Loading...
BLD20060569B.pdfSTATUS: ISSUED 9/1/2006 Parcel No: 00548900000904 RYAN WRIGHT 17518 52ND AVE W LYNNWOOD, WA 98037 206-261-3627 CITY OF EDMONDS --- 121 5TH AVENUE NORTH - EDMONDS,WA 98020 IIII�IIII PHONE: (425) 771-0220 - FAX: (425) 771-0221 RYAN WRIGHT 17518 52ND AVE W LYNNWOOD, WA 98037 206-261-3627 Permit #: -BLD200.6056. Expiration Date: 9X1/2007` Project Addre's's: 1040 PUGET DR; EDMONDS; OWNER AS GENERAL 17518 52ND AVE W LYNNWOOD, WA 98037 206-261-3627 LICENSE #: EXP: SFR; MAIN FLOOR 1756SF, UPPER FLOOR 2693SF, DECK 356SF, COV PORCH 2O0SF, BASEMENT CELLAR STORAGE (NOT TO BE USED AS HABITABLE SPACE) 379SF, GARAGE 1384SF. VALUATION: $475,548 PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2003 OTHER: N ------- OTHERDESC: ZONE: RS -12 NUMBER OF STORIES: 2 VESTED DATE: NUMBER OF DWELLING UNITS: 1 BASEMENT 0 1 ST FLOOR 0 2ND FLOOR 0 BASEMENT: 379 1 ST FLOOR 1756 2ND FLOOR 2693 3RD FLOOR 0 GARAGE 0 DECK 0 OTHER- 0 13RD FLOOR- 0 GARAGE 1384 DECK- 556 OTHER 0 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULAT ING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. HIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. a Signature Print Name kw- 9 ATTENTION v ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED, UBC109/ IBC 10/ IRCI 10. _ ARCHIVE APPLICANT ASSESSOR OTHER STATUS: ISSUED BLD20060569 • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Approval of this foundation design is conditional subject to inspection of existing site soil conditions. Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Maximum Height 25 feet. Measured from average elevation of undisturbed soil at corners of extended building rectangle. Subject to field check by building department. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Type B or L vent connectors required on fuel-buming appliances passing through unheated spaces. Per IMC 803.2 • Obtain Electrical Pemtit from State Department of Labor & Industries. 425-290-1309 • Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. • City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping shall be of like materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is ahered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1309. • Any request for the modification, variance or other administrative deviation (hereinafter "variance") must be specifically called out and identified. Approval of any plat or plan containing provisions which do not comply with City code and for which a variance has not been specifically identified, request and considered by the appropriate City official in accordance with the appropriate provision of City code or State law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of7:00amto 6:00pmon weekdays and 10:00amand 6:00pmon Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INS PECTIONS BUILDING 425 771-0220 EXT. 1333 ENGIlVFFMG 425 771-0220 EXT. 1326 FIR 425 771-0215 PUBLIC WORKS 425 771-0235 1 PR&TRFATMEVT (425)672-5755 1 RECYCLING 425 275-4801 • &Pre -Con • &StormTightline • &Storm Connect to Stub • &Storm Detention System • &Footing Drain Connection • &Water Service Line • &Driveway Form & Slope Ver. • &Engineering Final • B -Setbacks • B -Footings • B -Foundation Wall • B-Isolated Footings/Piers B-Retaining Wall B-Slab Insulation • B-Plumb Ground Work • B-First Floor Framing • B-Plumb Rough In • B-Gas Test/Pipe • B-Equipment-Mech • B-Exterior Sheathing • B-Shear Nailing • B-Height Verification • B-Framing B-W all Ins ulation/Caulk B-Floor Insulation/Caulk • B-Ceiling Insulation/Caulk • B-Sheetrock Nail • B-Building Final Permit Inspection Details Permit: BLD20060078 PERM1TTRAx 1001 - E -Erosion Control/Mobilization Complete,,?, Y� 08/25/2006 Ed 30 y Total Time: 30 1078 - E -Pre -Demolition Sewer Cap Complete? — �— 08/25/2006 Ed 30 y Total Time: 30 1079 - E -Pre -Demo Water Sery Discnct/AVB Complete? Y 08/25/2006 Ed 30 y Total Time: 30 1081 - E -Engineering Final Demo Complete? . Y 08/25/2006 Ed 30 y Total Time: 30 1100 - B -Pre -Demolition Complete? _ Y 07/27/2006 MS 20 PRE -DEMO APPROVED y Total Time: 20 1102 - B -Asbestos PSGAA Permit° Complete? Y 07/27/2006 MS 20 NEED COPY AT FINAL INSPECTION N 08/08/2006 MS 20 CORRECTION NOTICE WRITTEN N 08/16/2006 MS 20 ASBESTOS SURVEY AND PSCAA PERMIT RECEIVED y Total Time: 60 1104 - B -Cleaned Site/Bid Final Demolition Complete? yl 08/08/2006 MS 20 CORRECTION NOTICE WRITTEN N 08/16/2006 MS 20 NOT READY N 08/23/2006 MS 20 FINAL APPROVED y Total Time: 60 Total Inspections: 11 Total Time: 260 6/9/2009 2:33:32 PM Page 1 of 1 5 CD io CD ml; W� lco CD m CD z D m Z 041 > -4 M Z' -T v oi! -n, z ca � 0 C/ 0 0 exp M/z m 0 C ci 0 --------- - z 0