Loading...
BLD20070018 - PERMIT AND INSP RECORDS.pdf• OF ED& - "° CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 1/16/2008 Expiration Date: 1/16/20 Parcel No: 27032600102600 fl POINT EDWARDSI�;YUNIT CONDO 2801 ALASKAN WAY STE 107 SEATTLE, WA 98121 WEBER& THOMPSON 425 PONTIURSNE SEATTLE, WA 98109 206-344-5700 Permit #: BLD200700181 Project^ Address_: 45PINE _ ST, �EDMONDS CONSTRUCT A NEW�UNIT CONDOMINIUM WITH PARKINGGARAGE. VALUATION: $5,471,559 POINT EDWARDS LLC 2801 ALASKAN WAY STE 107 SEATTLE, WA 98121 206-374-0414 LICENSE #: POINTE)9432CN EXP:2/13/2008 COMPLETED PERMIT TYPE: Commercial PERMIT GROUP: 6 - Apartment/Condo New GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: VA RETAINING WALL ROCKERY: N OCCUPANT GROUP: R2, S2, SI OCCUPANT LOAD: 385 FENCE: N ( 0 X 0 FT.) CODE: 2003 OTHER: N ------- OTHER DESC: ZONE: MPI NUMBER OF STORIES: 4 VESTED DATE: NUMBER OF DWELLING UNITS: 32 BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 IST FLOOR: 17670 2ND FLOOR: 21158 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 19543 GARAGE: 18770 DECK: 3458 OTHER: 0 REQUIRED: 15' PROPOSED: 15' REQUIRED: 10' PROPOSED: 10' REQUIRED: 15' PROPOSED: 15' HEIGHT ALLOWEDA0 PROPOSED:37.83 REQUIRED: 10' PROPOSED: 10' SETBACK NOTES: SETBACKS APPLY TO ENTIRE DEVELOPMENT. 1 AGREE TO COMPLY WITH CITY AND SPATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THISAPPLICATION ISNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HE"EPUTY AND ALL FEESARE PAID. MOWN Wfn/51 Signature r ( Print Name IF Date Released By ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBCI09/ IBCI 10/ IRCI 10. ARCHIVE APPLICANT ASSESSOR OTHER STATUS: ISSUED BLD20070018 CONDITIONS Seperate Pennit Required For: 1) Plumbing 2) Mechanical 3) Fire Connection 4) Fire Sprinkler 5) Fire Alarm 6) Fire Stopping 7) Shop Drawings (See Sheet S1.1) 8) Wood Tie -Down System 9) Side Sewer 10) Water Meter 11) Irrigation 12) State Electrical 13) State Elevator 14) Fire Protection Footprint 15) Life -safety plan/Emergency Guide 16) Building Enclosure Certification Letter 17) Maintenance Bonds • REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: 1) Excavation, grading, & site preparation 2) Shoring Installation and Monitoring 3) Soil bearing verification 4) Placement of fill & compaction 5) Retaining Wall Construction and Drainage 6) Footing drain 7) See Sheet SLI for Structural Special Inspections 8) Structural Observation (By SE of record) 9) Final Special Inspection letters from all special inspectors • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised— if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT. SEE ECDC 19.00.005(A)(6) A00 700 If sorop BUILDING (425) 771-0220 EXT. 1333 ENGINEERING (425) 771-0220 EXT. 1326 1 FRE (425) 771-0215 PUBLIC WORKS (425) 771-0235 1 PR&TREATMENT (425) 672-5755 1 RECYCLING (425) 2754801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Erosion Control/Mobilization • E -Storm Tightline • &Sewer Lateral/Main Inspection • 11Sewer Lateral/Main Pressure Test • &Water Service Line • &Double Check Detector Assem Vault • E -Engineering Final • B -Setbacks • B -Footings • B -Foundation Wall • B -Isolated Footings/Piers • 13 -Retaining Wall • B -Slab Insulation • B -First Floor Framing • B-Equipment-Mech • B-Fxerior Sheathing • B -Shear Nailing • B -Height Verification • B -Framing • B-WallInsulation/Caulk • B -Floor Insulation/Caulk • B -Ceiling Insulation/Caulk • B-Sheetrock Nail • 13 -Building Final • F-Edinguishers F -Fire Dept Inspection • F -Addressing Visibility • F -Fire Final • P -Planning Final 07019 iiiiie Inspection Comments BLD20070018 6 - Apartment/Condo New PERMITTRAX Applied: 01/08/2007 Issued: 01/16/2009 Address: 45 PINE ST, EDMONDS iID. ' 'DATE INSPECTOR ACTION COMMENT 1001 - E -Erosion Control/Mobilization 02/08/2011 MCCONNELL CMP Project finaled. 1013 - E -Storm Tightline Expires: 03/16/2011 11/01/2007 SIBREL CMP Okay to backfill. Some storm water routes through the building and was inspected under bld2007O622. 1025 - E -Sewer Lateral/Main Inspection 01/12/2011 MCCONNELL CMP 1026 - E -Sewer Lateral/Main Pressure Test 01/12/2011 MCCONNELL CMP 1034 - E -Water Service Line 02/08/2011 MCCONNELL CMP 1036 - E -Double Check Detector Assem Vault 01/12/2011 MCCONNELL CMP 1076 - E -Cross Connection Final 01/10/2011 MCMURPHY CMP 1077 - E -Engineering Final 01/11/2011 MCCONNELL COM 02/08/2011 MCCONNELL CMP 1106 - B -Setbacks 01/07/2011 LAWLER CMP 1108 - B -Footings 01/07/2011 LAWLER CMP 1110 - B -Foundation Wall 01/07/2011 LAWLER CMP 1114 - B -Isolated Footings/Piers 01/07/2011 LAWLER CMP 1116 - 13 -Retaining Wall 01/07/2011 LAWLER CMP 1124 - B -Pre -Rock (Beam/Col Wrap, Shafts) 08/12/2010 BJORBACK INC 08/16/2010 LAWLER INC 10/18/2010 LAWLER CMP 12/10/2010 STEINIKE CMP 1132 - B -Exterior Sheathing 08/06/2010 LAWLER CMP 1134 - B -Exterior Gypsum Sheathing 08/06/2010 LAWLER INC 08/06/2010 LAWLER CMP 1136 - B -Shear Nailing See eng20070047 for inspection results. See eng20070047 for inspection results. Approved. Okay to final per Linda McMurphy and Mike Smith. signed off Final inspection performed, corrections required. See attached e-mail communication dated 1/12/11. Approved. See BLD200601344 See BLD200601344 See BLD200601344 See BLD200601344 See BLD200601343 Various areas of the building. LB Preliminary to prerock, approval to isolate toilet supply line with 2 layers gyp. Ok to Insulate garage all fire blocking approved here. exterior walls approved 3/11/2011 1:44:11 PM Page 1 of 3 IQ� _ 67A_ E Z7 INSPECTOR,l *--'—A CTION4 ' COMMENT �• 01/08/2010 lawler INC _ Partial approval of shearwall nailing at (3) Stairwell walls at the L1 level. Okay to cover with Gyp. A note was left to bring attention to the hold-down bolt out of wall alignment. 05/07/2010 steinike INC Exterior Non-Shear nailing ok for west wall at north end only! 06/14/2010 steinike INC Check Specical Inspection reports. 07/13/2010 LAWLER INC walk through 08/02/2010 BJORBACK INC Top 2' of nailing of 2W4 wall at L1 corridor. 02/09/2011 HARRISON COM SEE BLD20110036 03/11/2011 LAWLER CMP approved 7/18/10 1140 - B-Height Verification 01/14/2011 STEINIKE CMP Received letter. 1142 - B-Framing 07/30/2010 BJORBACK INC Pre rock at fire places in 4 units. 08/02/2010 BJORBACK INC Elevator shaft OK to gyp. 08/06/2010 LAWLER INC deck framing 109/209 08/16/2010 LAWLER INC multiple deck framing approved, see onsite notes for specifics. 08/24/2010 LAWLER INC units 106, 107, 108, 109 approved 08/26/2010 LAWLER INC units 101-105 09/01/2010 LAWLER INC 1st floor corridor metal ceiling framing and firestopping 09/03/2010 LAWLER INC Units 201, 206-211 09/09/2010 LAWLER INC stairwell framing 09/10/2010 BJORBACK INC Correction notice on units 202-205 09/15/2010 BJORBACK INC Units 201-205; L2 corridor dropped lid OK 09/20/2010 BJORBACK INC Dropped lids at 106-109 09/24/2010 LAWLER INC 306-310 09/27/2010 LAWLER INC dropped ceilings 101-105 10/04/2010 LAWLER INC units 301-305 10/07/2010 LAWLER INC ceiling framing units 206-211, corridors 3rd floor okay to insulate ceiling 10/18/2010 LAWLER PAR ceilings and firestopping units 201-205 10/27/2010 LAWLER PAR ceiling framing units 306-310 11/04/2010 LAWLER PAR ceiling 301-305 11/16/2010 LAWLER CMP 1144 - B-Wall Insulation/Caulk 08/02/2010 BJORBACK INC Elevator shaft OK to gyp. OK to pre-rock 4 fireplace alcoves. 08/26/2010 LAWLER INC units 106-109 09/01/2010 LAWLER INC units 101-105 09/09/2010 LAWLER INC units 206,207,210,211 09/15/2010 BJORBACK INC Units 201-205, 209 10/01/2010 LAWLER INC units 306-310 10/07/2010 LAWLER INC units 301-305 10/12/2010 LAWLER CMP 1146 - B-Floor Insulation/Caulk 08/17/2010 LAWLER INC exterior decks that were approved 8-15-10 for framing are insulated and approved for cover. 01/14/2011 STEINIKE CMP 1148 - B-Ceiling Insulation/Caulk 10/12/2010 LAWLER PAR 3rd floor corridor 3/11/2011 1:44:11 PM Page 2 of 3 D DATE INSPECTOR ACTION COMMENT 11/12/2010 LAWLER CMP 1150 - B-Sheetrock Nail 07/13/2010 LAWLER INC walk through info 07/19/2010 LAWLER INC partial approval 2 layers unit #308 horizontal rooftop hvac chase, left notice 08/04/2010 LAWLER INC partial approval 2nd layer 3rd story elevator shaft 09/01/2010 LAWLER INC units 106-109 envelope drywall 09/09/2010 LAWLER INC units 101-105 envelope drywall 09/20/2010 BJORBACK INC Nailing OK except at W14 party walls @ units 206-208, 210-211. 09/23/2010 LAWLER INC 1st level complete, units 201, 205-211 09/27/2010 LAWLER INC units 202-204, except for dropped ceilings 10/12/2010 LAWLER PAR 306-310 10/18/2010 LAWLER COM units 301-305 envelope 12/10/2010 LAWLER CMP 1158 - B-Building Final 01/06/2011 STEINIKE COM Preliminary Walk through with Lonnie. 01/13/2011 BJORBACK COM Leonard and Leif walk thru with Bruce Moe prior to permit expiration to help determine remaining work to be done and how to set up a new supplemental permit to complete the project. 02/09/2011 HARRISON COM SEE BLD20110036 03/08/2011 STEINIKE COM 1st Level Ok pending Elevator and Fire Dept. 03/09/2011 STEINIKE COM 2nd level approved pending fire and elevator finals. 03/10/2011 STEINIKE CMP finaled 1955 - F-Extinguishers 02/09/2011 HARRISON COM SEE BLD20110036 03/10/2011 SMITHM CMP APPROVED 1975 - F-Fire Dept Inspection 02/09/2011 HARRISON COM SEE BLD20110036 03/10/2011 SMITHM CMP APPROVED 1980 - F-Addressing Visibility 02/09/2011 HARRISON COM SEE BLD20110036 03/10/2011 SMITHM CMP APPROVED 1985 - F-Fire Final 02/09/2011 HARRISON COM SEE BLD20110036 03/10/2011 SMITHM CMP APPROVED 2000 - P-Planning Final 12/20/2010 CLUGSTON CMP Installed landscaping matches revised plan approved 8/4/10 3/11/2011 1:44:11 PM Page 3 of 3