Loading...
bl20140598_Rotary-1.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20140598 August 5, 2014 th Project Name/Address: Rotary New Single Family Residence 8116 206 St SW Contact Person/Address/Fax: Kenneth Peirce krpeirce@aol.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing Permit Assistance. General: 1. Any time a private utility, in this case the sewer, crosses another property parcel, an easements must be obtained from that property allowing the crossing. 2. Please add North arrow to plans. Sheet C 1: 3. Add note to plans: “All disturbed areas on and off site shall be compost amended to meet requirements of BMP T5.13 in the Stormwater Manual, Vol V, Chapter 5. Sheet C 2: 4. Please note the location of the nearest fire hydrant on plan and note the distance between the property line and the hydrant. 5. Are footing drains required for this project? If so, please show where they will discharge. Footing drains can not be connected to the proposed drywells unless a letter is provided from the geotech stating that there is enough capacity in the design to take on the footing drain flow. 6. Rockeries may not support a surcharge. Retaining walls can but design must be reviewed. Please see Handout B#62 to see the requirements for a wall supporting a surcharge and submit the documentation noted for review. 7. Please note that a 12” locking cast iron lamphole cover with ½” hexbolts is required at current location of exiting 6” cleanout. 8. The side sewer is shown connecting to a private line. Please show on plans where this sewer connects to the City Sewer Main. I have attached a map showing where the City Sewer Main is located. DATE FAXED/E-MAILED 7/13/2017 PAGE ___ OF __ 12 9. Oil/Water separator is not required on CB #2 though could be installed on CB #1 to help settle out the oils from the access road. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/13/2017 PAGE ___ OF __ 22