APPLICANT RESPONSE - PLANNING.pdfCraig Chaney Architect October 29, 2015 Sean Conrad, Planning Department City of Edmonds Public Work Department 121 5th Avenue N. Edmonds, WA 98020 Re: BLD20150239 - Plan Revisions Kemper Residence 9303 Olympic View Drive Dear Mr. Conrad, oA -4n E. 4 w NOV10 2015 SU ND01% DEPNiR.NNN,, cm OF EDMIONDIS The Kempers are in receipt of your comments and have we have enclosed revised plans and additional information in response to your review, as follows: 1A. The Building height calculations have been revised as noted in your review comment, using the existing grade where the building rectangle crosses the property line. This method resulted in a revised base average grade slightly higher than shown on the original submittal, but we've not changed the proposed building elevation. See sheet A1.1 for the revised calculations and the elevations for the revised maximum building height. 1B. The outdoor barbeque cook top has been removed from the proposed plan. See A2.1, and the site drawings. 2. A supplement to the existing critical areas report addressing the concerns outlined in your review is included with this resubmittal. Two copies have been included. I trust this will bring the project into conformance with the applicable codes and regulations. If you have any questions please don't hesitate to give me a call. Sincerely, Craig S. Chaney 8314 NE 120`h Street, Kirkland, WA 98034 . 425.802.5331 EDMONDS, WA 98020 CITY OF EDMONDS • 121 5°i AVENUE NORTH • PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: Www.edat olp(Iskyt. o.N� DEVELOPMENT SERVICES DEPARTMENT: PLANNING • ENGINEERING • BUILDING August 27, 2015 Keith and Kim Kemper Email: kkemps@comeast.net RE: PLAN REVIEW COMMENTS FOR PLAN CHECK #BLD20150239 NEW HOUSE LOCATED AT 9303 OLYMPIC VIEW DRIVE Dear Mr. and Mrs. Kemper: I have reviewed the above building permit application for the Planning Division, and it was found that the following information, corrections, or clarifications will need to be addressed before review can continue: 1. Site Plan: Please submit three copies of a revised site plan to reflect the following corrections and changes: Elevation point #2 is located off the property. In accordance with Edmonds Community Development Code (ECDC) Section 21.40.030.13, for elevation points located off the property, the elevation is the average elevation of the two points projected downward where the two sides of the building height rectangle cross the property line. For point #2 please indicate the elevations at the two line locations which cross the property boundary. Once the new elevation points have been determined please amend the building height calculations accordingly. Please note that with changes in the height calculations in the site plan you will need to revise sheet A3.3 accordingly to match the modified height information. In addition to modifying the average grade elevation please extend the average grade, building height and maximum building height lines the entire length of the north elevation shown on this page. Setbacks: Sectio n 16.20.040.0 of the Edmonds Community Development Code (ECDC) permits uncovered and unenclosed porches, steps, patios, and decks into a required setback not more than one-third of the required setback, or four feet, whichever is less; provided that they are no more than 30 inches above ground level at any point. The outdoor countertop located on the south side of the house is approximately 1-foot within the required setback. Please amend the plans to show the countertop outside of the required 10-foot setback. .. 1 r°iticaI A r•e:rs 1 rcrly�l: The subject site contains and is adjacent to a slope that is steep enough to be considered both a Landslide Hazard Area and Erosion Hazard Area as defined within ECDC Chapters 23.40 and 23.80. Pursuant to ECDC 23.80.070.A.1, the minimum required buffer as measured from the top of the slope is equivalent to 50 feet or the height of the slope, whichever is greater. A 15-foot critical areas setback is required in addition to this buffer. Since the house and patio are proposed within the minimum required buffer and critical areas building setback, the g otechnical eiigineer must review the proposed improvements within the buffer and building setback:. The report must address all applicable requirements of ECDC Chapters 23.40 and 23.80. This will need to include a review of the project and how it meets the specific development standards of ECDC 23.80.060 and 23.80.070. Additional comments fry►nl the l3uildi�n llivision and 1 ►► sir�ov(. �At si�ar� �o�a re a�ire additional changes es to flee site ►l aNy bevoncl tlliase, discus ed aised siteplan addressi ► the above cited issues should beet►a ►Acted once ou leave received coma ents from the other reviewin = divisions. Please submit three copies of your revised site plan (including one reduced copy) and two copies of any revised building plan sheets to a Development Services Permit Coordinator. Our office hours are Mondays, Tuesdays, Thursdays, and Fridays between 8:OOam and 4:30pm. If you have any questions, feel free to contact me at (425) 771-0220. Sincerely, Development Services Department - Planning Division Sean Conrad Associate Planner