9-20-18 RESUB.pdf
107055903
.....
1/3
DATE
7/19/189/20/18
PAGE
N
N/AN/AN/A
office
EDMONDS.
107055903
1"=20'
Drawing Number
SAP Sup Order Nbr
PHONE NO
206-517-3466425-424-6426425-424-6549206-517-3466
PERMITSCALE
206-245-4863
.
D.DAO
CONTACT
J.COOPERJ.COOPER
G.VUKOSAV
N/AN/AN/A
N/A
WORK
SITE
STEVE KISSINGER
N/ASTEVE KISSINGER9007 OLYMPIC VIEW DREDMONDS, WA 98026ATTN:
Vicinity Map Owner / Developer Contact Info
APPROVED BY
REAL ESTATE/EASEMENT FUNCTION PROJECT MGRENGR - GASDRAWN BYCHECKED BYCP APPROVALPC APPROVALMAPPING
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
N/AN/AN/A
WATERWATER
TESTED BYTESTED BY
Manufacturer
45
160.068
107055903106338349
Order #
CSPBTGPM
FF
JOINT FACILITIES ARRANGEMENTS
STEVE KISSINGER 2" MPE IP MAIN EXTENSION
Act Lgth
---------
GAS WK CTR
PPPLAT MAP
NITROGENNITROGEN
IP 025-45
9007 OLYMPIC VIEW DR, EDMONDS, WA 98026
225'
Est Length
AIRAIR
N/AN/AN/A
DESCRIPTION
4
160.068
SYS MAOP
START TIMESTOP TIMETEST RESULTSSTART TIMESTOP TIMETEST RESULTS
MPE
Type
BY
500308779505790954
Notification #
Emer SectOP MAP
Yes NoYes No
---------
SOAPSOAP
60
GAS MAIN PRESSURE & TESTING
STANDARD GAS CONSTRUCTION NOTES:
2"
/ / / / / / / /
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.EXCESS FLOW VALVE
TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALLINFORMATION ON D-4 CARD)
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 EROSION
AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARYEROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.NOTIFY PROPERTY
OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSPRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HANDDELIVER
FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACEDPER
GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED
BYTHE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIREBOX (TEST LEAD) INSTALLATION.PIPELINE
MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GASOPERATING STANDARD 2525.2500.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS
SHALL BE INSTALLED AND RECORDED BYTHE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISNOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT
SNOWFALL MAY OBSCURE THE VALVE BOX.SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.RESTORE
ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.MAINS AND SERVICES
SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTESFOOTAGE
BETWEEN FITTINGS.
TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT ASSYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
GAS MAIN INSTALLATION/RETIREMENT
PSE
DATE
Pipe Size
PHONE#
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
UTILITIES
CONTACT
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. ___________________________, PHONE______________.
1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.17.18.
JORDAN COOPER425-623-5302jordan.cooper@pse.com
Verify Testing Requirements, Chart vs Gauge
Service/Meter
SAP SuperiorService/MeterService/MeterService/MeterInd. ServiceInd. MSADis. Reg. / FTHP Svc/MSARelocateRetirement
21
3
NW 18-27-04
SNOHOMISH
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
REV#
INSTALL
Type/Work
DESIGNED BY
TYPE TESTDATE ONDATE OFFTYPE TESTDATE ONDATE OFFPRESSUREDESIGN PRESS2023 02/18
GASProject Manager Contact Information:COUNTY
PRESSURE PROJECT PHASE 1/4 SEC
Manager:E-Mail:
Cell Phone:"Locates Required""Flagging Required"
DATE
LENGTH
NAME
FOREMAN'S
GASSED UP PIPELINE
DEPTH
PIPE
SEGMENT
LOCATION
HOLE HOG TABLE
ENDENDENDENDENDENDENDENDENDEND
STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART
BP1BP2BP3BP4BP5BP6BP7BP8BP9
BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20
CALLOUT
(CHECK BOX TO CONFIRM COMPLETION)
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed
post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.
Company: __________________________ Date ______________
FITTER'S CHECKLIST Foreman's Signature________________________________________Foreman's Name (printed) ___________________________________
4680 06/11
.....
2/3
DATE
7/19/189/20/18
PAGE
N/AN/AN/A
EDMONDS.
107055903
Scale: NONE 1"=20'
Drawing Number
SAP Sup Order Nbr
PHONE NO
206-517-3466425-424-6426425-424-6549206-517-3466
PERMITSCALE
.
D.DAO
CONTACT
J.COOPERJ.COOPER
G.VUKOSAV
N/AN/AN/A
Scale: NONE
(CHECK BOX TO CONFIRM COMPLETION)
N/A
1' MIN.
CLEARANCE
APPROVED BY
REAL ESTATE/EASEMENT FUNCTION PROJECT MGRENGR - GASDRAWN BYCHECKED BYCP APPROVALPC APPROVALMAPPING
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed
post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.
N/AN/AN/A
TYP. UTIL. CROSSING SECTION
FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Company: __________________________ Date ______________
Foreman's Signature________________________________________
4680 06/11
160.068
-CSPBTGPM
JOINT FACILITIES ARRANGEMENTS
ROADWAY CROSS SECTION STEVE KISSINGER 2" MPE IP MAIN EXTENSION
GAS WK CTRPLAT MAP
9007 OLYMPIC VIEW DR, EDMONDS, WA 98026
A
N/AN/AN/A
DESCRIPTION
4
160.068
BY
Emer SectOP MAP
Yes NoYes No
VERTICAL: 1'
MINIMUM CLEARANCEFROM OTHER UTILITIES:HORIZONTAL: 5'PSE
DATE
PHONE#
UTILITIES
CONTACT
JORDAN COOPER425-623-5302jordan.cooper@pse.com
1
32
NW 18-27-04
SNOHOMISH
REV#
DESIGNED BY
Project Manager Contact Information:COUNTY
1/4 SEC
Manager:E-Mail:
Cell Phone:"Locates Required""Flagging Required"
KEY FOR PITS
PLOT PLAN SCALE: 1" = 20'-0"
R
D
W
E
I
V
C
I
P
M
-
A
Y
L
O
D
R
R
A
M
L
E
D
A
T
S
I
V
.....
3/3
DATE
7/19/189/20/18
PAGE
N/AN/AN/A
EDMONDS.
107055903
1"=20'
Drawing Number
SAP Sup Order Nbr
PHONE NO
206-517-3466425-424-6426425-424-6549206-517-3466
PERMITSCALE
.
D.DAO
CONTACT
J.COOPERJ.COOPER
G.VUKOSAV
N/AN/AN/A
N/A
APPROVED BY
REAL ESTATE/EASEMENT FUNCTION PROJECT MGRENGR - GASDRAWN BYCHECKED BYCP APPROVALPC APPROVALMAPPING
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
N/AN/AN/A
160.068
CSPBTGPM
JOINT FACILITIES ARRANGEMENTS
STEVE KISSINGER 2" MPE IP MAIN EXTENSION
GAS WK CTRPLAT MAP
9007 OLYMPIC VIEW DR, EDMONDS, WA 98026
N/AN/AN/A
DESCRIPTION
4
160.068
BY
Emer SectOP MAP
Yes NoYes No
PSE
DATE
PHONE#
UTILITIES
CONTACT
JORDAN COOPER425-623-5302jordan.cooper@pse.com
1
32
NW 18-27-04
SNOHOMISH
REV#
DESIGNED BY
Project Manager Contact Information:COUNTY
1/4 SEC
Manager:E-Mail:
Cell Phone:"Locates Required""Flagging Required"
Associate Project Manager | Customer and System Projects
Cell: 425-623-5302
Jordan.Cooper@ pse.com
Jen Machuga, Permit Coordinator
City of Edmonds, Engineering Division
121 - 5th Avenue North
Edmonds, WA 98020
(425) 771-0220 ext. 1224
Jen.Machuga@edmondswa.gov
Permit Center Hours:
Monday & Tuesday 8:00 AM – 4:30 PM
Wednesday 8:30 AM – Noon
Thursday & Friday 8:00 AM – 4:30 PM