Loading...
9.6.19 Stop Work Notice.DOCCORRECTION NOTICE Date: September 6, 2019 To: Act Construction Group, Michael Puzal Amit Sharma, homeowner From: Jennifer Lambert Engineering Inspector Subject: Site work at 15712 72nd St SW STOP WORK NOTIFICATION Violations: 1 – Construction work is not consistent with approved plans under building permit BLD20181101. Vertical cut stabilization measures shall be installed by 5pm today, September 6, 2019. Stabilization measures shall be inspected and approved by the geotechnical engineer. A report shall be provided to the Engineering Division by September 9th at 5pm to avoid accruing civil fines. Geotechnical Engineer shall continue to provide inspection reports pursuant to ECDC 19.10.080 section C. All work on site other than site stabilization, including repairs to the structure shall be stopped at the receipt of this notice, until approval has been obtained from the building official. Enforcement procedures and fines as outlined in ECDC 23.40.240 and ECDC 18.030.100 may be assessed if work is not stopped. Please contact the Building Inspector, Eric Carter, or JoAnne Zulauf, Engineering Division with any questions. City of Edmonds Community Services Department Engineering Division