Loading...
BLD20061047.doc City of Edmonds Plan Review Corrections Plan Check #: Date: BLD20061047 September 29, 2006 th Project Name/Address: Dave Elkins / 9805 – 234 St. SW Contact Person/Address: Kristin Hanson / Fax: (425) 771-3152; e-mail: hansondesign@hotmail.com Reviewer Department : Meg Gruwell: Planning I have reviewed the above building permit application for the Planning Division. Before I can sign off on it I need the following: 1.Height Calculations: a.Per the height calculation handout and the code referring only to “buildings,” uncovered decks are excluded from the height calculation rectangle. Please revise your height calculations as follows: (i)Shrink the height calculation rectangle so that points A and D line up with the wall of the new addition and modify their elevations as needed. (ii)Recalculate the height calculations as needed, including average grade and maximum allowed height. (iii)Make changes to the height calculations on the building elevations as needed. b.The datum point should be a point that cannot be changed easily and will not be moved with construction. If the bottom of the telephone pole is not in concrete, please choose a point that is more permanent. Also, after discussing with the inspector, since the addition is at the rear of the house, a datum point at the rear of the house would be convenient. If the landing for the garage door to remain will not be disturbed with the construction, then you could use a point on that as your datum point (i.e.: Northwest corner of the landing for the northern basement door on the west side of the house @ 96.5 feet) (i)Please provide a datum point that is a permanent point of reference. 2.Reduced Site Plans: Please provide a reduced site plan at 1 inch = 20 feet scale that fits on an 8.5 by 11 inch sheet. This helps us when we microfiche records. If you have any questions, please call me at (425) 771-0220, extension 1330. Please make all submittals to the Development Services Permit Coordinator, and provide two copies of any revised plans or elevations and three copies of any site plans. Your existing plans and elevations may also be red-lined. Thank you. DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____ DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____