Loading...
BLD20060573A.pdfOV EnM IIII�IIII o CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 enc. 1 So i STATUS: ISSUED Expiration Date: 10/18/2 r- - Permit$#: BLD20 Parcel No: 00451900101202 PROPERTYONNINER APPLICANT CONTRACTOR 84TH AVE 3 UNIT APARTMENT PACIFIC HOMES DEVELOPMENT LLC PACIFIC HOMES DEVELOPMENT LLC 11511 39TH AVE SE 2400 NW 80TH ST 2400 NW 80TH ST EVERETT, WA 98208 SEATTLE, WA 98177 SEATTLE, WA 98117 206-571-5978 206-571-5978 LICENSE #: PACIFHD975P7 EXP:12/20/2007 O' TRIPLEX VALUATION: $449,462 1KNICAINFLETE— UElm PERMIT TYPE: Commercial PERMIT GROUP: 6 - Apartment/Condo New GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: VB RETAININGWALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2003 OTHER: N ------- OT HERDESC: ZONE: RM -1.5 NUMBER OF STORIES: 3 VESTED DATE: NUMBER OF DWELLING UNITS: 3 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 493 1 ST FLOOR: 1917 2ND FLOOR: 1939 3RD FLOOR: 0 GARAGE: 0 DECK. 0 OTHER 0 PRD FLOOR 0 GARAGE: 1 130 DECK 0 OTHER: 0 I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. RS P [ON NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. YA!S m If e Sod x -11p-oft-k- /' Signature Print Name Date Released By Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. ARCHIVE = APPLICANT = ASSESSOR = OTHER STATUS: ISSUED BLD20060573 CONDITIONS • REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: 1) FIELD WELDING 2) PLACEMENT OF FILL AND COMPACTION 3) SOIL BEARING VERIFICATION 4) PROOF ROLLING 5) FOOTING DRAIN INSTALLATION • Lot line stakes must be in place at the time of foundation/setback inspection. • Installation, use and maintenance of per manufacturerd equipment and components shall be per manufacturer's specifications, installations instructions, and applicable state codes. Provide manufacturer's information on site for Building Inspector. • Approval of this foundation design is conditional subject to inspection of existing site soil conditions. Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation systemoperation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Maximum Height 25 feet. Measured from average elevation of undisturbed soil at comers of extended building rectangle. Subject to field check by building department. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Type B or L vent connectors required on fuel-buming appliances passing through unheated spaces. Per IMC 803.2 • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one and two-family dwellings. • Any request for the modification, variance or other administrative deviation (hereinafter "variance") must be specifically called out and identified. Approval of any plat or plan containing provisions which do not comply with City code and for which a variance has not been specifically identified, request and considered by the appropriate City official in accordance with the appropriate provision of City code or State law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT. SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 FNGINI]MING (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 1 PUBLIC WORKS 425 771-0235 1 PRE TREATMENT (425)672-5755 1 RECYCLING 425 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested. Contact Name and Phone Number, Date Prefereed, andwhether you prefer mornine or afternoon. 4iiVO4,t*41074 � • B -Setbacks • B -Footings • B -Foundation Wall • B -Foundation Drainage • B -Slab Insulation • B -Plumb Ground Work • B -First Floor Framing • B -Plumb Rough In • B -Cas Test/Pipe • B -Equipment -Meeh • B -Exterior Sheathing It -DS -07 • B -Shear Nailing • B -Height Verification • B -Framing • B -Wall Insulation/Caulk • B -Floor Insulation/Caulk • B -Ceiling Insulation/Caulk • B-Sheetrock Nail • B -Plumbing Final • B -Mechanical Final • B -Building Final • Landscaping & Planning Final Inspection • 5/13/2011 10:44:31 AM Page 1 of 3 Inspection Comments - BLD20060573 6 - Apartment/Condo New F'2 E: Mf Applied: Issued: 10/18/2007 Expires: 10/18/2008 Address: 23711 84TH AVE W, EDMONDS INSPECTION DATE. INSPECTOR ACTION 1106 - B -Setbacks 05/17/2007 Snook CMP Comment: APPROVED PER STRUNG PROPERTY LINES. 1108 - B -Footings 05/17/2007 Snook CMP Comment: APPROVED 1110 - B -Foundation Wall 07/30/2007 Readwin INC Comment: WROTE CORRECTION. NEED SPECIAL INSPECTION REPORTS. NOT APPROVED TO POUR. 1110 - B -Foundation Wall 08/06/2007 Readwin CMP Comment: APPROVED-REC'D SPECIAL INSPECTION REPORTS 1118 - B -Slab Insulation 09/19/2007 TEMP-NATOLA CMP Comment: APPROVED 1120 - B -Plumb Ground Work 09/18/2007 Readwin CMP Comment: APPROVED 1126 - B -Plumb Rough In 01/11/2008 Ostheller INC Comment: No access. 1126 - B -Plumb Rough In 01/15/2008 TEMP-NATOLA CMP Comment: APPROVED 1128 - B -Gas Test/Pipe 01/11/2008 Ostheller INC Comment: No access. 1128 - B -Gas Test/Pipe 01/15/2008 TEMP-NATOLA CMP Comment: APPROVED 1130 - B-Equipment-Mech 02/07/2011 HARRISON COM Comment: SEE BLD201110074. 1130 - B-Equipment-Mech 05/12/2011 STEINIKE CMP Comment: 1132 - B -Exterior Sheathing 10/30/2007 Readwin INC Comment: NOT READY 1132 - B -Exterior Sheathing 11/05/2007 TEMP-NATOLA CMP Comment: APPROVED 1136 - B -Shear Nailing 02/26/2008 TEMP-NATOLA CMP Comment: APPROVED 1140 - B -Height Verification 02/26/2008 TEMP-NATOLA INC Comment: OVER HEIGHT. 1140 - B -Height Verification 03/03/2008 Readwin INC Comment: MET WITH CONTRACTOR. RE -CHECKED HEIGHT. STILL OVER. 5/13/2011 10:44:31 AM Page 1 of 3 INSPECTION DATE INSPECTOR ACTION 1140 - B -Height Verification 10/22/2009 steinike CMP Comment: 1142 - B -Framing 02/26/2008 TEMP-NATOLA INC Comment: APPROVED PENDING HEIGHT CORRECTION AND WELDING SPECIAL INSPECTION REPORT. 1142 - B -Framing 02/27/2008 Readwin CMP Comment: PER CONTRACTOR ALL WELDING WAS SHOP WELDED -NO ONSITE. ONLY HEIGHT NEEDS TO BE RESOLVED. 1144 - 13 -Wall Insulation/Caulk 10/27/2008 steinike INC Comment: Wrote Correction. 1144 - 13 -Wall Insulation/Caulk 10/22/2009 steinike INC Comment: Wrote Correction notice. 1144 - 13 -Wall Insulation/Caulk 10/27/2009 steinike CMP Comment: 1146 - B -Floor Insulation/Caulk 01/15/2008 Readwin CMP Comment: EXTERIOR CANTILEVER FLOOR INSULATION APPROVED 1148 - B -Ceiling Insulation/Caulk 10127/2009 steinike CMP Comment: 1150 - B-Sheetrock Nail 10103/2007 TEMP-NATOLA INC Comment: FIRST FLOOR PARTY WALL ONLY 1150 - B-Sheetrock Nail 1011012007 Readwin INC Comment: SECOND FLOOR PARTY WALL ONLY 1150 - B-Sheetrock Nail 10/19/2007 Readwin INC Comment: 3RD FLOOR PARTY WALL ONLY 1150 - B-Sheetrock Nail 10/23/2007 Readwin INC Comment: PARTY WALL AT ROOF ONLY 1150 - B-Sheetrock Nail 11/23/2009 steinike CMP Comment: 1152 - B -Plumbing Final 02/07/2011 HARRISON COM Comment: SEE BLD20110074. 1152 - B -Plumbing Final 05/12/2011 STEINIKE CMP Comment: 1156 - B -Mechanical Final 02/07/2011 HARRISON COM Comment: SEE BLD20110074. 1156 - B -Mechanical Final 05/12/2011 STEINIKE CMP Comment: 1158 - B -Building Final 02/0312010 steinike INC Comment: Wrote correction notice! 1158 - B -Building Final 02/07/2011 HARRISON COM Comment: SEE BLD20110074. 5/13/2011 10:44:31 AM Page 2 of 3 5/13/2011 10:44:31 AM Page 3 of 3 INSPECTION DATE INSPECTOR ACTION 1158 - B -Building Final 05/12/2011 STEINIKE CMP Comment: 1985 - F -Fire Final 02/04/2010 SMITHM CMP Comment: APPROVED 2000 - Landscaping & Planning Final Inspection 02/07/2011 HARRISON COM Comment: SEE BLD20110074. 2000 - Landscaping & Planning Final Inspection 05/12/2011 COCCIA CMP Comment: OK. 5/13/2011 10:44:31 AM Page 3 of 3