Loading...
bld20061242 greenberg plumbg.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Comments Plan Check : Date: # 20061242 27 06 nd Project Name/Address: Greenberg: 155 2 Ave W Contact Person/Address/Fax: fax : : Reviewer: Division:Engineering Lyle Chrisman, Engineering Program Manager The subject application has been reviewed but cannot be completed until the following items have been addressed/corrected. Please resubmit 3 sets of revised drawings to a Development Services Permit Coordinator. 1.Provide a scaled plan view drawing of the plumbing plan. Drawing needs to show where the garage floor drain (oil/water separator) connects to the sewer line and the sewer line connection to the lateral. 2.Provide invert elevation of sewer connection to the main and at the building. Show a clean out at the building. Cleanout shall have a 12” locking lamphole cover. Plumbing plan should include the civil utility drawing. 3.The sewer lateral from the main to the building property line shall b 6”. 4.Show location or rpba and double check detector assembly location on the site plan. __________________(Attach fax transmittal) DATE FAXED PAGE ____ OF ___ C:\\Users\\cockrum\\AppData\\Local\\Temp\\bld20061242 greenberg plumbg.doc_154020\\bld20061242 greenberg plumbg.doc