Loading...
890361.pdfCITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION O 1RtLER NAME/NAME QF BUS bJESS CITY below or attach two NEW SO i TELEPHONE NUMBER - include all easements RESIDENTIAL ADDIALTER COMMERCIAL REPAIR APT. BLDG. EXCAVATE DEMOLISH OR FILL CARPORT REMODEL GARAGE QWOOD STOVE RETAINING WALL/ INSERT ROCKERY NUMBER OF STORIES NATURE OF WORK TC Z ect S�W NUMBER C DWELLING UNITS M PLUMBING MECHANICAL ZONE JOB ADDRESS PERMIT NUMBER DIVI bl APROPOSED.-- PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. EXISTING__.__ REQUIRED DEDICATION L. J SIGN FENCE X _FT) n SWIM RENEWAL This Permit covers work to be done on private property ONLY. Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit Limit: 1 Year • Provided Work is Started Within 180 Days "Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirement of any city ordinance nor limit in any way the City's ability to enforce any ordinance provision." I hereby acknowledge that I have read this application; that the information given is correct; and that I am the owner, or the duly authorized agent of the owner. I agree to comply with city and state laws regulating construction; and in doing the work authoriz- ed thereby, no person will be employed in violation of the Labor Code of the State of Washington relating to Workmen's Compensa- ti Insurance. 51 N TURE O�i OR A�iEf�1T4of ���,� D SII / � /P9 RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED STREET USE PERMIT REQUIRED SEE ENGINEERING MEMO DATED ALLOWED / PROPOSED OR CU — FEET SIDE BY ITYPE OF SPECIAL INSPECTOR REQUIRED Cl YES L: NO C v UD NO, TESCP APPROVED BY ENV. REVIEW I ADS NO. COMPLETE EXEMPT REAR REVIEW BY I DATE HEIGHT ILOT COVERAGE GROUP PROGRESS INSPECTIONS PER UBC 305 PLAN CHECK FEE BUILDING PLUMBING C20 MECHANICAL GRADINGIFILL STATE SURCHARGE ENERGY CODE PLAN CHECK DEPOSIT TOTAL AMOUNT DUE ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3, 102.87 ATTENTION THIS PERMIT AUTHORIZES ONLY THE WORK NOTED INSPECTION DEPARTMENT CITY OF EDMONDS 771-3202 OCCUPANT LOAD 1-7Vv APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. CIFNCIAL'S SIGNAT RE DATE 53I�i 1 RELEASED BY: DATE ORIGINAL — File YELLOW — Inspector PINK — Owner GOLD — Assessor Ix W i 3 -..—,„�..� . T.a.....,v—.n. .. . �l,n ''•' eve , - A:.i d'r -�._ _ __, r �-"'.'+nY`'7S.'<.•s.�Hf.7;..Y�at.-•rfayaJ t"':`yi:. � t r � � �%T�- d•Fi[ !'�'LT'' ;"^� � a'i ��.fe` r is � �' r r •ter -` r\ 9 RECORD OF INSPECTIONS Date Passed FOUNDATION House --- Porches, piers Retaining walls Garage, carport PLUMBING Underground Rough•in /O Water servic HEATING SYSTEM FRAMING WALLBOARD FINAL