Loading...
Ace Hardware 5th S. 2.pdfMEMORANDUM April 24, 2017 TO: LDG Architects FROM: Steve Fisher, City of Edmonds Public Works, 425-771-0235 RE: Plan review for trash enclosure BLD -20161689 — Edmonds Hero Ace Hardware, 550 5th Ave. S, Edmonds The proposal to locate a waste collection area to the lower west side of the building was discussed with staff and rejected due to several factors, including the large number of separate containers involved, required screening, compromised convenience for upper tenants, and property line issues. It has been determined that proper screened enclosure(s) will need to be located in accessible area(s) of the upper parking lot accessed from 5th Avenue S and/or Howell Way. Any enclosure will need to meet the minimum Public Works requirements, which can be viewed at ..int .. 1Z1W ,w clnt :and wawgt y rr g w t t FJ ct el w liml and I y )c pm cr iota 11 ►j 1 liatid. tyl�tmm 1 7 .��wtvk g � �Eti l,osgi-. )dr. A logical spot for locating a large enclosure appears to be along the south side of the parking lot, likely needing a footprint near equivalent to 5 parking spaces. Two separate enclosures could be considered, one on the south, the other on the north side, with the idea of each needing smaller footprints. Width of the structure and clear open accessibility are the driving factors for the minimum standards. Please let me know if you have any questions.