950569.pdfCITY OF EDMONDS ZONE
CONSTRUCTION PERMIT APPLICATION aoe
OWNER NAME NAME OF BUSINESS EAODR
CITY ZIP TELEPHONE
ADDRESS
CITY
STATE LICENSE NUMBER
Legal Description o
PERMIT
NUMBER J
¢ 7 �,G d'1�"sr
UBDIVISION NO LID NO
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP Approved p ]FEI
RW Permll Requ,red ❑
EXISTING REQUIRED DEDICATION
SlrOW Use PefmlI Req'd ❑
PROPOSED Infpeclion Requued ❑
Sld-.11, Requbed ❑
E SIZE NO. OF FIXTURES PRV REQUIRED
YES ❑ NO ❑ ?
JMDER
D'.. REVIEWED BY
FIRE MEMO DATE. I /
REVIEWED BY
EXPIRATION
SIGN AREA SEPA REVIEW ADS NO. i.
-IOCIUde all easements ALLOWED PROPOSED COMPLETE EXEMPT
cou
P6TaxrcelNo. l —rT� Al1. Db 0Z I 0509
=. v
NEW RESIDENTIAL PLUMBING
ADDITION COMMERCIAL MECHANICAL
OREMODEL APT. BLDG. L J SIGN
REPAIR O GRADING ❑ FENCE I X--�
CVOS.
VEMOLISH ❑ W. DSTOVE SWIMPOOL
INSERT HOT TUB/SPA
GARAGE RETAINING
CARPORT ROCKERY WALL/ El RENEWAL
11 NUMBER O'Ve I NUMBER OF CRITICAL
I OF DWELLING D,1 ,� AREAS
STORIES UNITS NUMBEfl
' DE/�SC IBE WORK TO BED 1A TTAGrjel9� PLAN)
�lit'10V2 �i1Pra�,�,
SHORELINE#
EXP
VARIANCE OR CU PLANNING REVIEW BY DATE
SETBACKS —FEET t7
HEIGHT LOT COVERAGE z_
FRONT SIOE REAR z
REMARKS a t� 1
k
l
CHECKED BY TYPE OFCO TRUCTION CODE,.. _ OCCUPANT f
GROUB,
SPECIAL INSPECTOR.AREA 6-6
O^.CUPANT j REQUIRED LOAD Il
❑ YES
R MARKS
PROGRESS INSPECTIONS PER UBC 305
d d d G /e/Z� 9
FINAL INSPECTION 4111
REQUIRED :
VALUATION FEE
PLAN CHECK FEE d
BUILDING
PLUMBING
HEAT SOURCE:
/ 4
GLAZING
d/0
Plan Check NO,
MECHANICAL
GRADINGIFILL
STATE SURCHARGE
This Permit covers work to be done on private property ONLY.
Any construction on the public domain (curbs, sidewalks,
driveways, marquees, etc.) will require separate permission.
Permit Application: 180 Days
Permit Limit: 1 YeBr - Provided Work Is Started Within 180 Days
STORM DRAINAGE FEE :.
ENG. INSPECTION FEE
-
b
PLAN CHECK DEPOSIT (?
.1
w
i
i
"Applicant, on behalf of his or her spouse, heirs, assigns and
successors in Interest, agrees to indemnity, defend and hold
harmless the City of Edmonds, Washington, Its officials,
employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the Issuance
of this permit. Issuance of this permit shell be deemed to
I
modify, waive or reduce any requirement of any city Ordinance
nor limit In any we th CI ' i I
provision."
y ISty s ab I ty to enlorce any ordinance TOTAL AMOUNT DUE O�
I hereby acknowledge that I have read this application; that the
information given is correct; and that I am the owner, or the duly ATTENTION APPLICATION APPROVAL
authorized agent of the owner. I agree to comply with city and THIS PERMIT
state laws rag Ulaling construction; and In doing the work authoriz• AUTHORIZES This application is not a permit until
ed thereby, no person will be employed In violation of the Labor ONLY THE signed by the Building Official or his/her
Code of the State of Washington relating to Workmen's Compensa• WORK NOTED Deputy; and fees are paid, and receipt is
lion Insurance and RCW 18.27. INSPECTION acknowledged In space provided.
SIGNATURE (OWNER OR AGENT) DATE SIGNED DEPARTMENT
r CITY
F OF I A 's TURE ATE 1'
rl v 9s
ATTENTION CALL FOR IVELEASEDB DATE
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING DR STRUCTURE INSPECTION
��� _O O ORIGINAL UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR INAL — Flle YELLOW — Inspector
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED, UBC �p
CHAPTER 0, /fir Iv�//�
tm eT
j�' [ INK —Owner GOLD —Assessor Y
. _ia
TO: Permit Coordinator, Building Division
FROM: FIRE DEPARTMENT
ENGINEERING DIVISION
iiPLANNING DIVISION
OWNER C)IJL nS ') ADDRESS_ / % o(/ Az--
PERMIT#� ADB# INSPECTED ON
—
A field inspection was conducted to determine compliance with approved plans.
Final approval denotes there are no objections to the granting of:
Occupancy for the building Performance Bonds may be released
Maintenance Bonds may be released Landscaping is approved
Other inspected
PASSED FIRST INSPECTION - CONDITIONS NOTED
1.
2.
FAILED INSPECTION - OUTSTANDING REQUIREMENTS - ECALL FOR INSPECTION
3.
4.
OCCUPANCY APPROVAL
FAILED FIRST INSPECTION
RE -INSPECTED - APPROVED
RE -INSPECTED - FAILED
RE -INSPECTED APPROVED
OCCAPRVL/TXTRECEP/October 13, 1993
DATE
BY '
DATE
BY
DATE
BY
DATE
BY
DATE
FEES RECEIPT#
j.T%44,-'c, I qq5
(s4-J)
c ca� 5 S
I (Cv- V,
6A �A
\'V\ j, L -T.
L 6 t4
3 86 2 L
Od A
LuvJr-\c + vl�4-
c
June 15,1995
Ursula Schluter
21701 80th Avenue West, tl4
Edmonds, WA 98026
RE: Proposed demolition of dilapidated house at 15604 75th Place West
Dear Ms. Schluter:
We understand that you are working on behalf of Torkjel Carlson. On June 14, 1995 a site
conducted at 15604 75th Place West to render a Critical Areas Determination. There is son
because the building permit application description of work states that a shed will be demo]
site inspection revealed an abandoned house.
Assuming it is the house that will be demolished, it appears to be located within the buffer t
Hazard Area as defined in the Critical Areas Ordinance. Since the house is located right on
steep slope, there is concern that the methodology and equipment used to demolish the hou:
soil disturbance and possible erosion of the slope, thereby impacting the critical area.
Before it is possible to determine if a conditional waiver of the required Critical Areas stud,
granted, more information is needed. Please submit a site plan showing the location and sq
the house, and explain in writing how you will be demolishing the house, what machinery
using, what time frame the work will be completed in, under the supervision of whom (i.e.
and what protective measures you will be taking not to disturb the soil or slope.
Also, granting of permission to demo the structure and obtain access for demolition and cot
your new residence, must be done in writing by Torkjel Carlson or his attorney -in -fact. Ple
v, signed statement from Mr. Carlson or his attorney -in -fact with appropriate documentation,
permission.
Should you have any questions, please feel free to contact us at 771-0220.
Sincerely,
Ann Bullis Jeannine Le L. Graf
Code Enforcement Officer Building Official
cc: Torkjel Carlson, 17630 18th Avenue West, Lynnwood, WA 98037
Linda T. Carlson, 15604 75th Place West, Edmonds, WA 98026
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
- � '� i1 4 r r T.... -^-•.ry--' --r^-� ^----.L 11 y 1� � 211 v "y'�'�, �,f��rY� � � � •
+,,l anl. w..�,.,, u '-1.i».�..._1.... *,J-c.._ � .. _. , _ . LL.,�.-a .....w_ i v.e.. ..—.___ ... rn L, w. r.. .,..+'� _✓.:�_ � ..� -' f ��u�i��i� Y�
' Frt�1:- VISURL DESIGN URSULR SCIiUTER PFIONE No. 206 672 0851 Jun.29 1995 11.2%RN P01 ,i� �' t
y.
r.
6-27-1995
� o
City of ldmond11
Alluding Divicionx,
Mrs. Sharon Nolan s v
• r
Pleaac+ withdrww applicati.on for permit to demo old shed A
on propexty, ].5664 75th pl. W, Comonda
Thank you,
Linda T. Carlson �
c
0
{
ia5 i,
.a
i
µ
w .x
A
a
,i e
1 & 3 o /8 11+ v w
rvwoufl g84117 zv1=s
lsla't4'1/1bIIat�AlAWYi:' A'L-1+I1=05,
.........D� •j jh� 62- S
O
NEW
® RESIO
El PW IN
❑ADDITION
� YE
�nEMOOFI
61GH \\\\VVVVV���/RRR
PEP,IR
Ga,pwG
GYDa.
❑ PENCE
(_R�
�OE40L4NITSTOVE
❑ 6WIM PDOL
NOT TUfi9PA.
WALV
CARPORT
CKE
RORY
pENEWAL
ITYFE OF USE. USINESS OR ACTIVITY) Ex-
.... ER
Of
NUYBEq OF
OWELLINO
GBITICA�j
AMA�iiLNS
STORIES
'/
UNlia NR•
NU49ER
DESCFIpBEDONEIATTAPLAN) / a
LEGAL ES RIPTION CHECK
SU8011151ON NO
LIO NO
PUBLIC RIGHT OF WAY PER OFFICIAL aTREV YAP
lE4TIN0 REDVIA[D OEOIC,nON
FROPOSED
TESCP AF IZ,N, O
aw P««NANN.. D
aNF«uF. P«I,uIRp•e D
InYRFIWIapwrYa D
6,eY«YlY RpuvFa D
PETER SIZE I LINESIZE I NOOFFIATURES PgVREWIRED
TUC NOD
REY,PR I kd
its sh4v4Ar t-X /s
vvyNe*,_.o�YawY
hf)Will( kw'
Ip I D/` IJEaPr%•)l�ta V I/ I {.
M Aw oAE I
61
ALLOW
ARIA
F.E.004ILElE
SEPAREVIEW
EEEUPI
FSP
ADB ND
6N RE4NE•
VAfl CEO PLANNING REVIEW aY 0A11
—FEET HEIGHT LOT COVfRApF
110E FEAR
4
J1
MA dltr(t� J�a L/ 7o s1k ns
JOSS/6/e -6
CHECREO BY TYFE OF CONSTFUGTION GOOF
OCLU ANY
OR
aPEC4L INIPECTOR
REWIRED
D vE8
AFEA
MALT NT
LOAD
PROGRESS INSPECTIONS PER UBC 305
or� NO
�
Z * / :!5r6 ,4-f
FINAL INSPECTION REQUIRED
PUN CHECK PEE
PLUMBING
Plan Check No.
MECHANICAL
This Permit covers work to be done on private properly ONLY.
GRAOI W111.L
Any construction On the public domain (curbs, sldewFlks,
driveways• marquees, etc.) will require generate parmlesion.
STATE sugcHARaE
PamTll Application: 180 Days
Permll Limit: 1 Year • Provided Work 1s Started Within 180 Days
eTOFM DRAINAGE FEE
"Applicant, on behalf of his or her spouse, heirs, assigns and
ENO. INSPECTION FEE
w successors in interest, agrees to Indemnify, defend and hold
W harmless Ins CNy DI Edmonds, Washington. Its olliclals,
•
s employees, and agents from any and all claims for damages of
Whatever nature• arising erectly or Intlirecity from the laeuance
of )his permit. Issuance GI This permit shell not be tleeme0 to
modify, waive or reduce any requirement of any city ordinance
PUN CHECK DEPOSn
or IImiI In any way the Clly's ability to enforce any ordinance
TOTAL AMOUNT DUE
provision:'
this
I hereby acknowledge That I have reatl this application; that the
inlormalion given is correct; and Thal 1 Ina owner, or the duly
ATTENTION
APPLICATION APPROVAL
•
"
i autharixed agent of the owner, i agree to comply with city and
s1al01aw9 regulating construction: end In doing the work aulh011Z•
TNrs PENw,T
u ..RUES
This application is not a permit until
ed )hereby, no person will be employed In Violation Of the Labor
ONLY TwE
signed by the Building ORiGal or his/her
Cade of The Slate of Washington relating to Workmen's Compensa.
WORK NOTED
Deputy: and lees are paid. and receipt Is
Ilon Insurance and RCW 18.27,
SIGNATVRE IawNER OR AGENT) GATE SIONEO
INSPEnIoN
OEFAR1u E,.T
ecknowfedged In specs provided.
CITY OF
of , ,•L's s H TUBE o•rE
i L--nz.wvw.�
EDMONDS
MENTION CALL FOR
ELEASEp EW DATE
IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
.INSPECTION
N A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
771 _ O 2�
ORIGINAL — F.I. YELLOW — Inspector
CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
CE
:NAPTER J. ;1f;E7
na1
.. PINK —Owner GOLD — Asset-'
F
CITY OF EDMONDS
LAURA M. HALL
250 - 5TH AVE, N.. EDMONDS, WA 88020 . (206) 771.0220 . FAX (2061 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
! 8
9p9 O Public Works . Planning . Parks and Recreation . Engineering
.1
September 5, 1995
Torkjcl Carlson
17630 18th Avenue West
Lynnwood, WA 98037
RE: Demolition of abandon house without permit at 15604 75th Place West
Dear Mr. Carlson:
According to our records on June 9, 1995 Ursula Schluter submitted a Building Permit Application under
your signature for a permit to demolish the abandoned house on property you own at 15604 75th Place
West. On June 15, 1995 a City letter was sent notifying Ms. Schluter, Linda Carlson (assumed trustee),
and yourself that additional information was needed before the permit application could be approved to
ensure that the requirements of the Critical Areas and the Meadowdale Earth Subsidence Area
Ordinance(s) were met. After receipt of this letter, the permit application was withdrawn by Ms. Carlson
on your behalf on June 27, 1995.
It has come to our attention and verified by site inspection, that the abandoned house has since been
demolished without first obtaining the required development permits including the building demolition
permit. This is in violation of Chapters 19.00, 19.05, and 20.15B of the Edmonds Community
Development Code and is subject to penalties as outlined therein.
Since these violations have been verified by staff, within 15 days from the date of this letter, you must
apply for the required permit to demolish the house. The application shall include a written report
prepared by a licensed geotechnical engineer of the State of Washington. The report shall reference
compliance with requirements of the Critical Areas Ordinance and Meadowdale Earth Subsidence
Ordinance and make specific reference to protection of exposed slopes and impact of such work on a
known landslide area.
Failure to submit the required permit application by September 25, 1995 shall initiate the first stage of the
Civil Penalties Ordinance, whereby issuance of an Order to Correct Violation will be posted on site.
Please contact us if you have any questions at 771-0220. It is not our intent to cause you undue hardship
however, as property owner you are ultimately responsible to resolve this violations and compliance to the
code is mandatory to ensure the fair and equal treatment of all citizens.
Sincerely,
Ica nine L. Graf, BuildinLAfficial Ann Bullis, Code Enforcement Officer
cc: U. Schluter
Linda Carlson
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
,FROM.: KIVIMAK19 TAD/FAX PHONE NO. +206 743 3109 Sep. 25 1995 03:25PM Pt
OA G R A AQRA Earth &
Eadh & EmMonmente! Environmental, Ino.
11335 NE 122nd WAy
/ Suite 100
i �Q�hm Kirkland, Washington
U.S.A, 98034-6916
2f September 1995 20-4660
Fax l20a) 821 3914
11-10526-00 / sm941 ..,
4�yno
Ann Kivimaki
17830 18th Avenue west �°q�
Lynnwood, Washington 98037 "
Attention: Ms. Ann Kivimaki 3�
Subject: Erosion Control Recommendations
15604 75th Place West
Edmonds, Wsshington
Ms. Kivimaki.
This letter presente the results of a visual slope reconnaissance and recommendations on the
above to faranced alte. Tho.proparty is located at 1.6604 75th Place West in the Meadow.dele
area of Edmonds, immediately north of new construction for a residence. We visited the alto
on 18 September 1995 and met with the property owner Ms. Ann Kivimaki. According to
Ms. Ktvlmakl, the owner of the parcel to the south was given permission to use the gravel
driveway for access to construct the new house. We understand an abandoned shad, on the
order of 20 feet by 40 feet In dimension, was removed from the south side of the driveway
to access the south parcel. due to the site being within the Meadowdola Earth Subsidence
Area a permit was required by the City Of Edmonds for removal of the shed which was not
obtained prior to removal,
W9 performed a flits reconnaissance on 18 September 199E end:obeerved the elope area.
The area Is approximately 30 feet in width and slopes from the south edge of the dddawey
down approximately 10 feet on a 31-11:1 V (Horizontal:Verticai) to the generally level building
pad. The surficial Soil* consist of a loose to medium doneo silty send with soma gravel which
was placed as fill soil excavated from the construction area. Apparently the contractor
constructed the fill ramp for heavy equipment access to drill the piling and deliver building
materials for the new construction. We did not observe remnants of the shad foundation at
the surface, which possibly Is buried under the ramp. The adjacent driveway slope to the east
is covered with thick surface brush, including blackberries and ivy, end elder and maple trees,
and to the west downed trees for the site development are stockpiled. Further to the watt
thick surficial brush end native trees cover the Slope. Groundwater seepage from the elope
arose was not observed during our roconnoiessnca.
+'� Engineering B Envlrommontal Solvices
iN
FROM.; KIVIMAKItt TAD/FAY
PHONE NO. +206 743 3109 Sep- 25 1995 03:25PM P2
Ann Kivimaki,Yi;?F
f;:t
11.10626-00.
21 Septombar 1005
Pape 2
In review of the Edmonds Earth subsidence Criteria, the site is mapped as old landslide soils
Mole) with a 30 percent probability of slumps occurring during a 25-year period. In our
opinion, the soil ramp from the gravel driveway to the building pad will not increase the
potential for soil movement In this area. We recommend the following erosion control
measures be performed to the ramp area prior to the rainy soason to prevent surfioial soil
erosion.
We recommend the ramp slope be track -walked with a bulldozer upslope and downslope to
provide-ridgas to interrupt runoff shoot flow. The final surface should be graded on a 3H:1 V
slope with any ruts or depressions removed. The slope area should be hydroceeded and
maintained until vegetation becomes astablished. Depending on the season, it may be
appropriate to protect the curfece with visqueen or staked erosion control fabric until
vegetation becomes established,
If the ramp area is to be used for further construction access activities we recommend the
slope ba covered with a quarry spell rock. We racommend using 2- to 4-inch quarry spells for
blanketing the ramp elope, After construction activities are completed, revagetation of the
area should be performed as stated above.
According to the property owner Me. Kivimaki, the ramp area at the south aide of the 1 acra
parcel Is to be revagetated and no development is planned in the near future,
We trust this letter serves your current needs. If you have any questions please do not
hesitate to call,
Respectfully submitted,
AGr % Earth & Environmental, Inc.
urt R. Thompaon
Sanior Project Geol ist .JAJ.�A.
Kurt D. Merriman, P.E.
Aesooiate
CRT/KDM/lad —
p-XPInE6
�AGiiA
Earth & environmental
V
tY
I
t"�rGCr,:
CITY
OF EDMONDS
250 - 5TH AVE. N. • EDMONDS, WA 98020 . J2061771-0220 . FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
1 890g9 O Public Works . Planning . Parks and Recreation . Engineering
.1
September 26, 1995
Ms. Ann Kivimaki
17630 18th Avenue West
Lynnwood, Washington 98037
RE: Torkjel Carlson Property @ 15604 75th Place West
LAURA M. HALL
MAYOR
The City is in receipt of the AGRA soil reconnaissance report dated 9/21/95 for the
subject site. The City shall impose the recommendations for erosion control as described
within the report and pursuant to the Meadowdale Earth Subsidence Ordinance the work
shall be completed by October 15th, 1995. If some unforeseen event prevents you from
completing the work by the established deadline you must immediately notify the City.
Enclosed is a permit application for the demolition of the shed structure. Please complete
the form and return it to the City with permit fees of $30,00.
The required work as described by AGRA is as follows:
1. The ramped slope must be track -walked upslope and downslope to provide ridges to
interrupt runoff sheet flow.
2. The final grading should be 3 : I with ruts or depressions removed.
3. The slope area must be hydroseeded and maintained until vegetation becomes
established.
4. Protection of new vegetation shall be protected with visqueen or erosion control fabric
until the vegetation becomes established.
5. If the ramp slope will be continued to be used for construction activities the slope shall
be covered with quarry spall rock of 2 to 4 inch size. If no further work will be done in
this area, revegetation with hydroseeding,is required. -
If you have any questions regarding the recommendations of the report you should contact
your engineer for clarification. Please call me at 771-0220 when the work is complete.
Thank you,
00W
Jeannine L. Graf
Building Official
cc: AGRA Kurt D. Merriman, P.E.
• Incorporated August 11, 1890 •
Sister Cities International — Hekinan, Japan
I®
s�.
• �t , 4V��� .. Ef � Fi
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS ...................
FOUNDATION:
Footing ....................
Wall.......................
Pier/Porch................
Retaining Wall........,.,,
Slab Insulation...........,
PLUMBING:
Underground .............
Rough -In .................
Commercial Final ........
HEATING:
Gas Test .................
Gas Piping ................
Equipment ................
Commercial Final......... '
EXTERIOR SHEATHING
NAILING ....................
FRAMING ....................
INSULATION:
Floorinsulation ..........
Wall Insulation ...........
Ceiling Insulation.........
SHEETROCK NAILING ......
SPECIAL INSPECTION ......
RADON MONITOR AT SITE.
FINAL APPROVAL
syFaSiG1C..........
Gflu Lp �YoT- �t`�AkS.r/ S� rvo►ef�
�`�''`/ems writ-f csz� G��1vi�tJTs' •
J