Loading...
BLD17-1835 - Edmonds Townhomes - Approval Ltr by DBeck (7-16-2018).docTransmittal July 16, 2018 Leif Bjorback Building Official City of Edmonds 121 5th Avenue North Edmonds, WA 98020-3145 Subject BLD2017-1835 Edmonds Townhomes Review Structural Non-Structural Applicable Codes 2015 International Building Code (IBC) 2009 ICC/ANSI A117.1-2009 Accessible and Usable Buildings and Facilities (ICC A117.1-09) 2015 Washington State Energy Code Washington State Amendments Edmonds Community Development Code (ECDC) Drawings Stamped electronic drawings have been uploaded to the Edmonds ftp site. Our structural & non-structural reviews of the permit application materials & drawings is now complete. We find the drawings to be in substantial compliance with applicable codes. The following items should be noted as Conditions of Permit Approval: Redlines can be found on the following sheets: C and 6. The Building Enclosure is required to be inspected by a qualified building enclosure inspector during the course of construction. The inspection is to be completed by a third party, independent inspector. The City may not issue a Certificate of Occupancy until the qualified, third party independent inspector prepares a report and submits to the building department a signed letter certifying that the building enclosure has been inspected during the course of construction and that the construction is in substantial compliance with the building enclosure design documents. Deferred submittals are required on this project for the following elements: fire-stop systems, including membrane- and through-penetration fire stop assemblies not specified or detailed within the drawings. Special inspections are required on this project as specified within the structural drawings: concrete construction and reinforcing steel. Reference the Structural Notes on sheet S1.1. Geotechnical inspections are required as recommended by the geotechnical engineer, Cobalt Geosciences (Geotechnical Investigation, Proposed Townhouse Structure, 20904 72nd Avenue West, Edmonds, Washington by Cobalt Geosciences, dated September 25, 2017). “Cobalt Geosciences should be retained to provide part time field review during construction in order to verify that the soil conditions encountered are consistent with our design assumptions and that the intent of our recommendations is being met. This will require field and engineering review to: Monitor and test structural fill placement and soil compaction Verify the soil bearing at foundation locations for the building Verify slab subgrade and capillary break material below slab-on-grade Observe footing drainage placement Verify infiltration rates at system locations Observe proof rolls of roadway subgrade prior to asphalt placement” Douglas Beck, PE, SE Beck & Associates, PLLC Page 2 of 2 Beck & Associates, PLLC Structural Engineering & Code Consulting 16425 SE 66th Street, Bellevue, WA 98006 ● beckpllc@msn.com ● PH: 206-313-3739