STATUS: ISSUED
Expiration Date: 10/18/2
r- -
Permit$#: BLD20
Parcel No: 00451900101202
PROPERTYONNINER APPLICANT CONTRACTOR
84TH AVE 3 UNIT APARTMENT PACIFIC HOMES DEVELOPMENT LLC PACIFIC HOMES DEVELOPMENT LLC
11511 39TH AVE SE 2400 NW 80TH ST 2400 NW 80TH ST
EVERETT, WA 98208 SEATTLE, WA 98177 SEATTLE, WA 98117
206-571-5978 206-571-5978
LICENSE #: PACIFHD975P7 EXP:12/20/2007
O'
TRIPLEX
VALUATION: $449,462 1KNICAINFLETE—
UElm
PERMIT TYPE: Commercial
PERMIT GROUP: 6 - Apartment/Condo New
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION: VB
RETAININGWALL ROCKERY: N
OCCUPANT GROUP: R3
OCCUPANT LOAD:
FENCE: N ( 0 X 0 FT.)
CODE: 2003
OTHER: N ------- OT HERDESC:
ZONE: RM -1.5
NUMBER OF STORIES: 3
VESTED DATE:
NUMBER OF DWELLING UNITS: 3
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 493 1 ST FLOOR: 1917 2ND FLOOR:
1939
3RD FLOOR: 0 GARAGE: 0 DECK. 0 OTHER 0
PRD FLOOR 0 GARAGE: 1 130 DECK 0 OTHER: 0
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED
THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27.
RS P [ON NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
YA!S m If e Sod x -11p-oft-k- /'
Signature Print Name Date Released By Date
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10.
ARCHIVE = APPLICANT = ASSESSOR = OTHER
STATUS: ISSUED BLD20060573
CONDITIONS
• REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT:
1) FIELD WELDING
2) PLACEMENT OF FILL AND COMPACTION
3) SOIL BEARING VERIFICATION
4) PROOF ROLLING
5) FOOTING DRAIN INSTALLATION
• Lot line stakes must be in place at the time of foundation/setback inspection.
• Installation, use and maintenance of per manufacturerd equipment and components shall be per manufacturer's specifications,
installations instructions, and applicable state codes. Provide manufacturer's information on site for Building Inspector.
• Approval of this foundation design is conditional subject to inspection of existing site soil conditions.
Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material.
Provisions must be made for the control and drainage of surface water around buildings.
• Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation systemoperation
description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating
instructions).
• Maximum Height 25 feet. Measured from average elevation of undisturbed soil at comers of extended building rectangle.
Subject to field check by building department.
• Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed.
• In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per
UPC 608.
• Type B or L vent connectors required on fuel-buming appliances passing through unheated spaces. Per IMC 803.2
• Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
• Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted.
• Submit all special inspection reports to the City Building Inspector on a weekly basis.
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one
and two-family dwellings.
• Any request for the modification, variance or other administrative deviation (hereinafter "variance") must be specifically called
out and identified. Approval of any plat or plan containing provisions which do not comply with City code and for which a
variance has not been specifically identified, request and considered by the appropriate City official in accordance with the
appropriate provision of City code or State law does not approve any items not to code specification.
• Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff.
• Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT. SEE ECDC 19.00.005(A)(6)
BUILDING (425) 771-0220 EXT. 1333 1 FNGINI]MING (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 1
PUBLIC WORKS 425 771-0235 1 PRE TREATMENT (425)672-5755 1 RECYCLING 425 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being
requested. Contact Name and Phone Number, Date Prefereed, andwhether you prefer mornine or afternoon.
4iiVO4,t*41074
�
• B -Setbacks
• B -Footings
• B -Foundation Wall
• B -Foundation Drainage
• B -Slab Insulation
• B -Plumb Ground Work
• B -First Floor Framing
• B -Plumb Rough In
• B -Cas Test/Pipe
• B -Equipment -Meeh
• B -Exterior Sheathing It -DS -07
• B -Shear Nailing
• B -Height Verification
• B -Framing
• B -Wall Insulation/Caulk
• B -Floor Insulation/Caulk
• B -Ceiling Insulation/Caulk
• B-Sheetrock Nail
• B -Plumbing Final
• B -Mechanical Final
• B -Building Final
• Landscaping & Planning Final Inspection
•
5/13/2011 10:44:31 AM Page 1 of 3
Inspection
Comments
- BLD20060573
6 - Apartment/Condo New
F'2 E: Mf
Applied:
Issued: 10/18/2007
Expires:
10/18/2008
Address: 23711 84TH AVE W, EDMONDS
INSPECTION
DATE.
INSPECTOR
ACTION
1106 - B -Setbacks
05/17/2007
Snook
CMP
Comment: APPROVED PER STRUNG
PROPERTY LINES.
1108 - B -Footings
05/17/2007
Snook
CMP
Comment: APPROVED
1110 - B -Foundation Wall
07/30/2007
Readwin
INC
Comment: WROTE CORRECTION. NEED
SPECIAL INSPECTION REPORTS. NOT APPROVED TO POUR.
1110 - B -Foundation Wall
08/06/2007
Readwin
CMP
Comment: APPROVED-REC'D SPECIAL INSPECTION REPORTS
1118 - B -Slab Insulation
09/19/2007
TEMP-NATOLA
CMP
Comment: APPROVED
1120 - B -Plumb Ground Work
09/18/2007
Readwin
CMP
Comment: APPROVED
1126 - B -Plumb Rough In
01/11/2008
Ostheller
INC
Comment: No access.
1126 - B -Plumb Rough In
01/15/2008
TEMP-NATOLA
CMP
Comment: APPROVED
1128 - B -Gas Test/Pipe
01/11/2008
Ostheller
INC
Comment: No access.
1128 - B -Gas Test/Pipe
01/15/2008
TEMP-NATOLA
CMP
Comment: APPROVED
1130 - B-Equipment-Mech
02/07/2011
HARRISON
COM
Comment: SEE BLD201110074.
1130 - B-Equipment-Mech
05/12/2011
STEINIKE
CMP
Comment:
1132 - B -Exterior Sheathing
10/30/2007
Readwin
INC
Comment: NOT READY
1132 - B -Exterior Sheathing
11/05/2007
TEMP-NATOLA
CMP
Comment: APPROVED
1136 - B -Shear Nailing
02/26/2008
TEMP-NATOLA
CMP
Comment: APPROVED
1140 - B -Height Verification
02/26/2008
TEMP-NATOLA
INC
Comment: OVER HEIGHT.
1140 - B -Height Verification
03/03/2008
Readwin
INC
Comment: MET WITH CONTRACTOR.
RE -CHECKED HEIGHT. STILL OVER.
5/13/2011 10:44:31 AM Page 1 of 3
INSPECTION
DATE
INSPECTOR
ACTION
1140 - B -Height Verification
10/22/2009
steinike
CMP
Comment:
1142 - B -Framing
02/26/2008
TEMP-NATOLA
INC
Comment: APPROVED PENDING HEIGHT CORRECTION AND WELDING SPECIAL INSPECTION REPORT.
1142 - B -Framing
02/27/2008
Readwin
CMP
Comment: PER CONTRACTOR ALL WELDING WAS SHOP WELDED -NO
ONSITE. ONLY HEIGHT
NEEDS TO
BE RESOLVED.
1144 - 13 -Wall Insulation/Caulk
10/27/2008
steinike
INC
Comment: Wrote Correction.
1144 - 13 -Wall Insulation/Caulk
10/22/2009
steinike
INC
Comment: Wrote Correction notice.
1144 - 13 -Wall Insulation/Caulk
10/27/2009
steinike
CMP
Comment:
1146 - B -Floor Insulation/Caulk
01/15/2008
Readwin
CMP
Comment: EXTERIOR CANTILEVER FLOOR INSULATION APPROVED
1148 - B -Ceiling Insulation/Caulk
10127/2009
steinike
CMP
Comment:
1150 - B-Sheetrock Nail
10103/2007
TEMP-NATOLA
INC
Comment: FIRST FLOOR PARTY WALL ONLY
1150 - B-Sheetrock Nail
1011012007
Readwin
INC
Comment: SECOND FLOOR PARTY WALL ONLY
1150 - B-Sheetrock Nail
10/19/2007
Readwin
INC
Comment: 3RD FLOOR PARTY WALL ONLY
1150 - B-Sheetrock Nail
10/23/2007
Readwin
INC
Comment: PARTY WALL AT ROOF ONLY
1150 - B-Sheetrock Nail
11/23/2009
steinike
CMP
Comment:
1152 - B -Plumbing Final
02/07/2011
HARRISON
COM
Comment: SEE BLD20110074.
1152 - B -Plumbing Final
05/12/2011
STEINIKE
CMP
Comment:
1156 - B -Mechanical Final
02/07/2011
HARRISON
COM
Comment: SEE BLD20110074.
1156 - B -Mechanical Final
05/12/2011
STEINIKE
CMP
Comment:
1158 - B -Building Final
02/0312010
steinike
INC
Comment: Wrote correction notice!
1158 - B -Building Final
02/07/2011
HARRISON
COM
Comment: SEE BLD20110074.
5/13/2011 10:44:31 AM Page 2 of 3
5/13/2011 10:44:31 AM Page 3 of 3
INSPECTION
DATE
INSPECTOR
ACTION
1158 - B -Building Final
05/12/2011
STEINIKE
CMP
Comment:
1985 - F -Fire Final
02/04/2010
SMITHM
CMP
Comment: APPROVED
2000 - Landscaping & Planning Final Inspection
02/07/2011
HARRISON
COM
Comment: SEE BLD20110074.
2000 - Landscaping & Planning Final Inspection
05/12/2011
COCCIA
CMP
Comment: OK.
5/13/2011 10:44:31 AM Page 3 of 3