Loading...
BLD20060982.doc City of Edmonds Plan Review Corrections Plan Check #: Date: BLD20060982 September 12, 2006 th Project Name/Address: Bill and Joan Martin / 16905 - 76 Avenue W. th Contact Person/Address: Joan Martin / e-mail: bil-mar@comcast.net; 16905 – 76 Avenue W., Edmonds, WA 98026 Reviewer Department : Meg Gruwell: Planning I have reviewed the above building permit application for the Planning Division. Before I can sign off on it I need the following: 1.Grading: Please confirm that less than 500 cubic yards will need to be excavated or brought in as fill for your project. 2.Retaining Wall: A retaining wall is shown on the east side of the house that veers into the setbacks. Could you please confirm that the retaining wall is less than three feet tall for the portion that curves to the east. 3.Edge of Roof and Eaves: Please show on the site plan the outline of the roofline, including all covered porches and covered decks. 4.Carport Roof: The carport is not shown on the building elevations or on the floor plans. Will its roof remain the same? 5.Carport Setback: The existing carport is shown at a six-foot setback to the rear property line. This would be acceptable for a detached structure less than 600 square feet in area. However, it appears to be attached and is being included within the height calculations. If the carport was constructed with the house in 1952 (Snohomish County Assessor’s records show the house to have been built in 1952), that would predate city zoning requiring setbacks. a.Please state if the carport was constructed at the same time as the house or if not, when it was added. b.Please also confirm if the carport is attached to the house. 6.Basement Floor Plan: I can see from the elevations that there is a basement to the house, but I do not see any basement floor plans. Please show at least rough floor plans showing rooms and their uses (bedrooms, bathrooms, etc.) for the basement. 7.Height Calculations: a.Datum Point: Normally we want something that cannot move for a datum point. Please state if the base of the power pole is in concrete or in dirt. b.Topography: The plot plan states “topo per city map” but when I look at the topography map in the file of the LIDAR topography lines, which I believe you were given, , it shows several more DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____ topography lines than shown on the plot plan. For instance, the northwest corner of the house is between elevation lines 200 and 202. Please show the topography lines as shown on the LIDAR map if you are relying on the LIDAR map for topography. (Note that if you have determined the corner elevations by some method other than using the city topography map, you should state that.) c.The height calculation rectangle needs to be expanded to include the posts for the covered deck and posts for the covered porch on the west side. Once it has been expanded, determine the new elevations for the four corners. d.After the above changes have been made, recalculate average grade and maximum allowed grade and show on the plot plans. e.On the building elevations show the revised average grade, maximum grade and actual elevation. Be sure to carefully measure. Be sure the numbers on the elevations match the plot plans. If you have any questions, please call me at (425) 771-0220, extension 1330. Please make all submittals to the Development Services Permit Coordinator, and provide two copies of any revised plans or elevations and three copies of any site plans. Your existing plans and elevations may also be red-lined. Thank you. DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____