This letter is to address Erigineering Plan Review Comments dated July '11, 2013 from City of
Edmonds.
'1) 0 K
2) OK
3) OK
4) OK
5) OK
6) OK
7) OK
8) OK
9)
a, Ductile iron pipe with anchoring is called out between the garage entrance strip drain
and CB#2 as required because the pipe slope is greater than 30%. The remainder
of the StOrrn drainage systern is called out with PVC pipe since the pipe slopes are
less than 30%. In addition, the PVC pipes are provided with anchors as an extra
margin of safety and as recommended by the project geotechnical engineer. The
pipe anchor detail shown (K('.SVVDM Fig. 4,2,1.B) is appropriate for the IDI and PVC
pipe materials.
b. Noted.
c. ,cos discussed, pipe slopes and scale are correctly shown on the (Plans. There are
no slopes above 4.0%.
d. Geotechnical engineer's recommendations are attached, BNSF Pipeline License
attached. The BNSF document is the result of BNSF review and approval of the
stom'i drainage outfall system, including pipe material, method or -
attachment to retaining wall, and design flows,
10) OK W)fli ;"" Avirq i i r,
K'ilkkilid WA 93W.-io 3(M
I "howl e (C)"q F'21 306""
V , ax: 025021 2423,
EdllI (eft'
............. ................... ...
. . ...................................... . .......... . ................. . . .. . ........ . .
JE;.,nnifeLambe�[
August 9, 20,13
Pa9e 2 of 2
'I'l) (-"B#'i and paralld storfy,n pipes rdocaled OUI Of SeWel-
'12) OK
"13) 06
'14) OK
15) OK
If you should have any questions concerr*ig the plan revisions, pkease give me a call.
Sincerely yours,
DR. STRONG Consuffing ErigilleeM' Inc.
g
�41
Walter-J, Shostak, P.E.
Senior Project Engineer, VIP, o4rr%' or" 'E"1/r'/ ir'446S
VVJS/Iib
Attachrnents:
1, Revised engineering plans (3 sets)
2, Geotechnical Plan Review letter (Robinson -Noble, Aug. 8, 2013)
1 BNSF Pipeline License