Loading...
950220.pdfr CITY OF EDMONDS r� CONSTRUCTION PERMIT APPLICATIONJ170NI OWNER NAME NAME OF BUSINESS DRESS U 1A 5c)5 s CITY ^p pp ZII L=Af nn'J ti d s 4,�G� STATE LICENSE NUMBER Legal Description of Property - Pro, Ta. TELEPHON 7 RIGHT OF WAY PER OFFICIAL STREET MAP G REQUIRED DEDICATION TESCP Apprgvetl ❑ R W Permll Requuatl ❑ Street U9e Parmll Raq'tl ❑Inspeclion Requuatl ❑—Sidewalk Required ❑ER Z 0 512E LINE SIZE NO. OF FI%TURES PflV REQUIRED(�'YES ❑ NO ❑CS J,B ELEPHONE EXPIRATION DATE all easements LJ NEW 1:1RESIDENTIAL O PLUMBING ADDITION El COMMERCIAL 1j-1j MECHANICAL REMODEL ART. 13LDG. LJ SIGN REPAIR ❑ GRADING cYDS ❑ PENCE ._Fr) DEMOLISH ❑ INSERT STOVE ❑ HO TU8OL SPA F-] GARAGE CARPORT II ROCKERYG WALL/ ❑ RENEWAL NUMBER NUMBER OF CRITICAL OF DWELLING AREAS STORIES UNITS NUMBER DESCRIBk WORK TO BE DONFn IATTACH PLOT PLAN) 10 ENGINEERING MEMO DATED REVIEWED BY - FIRE MEMO DATED REVIEWED BY I SIGN AREA SEPA REVIEW A08 O. ALLOWED ,I PROPOSED COMPLETE EXEMPT N*REA1— / SHOR NEM ,/ VARIANCE R CUW BY ATE SETBACK —F ETIGHT LO CO ERAE��FRONT SIDS REMARK5 l CHECKED BY TYPE OF CONSTRUCTION CODE OCCUPANT G GR UP SPECIAL INSPECTOR AREA / OCCUPANT (, REQUIRED LOAD f OYES REMARKS PROGRESS INSPECTIONS PER UBC 305 o f r L 7rL5 °W FINAL INSPECTION REQUIRED r VALUATION FEE I' PLAN CHECK FEE k BUILDINGden OQ z HEAT SOURCE'. GLAZING 011 / 7,1 % PLUMBING Plan Check No. C �_� �/ MECHANICAL l E This Permit covers work to be done on private properly ONLY. GRADINGIFILL' 1 Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permission. STATE SURCHARGE .r3� H' Permit Application: 180 Days Permit Limit: 1 Year- Provided Work Is Started Within 180 Days STORM DRAINAGE FEE "Applicant, on behalf of his or her spouse, heirs, assigns and ENO. INSPECTION FEE u, w successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of a whatever nature, arising directly or Indirectly from the Issuance of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT modify, waive or reduce any requirement of any city ordinance o nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE J !, provision." Z I hereby acknowledge that I have read this application; that the information given is correct; and that I am the owner, or the duly ATTENTION APPLICATION APPROVAL aulhorized agent of the owner. I agree to comply with city and THIS PERMIT state laws regulating construction; and In doing the work authoriz• AUTHORIZES This application is not a permit until ed thereby, no person will be employed in violation of the Labor ONLY THE signed by the Building Official or his/her Code of the State of Washington relating to Workmen's Compensa. WORK NOTED Deputy; and fees are paid, and receipt is tion Insurance and RCW 18.27. INSPECTION acknowledged in space provided. SIGNATURE (OWNER OR AGENT( DATE SIGNED DEPARTMENT CITY OF OFFICIAL'S SIGNATURE DATE EDMONDS CALL FO REL DY DATE ATTENTION INSPECTION �i IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE 771-0220 %�J UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR 7 ORIGINAL — File YELLOW —Inspector s--'- A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 0 CHAPTER 3. PINK — Owner GOLD — Assessor F 102 67 b U;, 11,1-11-61YIF2Z- A111:5AI Z12 R-IY15 CC) 7- M': p < ti CD M LD U-3 .60 GN I Ul P -:73 ' LIN Lf% y�� RECORD OF INSPECTIONS INSPECTOR DATE APPROVE SETBACKS ................... FOUNDATION: • Footing .................... Wall ....................... Pier/Porch ................ Retaining Wall............ Slabinsulatlon............ PLUMBING: Underground ............. Rough -In .............. .................... ��-•�� Commercial Final ........ HEATING: Gas Test ................. Gas Piping ................ Equipment ................ Commercial Final......... EXTERIOR SHEATHING NAILING .................... FRAMING ................... INSULATION:—� Floorinsulation........... Wall Insulation ........ Ceiling Insulation......... �---. ' SHEETROCKNAILING �' • SPECIAL INSPECTION ...... RADON MONITOR AT SITE. FINAL APPROVAL 2 Z FOR OCCUPANCY..........