Approved Cost Esitmate-PLN20110008.pdfSite Improvement Bond Quantity Worksheet $15 Web date* 04f03/2015 LV King County Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600. 206-296-6600 TTY Relay 711 Project Name: I/iel5d i �7 t�"� -T aAf Date: Location: % W1 k Project No.: Activity No.: Clearing greater than or equal to 5,000 board feet of timber? yes no If yes, Forest Practice Permit Number. (RCW 76.09) PZ ftwId,IvT Page 1 of 9 '!�2 9/'Z 9/2-0 1 -7 — 2t—k -;fP Zo l l o ac7 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. ** = 1 12411 FzejtsLw = o912°I [11 (tom►�6," All Sift *vzVMA* _ t laAdsco,ye Hpp;,UV'EJ 3 NOTEU Bond Quantities Warksheet 2015 (4).xfsx g� G; EERING � 1654ulo cQ0 � �✓' 2la�a • 2t% Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 6/21/2016 Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015 Rbference I, Unit Price. Unit ! . Quantity. # of A pligations Cost EROSION/SEDIMENT CONTROL Number 6ackfiil & compaction -embankment ESC-1 $ 6,00 CY Check dams, 4" minus rock E5C-2 SWDM 5.4.6.3 $ 80.00 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) S 95,001 CY Ditching ESC-4 $ 9.00 CY Excavation -bulk ESC-5 $ 2.00 CY Fence, silt ESC-6 SWDM 5,4.3.1 $ 1.501 LF Fence, Temporary (NGPE) ESC-7 $ 1.50 LF Hydroseedin ESC-8 SWDM 5.4.2.4 $ 0.,80 SY Jute Mesh ESC-9 SWDM 5.4.2.2 $ 3,50 SY J Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.50 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 2.00 SY Piping, temporary, CPP. 6" ESC-12 $ 12.00 LF Piping, temporary, CPP, 8" ESC-13 $ 14.00 LF Piping, temporary, CPP. 12" ESC-14 $ 18.00 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 4.00 SY Rip Rap, machine placed: slopes ESC-16 WSDOT 9-13.1(2) $ 45.00 CY Rock Construction Entrance, 50'xl5'x1 ESCA 7 SWDM 5.4.4.1 $ 1.800.00 Each Rock Construction Entrance, 100'xl5'xl' ESC-18 SWDM 5.4.4.1 $ 3,200.00 Each Sediment pond riser assembly ESC-19 SWDM 5.4,5.2 $ 2,200.00 Each I Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 19.00 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5A $ 70.00 LF Seeding, by hand Sodding. 1" deep, levei ground ESC-22 SWDM 5.4.2,4 $ 1.00 SY ESC-23 SWDM 5.4.2,5 $ 8.00 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5,4.2.5 $ 10.00 SY TESC Supervisor ESC-25 $ 110.00 HR Water truck, dust control ESC-26 SWDM 5.4.7 $ 140.00 HR WRITE -IN -ITEMS C o %Oo Each ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL, COLUMN: Page 2 of 9 Bond Quantities Worksheet 2015 (4).xlsx $ Ion $ , $ d A 5`Lq- = U NEI &LyF Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 6/21/2016 Site Improvement Bond Quantity Worksheet Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI - 1 $ 6.00 CY Backfill & Compaction- trench GI-2 $ 9.00 CY 0 2 .1 V A Clear/Remove Brush, by hand GI - 3 S 1.00 SY Clearing/Grubbing/Tree Removal GI - 4 $10,000.00 Acre Excavation - bulk GI-5 $ 2.00 CY Excavation - Trench GI-6 $ 5.00 CY Fencing, cedar, 6' high GI-7 $ 20.00 LF Fencing, chain link, vinvl coated, 6' high GI - 8 $ 20.00 LF Fencing. chain link, gate, vinvi coated. 20 Gl - 9 $ 1 A00.00 Each Fencing, split rail, 3' high GI -10 $ 15,00 LF Fill & compact - common barrow GI -11 $ 25.00 CY Fill & compact - gravel base Gi - 12 $ 27.00 CY Fill & compact - screened topsoil GI - 131 $ 39.00 CY _ Gabion. 12" deep, stone filled rnesh GI - 14 $ 65.00 SY Gabion, 18" deep, stone filled mesh GI -15 $ 90.00 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 150.00 SY Grading, fine, by hand GI - 17 $ 2.50 SY Grading, fine, with grader GI - 18 $ 2.00 SY Monuments, 3' long GI - 19 $ 250.00 Each Sensitive Areas Sign GI - 20 $ 7.00 Each Sodding, 1" deep, sloped ground Gl - 21 $ 8.00 SY Surveying, line & grade I GI - 22 $ 850.00 Day Surveying, lot location/lines I GI - 23 S 1,800.00 1 Acre Lrraffic control crew ( 2 fiagggers 1 l GI - 24 $ 120.00 1 HR �7 to 0Q Trail, 4" chipped wood I GI - 25 $ 8.00 1 SY Trail, 4" crushed cinder GI - 26 $ 9.00 SY Frail, 4" top course GI - 27 $ 12.60 SY Wall, retaining, concrete GI - 28 $ 55,00 SF Wall, rockery GI - 29 $ 15.00.1 SF Page 3 of 9 SUBTOTAL Web date: 04/03/2015 Unit prices updated: 03/02/2015 'KCC 27A authorizes only one bond reduction, Version: 03/02/2015 Bond Quantities Worksheet 2015 (4).xlsx Report Date: 6/21/2016 Site Improvement Bond Quantity Worksheet Web dale: 04103/2015 Existing Right-of-way Future Public Right of Way 8 Drainage Facilities Private Improvements Unit Price Unit-1 Quanl. I Cost -Q—uant.T Cost Quant. Cast ROAD IMPROVEMENT No. AC Grinding, 4' wide machine < 1000sy RI -1 $ 30.00 SY AC Grinding, 4' wide machine 1000-2000: RI - 2 $ 16,00 SY AC Grinding, N wide machine > 2000s RI-3 $ 10.00 i SY AC RemovaUDisposal RI-4 $ 35.00 SY Barricade, type III ( Permanent) RI-6 $ 56.00 LF Curb & Gutter, rolled RI-7 $ 17.00 LF Curb & Gutter, vertical RI-8 $ 12.50 LF (pZ) 1 Curb and Gutter, demolition and disposal RI-9 1 $ 18.00 LF I Curb, extruded asphalt RI -10 $ 6,50 LF Curb, extruded concrete Rl -11 S 7.00 LF Sawcut, asphalt, 3" depth RI -12 $ 1.85 LF Sawcut, concrete, per V depth RI -13 $ 3.00 LF P^ Sealant, asphalt RI -14 $ 2.00 LF F P7 Shoulder, AC, ( see AC road unit price } RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 15.00 SY Sidewalk, 4" thick RI -17 $ 38.00 SY Sidewalk, 4" thick, demolition and disposs RI -18 $ 32.00 SY Sidewalk, 5" thick RI -19 $ 41,00 SY Sidewalk, 5" thick. demolition and dispose RI - 20 $ 40.00 SY Sign, handicap RI - 21 $ 85.00 Each Striping, per stall RI-221 7.00 Each Striping, thermoplastic, ( for crosswalk) IRI-231 3.00 1 SF Striping, 4" ref ectorized line RI - 24 $ 0.50 1 LF Page 4 of`9 SUBTOTAL. Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities Worksheet 2015 (4).xlsx Report Date: 6/21/2016 Site Improvement Bond Quantity Worksheet Web date; 04/03/2015 1 Existing Rlght-of-way Future Public Right of Way 8 Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost ROAD SURFACING No 4" Rock = 2,5 base & 1.5" to 3 course) 9.1/2" Rock= 8" base & 1.5" top course) Additional 2.5" Crushed Surfacina RS- 1 $ 3,60 SY HMA 112" Overlay, 1.5" RS-2 S 14,00 SY HMA 1/2" Overlay 2" RS-3 $ 18.00 SY HMA Road, 2", 41' rock, First 2500 SY RS-4 $ 28.00 SY 7 1 W i HMA Road, 2", 4" rock. Qty. over 2500 S) RS - 5 $ 21.00 SY INA Road, 3", 9 1/2" Rock, First 2500 Sl RS - 6 $ 42.00 SY HMA Road, 3", 9 112" Rock, Qtv Over 25Ci RS - 7 $ 35,00 SY Not Used RS - 8 Not Used RS-9 HMA Road, 6" Depth, First 2500 SY RS -10 S 33.10 SY HMA Road, 6" Depth, Qty. Over 2500 SY RS -11 S 30.00 SY HMA 3/4" or 1 "', 4" Depth RS - 12 $ 20.00 SY Gravel Road. 4" rock. First 2500 SY RS - 13 $ 15.00 SY Gravel Road, 4" rock, Qty. over 25DO SY RS -14 $ 10A0 SY PCC Road (Add Under Write -Ins w/Desig RS - 15 Thickened Edge RS - 17 $ 8.60 LF Page 5 of 9 SUBTOTAL �3�-j 5Z A - Unit prices updated; 03/02/2016 "KCC 27A authorizes only one bond reduction. Version:' 03/02/2016 Bond Quantities Worksheet 2015 (4).x1sx Report Date: 6/21/2016 Site improvement Bond Quantity Worksheet Web date; 04/03/2015 Existing Right -cif -way Futuro Public Privato Right of Way I Improvements & Drainage Facilities Unit Price Unit Quant. Cost Quant. Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of W cover was assumed. Assume perforated PVC is same price as solid pipe Access Road. RID D - 1 $ 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards . removable D - 3 S 452.34 Each k (CBs include frame and lid) CB Type I D - 4 $ 1,500.00 Each CB Type IL D - 5 $ 1.750.00 Each CB Tvpe 11, 48" diameter D - 5 $ 2,300,00 Each for additional depth over 4' D - 7 $ 460.00 FT CB Tvpe it, 54" diameter D - 8 $ 2,500.00 Each for additional depth over 4' D - 9 $ 495.00 FT CB Type It. 60" diameter D -10 $ 2.800.00 Each for additional depth over 4' D -11 $ 600.00 FT CB Tvpe 11.72" diameter 0-121 $ 3,600.00 1 Each for additional depth over 4' D -13 $ 850.00 FT Through -curb Inlet Framework_ (Add) 0 -14 $ 400.00 Each Cleanout, PVC, 4" D -15 $ 150,00 Each Cleanout, PVC, 6" D -16 $ 170.00 Each Cleanout, PVC, 8" D -17 1 $ 200.00 Each Culvert. PVC, 4" D -18 $ 10.00 LF Culvert, PVC, 6" D - 19 $ 13,00 LF Culvert. PVC. 8" D - 20 $ 15.00 LF Culvert, PVC, 12" D - 21 $ 23.00 LF Culvert, CMP. 8" D - 22 $ 19.00 LF Culvert, CMP,12" D - 23 $ 29,00 LF Culvert. CMP,15" D - 24 S 35.00 LF Culvert, CMP, 18" D-251 5 41.00 LF Culvert. MAP. 24" D - 26 1 $ 56,00 LF Culvert, CMP, 30" D - 27 $ 78.00 LF Culvert, CMP, 36" D-281 $ 130.00 LF Culvert. CMP, 48" D - 29 $ 190.00 LF Culvert, CMP. 60" D - 30 1 $ 270.00 LF CulVert, CMP, 72" D - 31 1 $ 350.00 LF Page 6 of 9 SUBTOTAL I / Unit prices updated: 0310212015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2016 Bond Quantities Worksheet 2015 (4),x1sx Report Date: 6/21/2016 Site Improvement Bond Quantity Worksheet Web date; 04/03/2015 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements No. Unit Price Unit Quant, Cost Quant. Cost Cluant. Cost Culvert, Concrete, 8" D - 32 S 25.00 LF Culvert, Concrete, 12" D - 33 $ 36.00 LF Culvert, Concrete, 15" D - 34 $ 42.00 LF Culvert: Concrete, 18" D - 35 $ 48A0 LF Culverl, Concrete, 24" D - 36 $ 78.00 LF Culvert, Concrete, 30" D - 37 $ 125.00 LF Culvert, Concrete, 36" D - 38 $ 150.00 LF Culvert, Concrete, 42' D - 39 $ 175,00 LF Culvert, Concrete, 48" D -40 $ 205,00 LF 1A Culvert, CPP, 6" D - 41 $ 14.00 LF ' Culvert, CPP, 8" / D - 42 $ 1600 LF _ Culvert CPP, 12" D - 43 $ 24.00 LF Culvert, CPP, 15" D - 44 $ 35.00 LF ! CUlvcrt, CPP, 18" $ 41.00 LF Culvert, CPP, 24" Culvert. CPP, 30" - 46 D - 47 56.00 _jA 78.00 LF LF Culvert, C" _ L D - 4$ $ . 0 LF _ U V Ditching D - 49 S 9.50 CY t Flovr Dispersal Trench (1.436 base+) D - 50 $ 28,00 LF French Drain (3' depth) D - 51 $ 26.00 LF Geotexttte, laid in trench, polypropylene D - 52 S 3,00 SY Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 2,000.00 Each Pond Overflow Spilhvay D - 55 $ 16.00 SY Restrictor/Oil Separator, 12" D- 56 S 1,150.00 Each Restrictor/Oil Separator, 15" 1 D - 57 $ 1,350.00 Each Restrictor,'Oii Separator, 18" D - 58 $ 1,700.00 Each Ripiap, placed D - 59 $ 42.00 f CY Tank End Reducer (36" diameter) D - 60 $ 1,200.00 Each Trash Rack, 12" D - 61 S 350.00 Each Trash Rack, 15" D - 62 S 410.00 Each Trash Rack, 18" D - 63 5 480.00 Each Trash Rack, 21" D - 64 $ 550.00 Each Page 7 of 9 SUBTOTAL Unit prices updated: 03/0212015 "14CC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities Worksheet 2015 (4).A.5x Report Date: 6/21/2016 Site Improvement Bond Quantity Worksheet Web date: 041OW2015 Existing Right-of-way Future Public i Private Right of Way I Improvements & Drainage Facilities ` Unit Price Unit Quant, Price Quant. I Cost I Quant. Cost PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders No. 2" AC, 2" top course rock & 4" borrow PL -1 S 21.00 5Y NA NA 2" AC, 1.5" top course & 2.5" base cours PL-2 S 28.00 SY NA NA 4" select borrow PL-3 S 5.00 SY NA NA 1.5" top course rock & 2.5" base course PL -4 S 14.00 SY I NA NA UTILITY POLES & STREET LIGHTING U151ity poIe relocation costs must be accompanied by Franchiso Utility's Cost Estimate Utility Polefsl Relocation J UP-1 Lump Sum Street Light Poles wlLuminaires UP-2 S 7,500.00 Each WRITE-IN-ITERIS Such as detention/water quality vaults. Stormwater Vault Wl -1 Each Block Wall WI -2 S 16,00 SY Yaro Drain Wl - 3 $ 225.00 CY -4 LF 10 \v WI-6 _ �-_ _. INI-7 Wl-8 WI-9 SUBTOTAL SUBTOTAL (SUM ALL PAGES; 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 C '201'70 -14 3� { °.5+ *' -- D Unit prices updated: 03/02/2015 " KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities Worksheet 2015 (4).xlsx Report Date: 6/2112016 Site Improvement Bond Quantity Worksheet Web date. 04/03/2015 Original bond computations prepared by: Name: PE Registratio Firm Name: . Date: 2 ' i � / Tel, #: 2(� 7S ]— Address: V C%U l - �t L [ (� 'ii 19 XO t Project No: 2'0 (t ` 4p v Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/" (First $7,500 of bond' shall be cash.) Performance Bond* Amount (A+B+C+D) = TOTAL Maintenance/Defect Bond" Total FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND' AMOUNT (A) $ 6 ,10 (C) $ 10 (A+B) J o q 1 - (T) $ i Minimum is $2000. CX ti2o MINIMUM BOND` AMOUNT REQUIRED FOR RECORDING OR TEMPORARY OCCUPANCY AT SUBSTANTIAL COMPLETION1 i` T x 0.30 $ Minimum is $2000. / l°= �sptca- Lc) Atk stye. \v4ptf NQj PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND* +U) x 25 = Q� Minimumm is 2000 NAME OF PERSON PREPARING BOND` REDUCTION: �14� `� � � �:- Date: Q ( 2 / A-7— NOTE: The word "bond" as used In this document means a financial guarantee acceptable to King County. / " NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND= AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY Page 9 of g Unit prices updated: 03/02/2015 Check out the DDES Web site at tivv�w.lsirlgcountV•aoy/permits Version: 03/02/2015 Bond Quantities Worksheet 2015 (4).xlsx Report Date: 6/21/2016