Loading...
Applicant_Response_To_ENG2_Comments.pdfj/liriVI AUgLISt two, 2013 RESI'M Jennifer L.ari'ibert AU ('31 21l] 13 C4y of Edrnonds 121 Carl, Aveni.ie Nortlli ON f"ItCIM" E,'D VAO N lit ),S Edmonds VVA 98020 via ernail: pak,.il@gi-ilfii-irriacleaii,coin Re-, Perrnit Application #BLD20130211 Dent Residence — 16330 75"' Ave W Project No. '12022 Dear Ms. Lambert: This letter is to address Erigineering Plan Review Comments dated July '11, 2013 from City of Edmonds. '1) 0 K 2) OK 3) OK 4) OK 5) OK 6) OK 7) OK 8) OK 9) a, Ductile iron pipe with anchoring is called out between the garage entrance strip drain and CB#2 as required because the pipe slope is greater than 30%. The remainder of the StOrrn drainage systern is called out with PVC pipe since the pipe slopes are less than 30%. In addition, the PVC pipes are provided with anchors as an extra margin of safety and as recommended by the project geotechnical engineer. The pipe anchor detail shown (K('.SVVDM Fig. 4,2,1.B) is appropriate for the IDI and PVC pipe materials. b. Noted. c. ,cos discussed, pipe slopes and scale are correctly shown on the (Plans. There are no slopes above 4.0%. d. Geotechnical engineer's recommendations are attached, BNSF Pipeline License attached. The BNSF document is the result of BNSF review and approval of the stom'i drainage outfall system, including pipe material, method or - attachment to retaining wall, and design flows, 10) OK W)fli ;"" Avirq i i r, K'ilkkilid WA 93W.-io 3(M I "howl e (C)"q F'21 306"" V , ax: 025021 2423, EdllI (eft' ............. ................... ... . . ...................................... . .......... . ................. . . .. . ........ . . JE;.,nnifeLambe�[ August 9, 20,13 Pa9e 2 of 2 'I'l) (-"B#'i and paralld storfy,n pipes rdocaled OUI Of SeWel- '12) OK "13) 06 '14) OK 15) OK If you should have any questions concerr*ig the plan revisions, pkease give me a call. Sincerely yours, DR. STRONG Consuffing ErigilleeM' Inc. g �41 Walter-J, Shostak, P.E. Senior Project Engineer, VIP, o4rr%' or" 'E"1/r'/ ir'446S VVJS/Iib Attachrnents: 1, Revised engineering plans (3 sets) 2, Geotechnical Plan Review letter (Robinson -Noble, Aug. 8, 2013) 1 BNSF Pipeline License M via ernaik paul@griffiiimaclean.coni R-\20,12Q I 2022\Coriesl)c)ndencolLettei-slout\L'I 30809—shoreline.docx