineering fees: a) Storm drainage connection charge per lot ($428) X b) Sewer connection charge/LID fees to be paid in full. X c) Plat inspection fee: 2.2% of improvement costs $ X d) Plan review fee: $860 $ 860. X e Traffic mitigation: $200 per pm peak trip $_ I X ENGINEERING PROGRAM MANAGER, CITY OF EDMONDS DATE The Engineering requirements have been completed and the subdivision can be recorded. Authorized for recording by: Date: V:\dvnv\sp\04-108 thiry plt.doc