ADB-08-28 Staff Report with Attachments.pdf CE ITY OF DMONDS th 121 5 Avenue North • Edmonds, WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DSD: PD EVELOPMENT ERVICES EPARTMENTLANNINGIVISION ADMINISTRATIVE DESIGN REVIEW FINDINGS, CONCLUSIONS, AND DECISION TO: Jim Brown and Joe Fitzpatrick of JJBF Properties LLC FROM: __________________________________ Jen Machuga, Planner DATE: June 20, 2008 th ADB-2008-28: Application for a new three-unit townhouse building at 21425 – 80 Avenue West, located in the Multiple Residential (RM-2.4) zone. A. PropertyOwnerApplicant Property OwnerApplicant Jim Brown and Joe Fitzpatrick Jim Brown and Joe Fitzpatrick JJBF Properties LLC JJBF Properties LLC thth 7631 – 212 St. SW, #100 7631 – 212 St. SW, #100 Edmonds, WA 98026 Edmonds, WA 98026 B. Introduction Introduction th The applicant is proposing to construct a new three-unit townhouse building at 21425 – 80 Avenue West, located in the Multiple Residential (RM-2.4) zone (Attachment 1). Due to the project’s location within the RM-2.4 zone, the proposal is subject to the General Design Review requirements of ECDC 20.11. The subject application does not trigger SEPA review because less than four units are proposed. Therefore, the proposal may be approved by staff as an Administrative Staff Decision, subject to the requirements of ECDC 20.95.040. A “waiver” from critical areas report requirements was issued for the site under File No. CRA-1997-0026. C. EdmondsCommunityDevelopmentCode(ECDC)Compliance Edmonds Community Development Code (ECDC) Compliance 1.ECDC 16.30 (Multiple Residential) Zone a.The proposed project is located within the Multiple Family Residential (RM-2.4) zone. The surrounding properties to the north, south, and east are also zoned RM-2.4 and are developed with multi-family uses, while the th properties to the east (across 80 Avenue West) are zoned Single Family Residential (RS-8) and are developed with single-family residences. Also located within the vicinity of the subject site is Edmonds Woodway High School, which is located within the Public (P) zone. See inset at right for the current zoning map. City of Edmonds Zoning Map, May 1, 2008 Page 1 of 7 File No. ADB-2008-28 JJBF Properties 3-Unit Townhouse Project b.In the RM-2.4 zone, the minimum lot area per dwelling unit is 2,400 square feet. The subject parcel is 7,500 square feet yielding a maximum density of 3.125, which is rounded down to three dwelling units. This project proposes three dwelling units and thus is acceptable for the zone. c.The table below shows the required setbacks for structures in the RM-2.4 zone. RM-2.4StreetSideSideRear Zone(West) (North) (South) (East) Required 15 feet 10 feet 10 feet 15 feet Setbacks Proposed 15 feet 10 feet 10 feet 15 feet Setbacks According to ECDC 16.30.040.C.1, eaves and chimneys may project into a required setback not more than 30 inches. The eaves appear to meet this criterion; however, all setback measurements will be confirmed during building permit review. According to ECDC 16.30.040.C.2, uncovered and unenclosed porches, steps, patios, and decks may project into a required setback not more than one-third of the required setback, or four feet, whichever is less; provided, that they are no more than 30 inches above the ground level at any point. The site plan shows proposed patios at the rear of each unit (Attachment 2, Sheet A-1). The code allows these patios to project into the required rear setback by only four feet. Therefore, the patios will need to be reduced in size and brought into compliance with the building permit submittal. d.The maximum allowed height for the RM-2.4 zone is 25 feet plus a potential 5-foot bonus up to a maximum of 30 feet for a 4-in-12 pitch roof or greater. Height calculations were provided on the proposed site plan (Attachment 2, Sheet A-1) and represented on the elevation views (Attachment 5, Sheet A-6). The pitch of the roof is indicated as being 5.5-in-12. It appears that the applicant has attempted to stay just under the maximum allowed height of 25 feet plus the 5-foot bonus for a roof pitch over 4-in-12; however, this will be confirmed with the building permit review. e.The maximum lot coverage in multiple residential zones is 45% of the total lot area. Pursuant to ECDC 21.15.110, “coverage means the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area.” The lot is 7,500 square feet in area. The applicant states that the building will cover 3,393 square feet, which is equivalent to 45.24% of the total lot area (Attachment 2, Sheet A-1). Since the total coverage cannot exceed 45%, the applicant will need to slightly reduce the building footprint so that it does not exceed 45% coverage. This will be confirmed during the building permit review. Page 2 of 7 File No. ADB-2008-28 JJBF Properties 3-Unit Townhouse Project 2.ECDC 17.50 (Parking) a.Multifamily parking requirements are based upon the number of dwelling units and the number of bedrooms per dwelling unit, pursuant to ECDC 17.50.020.A.1.b and the table below: Type of multiple Required parkin saces gp dwelling unit per dwelling unit Studio1.2 1 bedroom 1.5 2 bedrooms 1.8 3 or more bedrooms 2.0 b.The floor plans (Attachment 3, Sheets A-3 and A-4) indicate that each of the three units will have 3 bedrooms, for a total of 6 required spaces. The applicant has shown 2 enclosed spaces within the garage of each unit, for a total of 6 provided spaces. It appears that the applicant will meet the minimum parking requirements; however, this will be confirmed through the building permit process, as the Engineering Division will need to ensure that the parking spaces shown meet the minimum size requirements. 3.ECDC 20.13 (Landscaping Requirements) Pursuant to ECDC 20.13.020.E, “automatic irrigation is required for all ADB-approved landscaped areas for projects which have more than four dwelling units, 4,000 square feet of building area or more than 20 parking spaces.” Because the proposal does not trigger SEPA review, automatic irrigation is not required. The site does not contain any significant existing landscaping. ECDC 20.13.030 requires Type II landscaping along the northern, southern, and eastern sides of the subject site in order to create a visual separation between similar uses. Type II landscaping requires evergreen and deciduous trees, with no more than 30 percent being deciduous, to be planted at intervals no greater than 20 feet on center. The proposed landscaping plan (Attachment 6) shows a mix of deciduous and evergreen trees along the northern, eastern, and southern sides of the property. However, there are more than 30 percent deciduous trees proposed along each of these sides. Therefore, a condition of approval has been added to exchange some of the proposed deciduous trees for evergreens and/or add additional trees so no more than 30 percent of the required trees are deciduous. Additionally, the trees along the northern and southern sides are shown at a spacing greater than 20 feet on center. Therefore, an additional tree must be added to the northern and southern sides so that they are spaced at an average of 20 feet on center. These additional trees should be evergreen to assist in achieving the balance of less than 30 percent deciduous. ECDC 20.13.030 requires Type IV landscaping along the western side of the subject site in order to provide a visual separation from the street. Type IV landscaping requires deciduous trees to be planted at 25 feet on center and the trunk shall be free of branches below six feet th in height. The Edmonds Street Tree Plan does not specify the street trees required along 80 Avenue West. Therefore, the proposed Serviceberry street trees are sufficient at the spacing indicated on the proposed landscaping plan (Attachment 6). Page 3 of 7 File No. ADB-2008-28 JJBF Properties 3-Unit Townhouse Project D. D.CriteriaandComprehensivePlanCompliance Criteria and Comprehensive Plan Compliance 1.Location. Since the parcel is designated “Mixed Use Commercial” and located within the “Medical/Highway 99 Activity Center,” the building is reviewed against the applicable General Design Objectives found on pages 73 through 81 of the Comprehensive Plan. 2. Objectives for Site Design: “The development of parking lots, pedestrian walkways and landscaping features is an integral part of how a building interacts with its site and its surrounding environment. Good design and site planning improves access by pedestrians, bicycles and automobiles, minimizes potential City of Edmonds Comprehensive Plan Map, December 2006 negative impacts to adjacent development, reinforces the character and activities within a district and builds a more cohesive and coherent physical environment.” (Comprehensive Plan p. 74) Fourteen different objectives for site design are discussed in the Comprehensive Plan. Not every objective necessarily applies to every project; and, some objectives may be more important than others for a particular project. For example, no signage is proposed as part of this application. However, if signage is proposed in the future, it will be reviewed against the applicable design criteria with the building permit application. th a. Vehicular Access. The site will be accessed directly off of 80 Avenue West via individual driveways. b. Location and Layout of Parking. Parking is proposed to be enclosed within the structure, as each unit will contain a two-car garage. The modulation along the western side of the building reduces the presence of the garages. c. Pedestrian Connections Offsite. A sidewalk will be provided along the frontage of the site. The front entrances are easily accessed from the sidewalk and driveways. d. Garage Entry/Door Location. Individual two-car garages for each unit will be provided on the western side of the building; however, the appearance of these garages has been minimized through the use of modulation along the entire western façade and decorative th garage doors as well as landscaping along between 80 Avenue West and the western façade of the building. The garages are setback a minimum of 15 feet from the western property line. e. Building Entry Location. All units will be accessed individually via separate front entries. These entries are easily accessed via the driveways. f. Setbacks. The project will be required to comply with setback requirements. All setbacks are shown as being thoroughly landscaped. g. Open Space. None is proposed as part of the subject application. h.. The proposed structure is attractively designed and features Building/Site Identity modulated façades and roofs. i. Weather Protection. Unit entrances are accessed through either individual garages and covered porches. j. Lighting. Craftsman-style light fixtures are proposed adjacent to the front and rear doors of each unit. These fixtures should provide satisfactory lighting at those entrances. Page 4 of 7 File No. ADB-2008-28 JJBF Properties 3-Unit Townhouse Project k. Signage. No signage was proposed in this application. All signs must meet the requirements found in ECDC 20.60. l. Site Utilities, Storage, Trash and Mechanical. No utility vaults, heating and cooling equipment, or other exterior utility equipment is proposed. The floor plans indicate locations for trash and recycling receptacles within the individual garages of each unit. A trash enclosure is not proposed at this time. m. Significant Features. There are no significant features on the site. n. Landscape Buffers. While no buffers are specifically proposed, Type II landscaping will act as a buffer between the development and the residential developments to the north, south, and east. Type III landscaping will act as a buffer between the development and th 80 Avenue West. 3.Design Objectives for Building Form: “Building height and modulation guidelines are essential to create diversity in building forms, minimize shadows cast by taller buildings upon the pedestrian areas and to ensure compliance with policies in the city’s Comprehensive Plan. Protecting views from public parks and building entries as well as street views to the mountains and Puget Sound are an important part of Edmonds character and urban form.” (Comprehensive Plan p. 78) Four objectives for building form are discussed in the Comprehensive Plan: a. Height. According to the elevation drawings provided (Attachment 5, Sheets A-6 and A- 7), building height appears to be just under the maximum 30-foot height limit, which includes the standard 25-foot height limit plus the 5-foot bonus for the use of a 4-in-12 pitch roof or greater. This is not out of character with the other multi-family structures in the immediate area. b. Massing. A combination of shingles and horizontal siding is utilized to provide interest to the building and to reduce the building’s bulk and mass. Additionally, the building contains various first and second floor bumpouts and various roof ridge lines, which also assist in reducing the building’s mass (Attachment 5, Sheets A-6 and A-7). c. Roof Modulation. The mass of the roof is broken up by the use of varied modulation. By including roof lines that run east-west as well as north-south, this not only helps to soften the appearance of the entire roof, but also helps to soften the appearance of the building in general. The use of skylights will provide for additional natural light to enter the building (Attachment 4, Sheet A-5). d. Wall Modulation. Modulation of the exterior walls is utilized to help break up the mass and scale of the building façade. The proposed building does not appear as a simple box since it contains various bumpouts and modulation along all four sides of the building. Since the main entrances to each unit are not covered by a second story, a human-scale is provided to the structure. Additionally, along all four sides of the building, the footprint of the second story does not match the footprint of the first story, thus allowing for wall modulation, which assists in breaking up the mass of the building. 4.Design Objectives for Building Façade: “Building Façade objectives ensure that the exterior of a building – the portion of a building that defines the character and visual appearance of a place – is of high quality and demonstrates the strong sense of place and integrity valued by the residents of the City of Edmonds.” (Comprehensive Plan p. 78) Four objectives for building form are discussed in the Comprehensive Plan: a. Façade Requirements. The building’s main entrances are on the western side. The covered main entrances add interest and afford some weather protection for pedestrians. These entrances also provide a human-scale to the structure. Page 5 of 7 File No. ADB-2008-28 JJBF Properties 3-Unit Townhouse Project b. Window Variety and Articulation. The building contains numerous windows proposed on all four façades. The windows along the western façade vary between single and triple-paned windows. Additionally, windows are contained within the main entrance doors and garage doors along the western façade as well. The windows along the northern and southern façades vary in size as well. The windows throughout the building provide a nice balance to each façade. c. Building Façade Materials. Proposed materials include horizontal siding along the majority of the building with shingles utilized within some of the second story bumpouts as well as over the covered main entrances. As proposed, the use of the materials helps to break up the façades and provides interest to the building. d. Accents/Colors/Trim. The applicant plans to utilize colors from the Sherwin Williams “Arts and Crafts” line of paints (Attachment 6). The proposed wall color is indicated as either “Hubbard Squash” or “Studio Blue Green”. The colors proposed are neutral, non- garish and compatible with colors used in surrounding development. Particular features of the building could be highlighted with the use of an accent or trim color approved by the Planning Division. F. TechnicalReview F. TechnicalReview The Engineering Division, Fire Department, Public Works Department, and Parks and Recreation Department have reviewed this application. The Fire Department noted that the two closest fire hydrants need the steamer port caps replaced with 4” Storz. This will be required at the time of building permit review. The Engineering Division noted that the applicant’s Traffic Impact Analysis contained an error, and that the required traffic impact fees would be $582 instead of the $529.06 stated in the Traffic Impact Analysis. This fee will be collected with the building permit fees. The Public Works and Parks and Recreation Departments provided no comments. G. PublicComments G. PublicComments No public comments were received for the subject application. H. Decision H. Decision Based on the facts, conclusions, and attachments to this report, staff finds that the design review APPROVED for file number ADB-2008-28 is with the following conditions: 1. Individual elements of this project are required to meet all applicable city codes, and it is the responsibility of the applicant to apply for and obtain all necessary permits. 2. The rear patios must meet the setback requirements established in ECDC 16.30.040. 3. The site must meet the maximum lot coverage requirement established in ECDC 16.30.030. 4. No more than 30 percent of the required trees along the northern, southern, and eastern sides of the property may be deciduous pursuant to ECDC 20.13.030.B. Exchange the species and/or add in additional evergreen trees so that no more than 30 percent of the required trees along these sides are deciduous. 5. Add one additional tree along the northern side of the property and one additional tree along the southern side of the property so that the tree spacing along these sides is a minimum of 20 feet on center pursuant to ECDC 20.13.030.B. 6. All trees must be a minimum of six feet in height at the time they are planted pursuant to ECDC 20.13.030. 7. Follow the minimum size and spacing requirements of ECDC 20.13.015 for the proposed shrubs and groundcover. 8. A final landscaping plan must be submitted in accordance with ECDC 20.13.010. This plan Page 6 of 7 File No. ADB-2008-28 JJBF Properties 3-Unit Townhouse Project must show the additional items included in these conditions of approval. A landscaping bond estimate for all improvements shall be included. Staff finds that with these conditions, the proposal is consistent with the Comprehensive Plan and other adopted city policies, and the proposal satisfies the criteria and purposes of ECDC Chapter 20.10 – Design Review, ECDC 20.12 – District-Based Design Review, and ECDC Chapter 20.13 – Landscaping, as well as meeting the requirements of the zoning ordinance. I. Attachments I. Attachments 1. Land Use Application 2. Site Plans (Proposed and Existing, Sheets A-1 and A-2) 3. Floor Plans (Sheets A-3 and A-4) 4. Roof Plan (Sheet A-5) 5. Elevation Views (Sheets A-6 and A-7) 6. Landscape Plan 7. Color Study J. AppealsandExpiration J. AppealsandExpiration The following is a summary of the deadlines and procedures for filing appeals and extensions. Any person wishing to file an appeal or extension should contact the Planning Division at 425.771.0220 for further procedural information. Appeals – Section 20.12.080 describes how appeals of administrative design review shall be made. ECDC 20.12.080.C: Design review decisions by staff under the provisions of ECDC 20.12.030 are only appealable to the extent that the applicable building permit or development approval is an appealable decision under the provisions of the ECDC. Design review by staff is not in itself an appealable decision. ECDC 20.12.080.D: Persons entitled to appeal are (1) the applicant; (2) anyone who has submitted a written document to the city of Edmonds concerning the application prior to or at the hearing identified in ECDC 20.12.020(B); or (3) anyone testifying on the application at the hearing identified in ECDC 20.12.020(B). Expiration – Section 20.12.90 describes the time limits for design review approval. ECDC 20.12.090.A: Unless the owner submits a fully completed building permit application necessary to bring about the approved alterations, or, if no building permit application is required, substantially commences the use allowed within 18 months from the date of approval, ADB or hearing examiner approval shall expire and be null and void, unless the owner files a fully completed application for an extension of time prior to the expiration date. Page 7 of 7