Loading...
BLD20070684 Columbia Rim 8128 240 St.doc MEMORANDUM Date:August 16, 2007 Development Services Lead Theresa Umbaugh To: From:Fire Marshal John J. Westfall 425.771.0213 Subject:BLD20070684 Columbia Rim Bldg 8128 240 St SW The following project has been evaluated under the 2003 International Codes and Edmonds Community Development Code. Site plan 1. Provide public fire hydrant along eastern approach to provide required 300’ street th spacing. Resubmit site plan showing hydrant north of property on 240 St and and include new installation 300’ to the east in accordance with ECDC 19.25.055D. Civils 2. Sheet 6 of 9: Deconflict area calculations and occupancy classification information with architectural plans throughout. 3. Sheet 9 of 9 Provide public fire hydrant along eastern approach to provide required th 300’ street spacing. Resubmit site plan showing hydrant north of property on 240 St and and include new installation 300’ to the east in accordance with ECDC 19.25.055D. 4. Sheet 9 of 9 Include COE standard hydrant detail (E7.1) detail information can be found on city website at the following address: http://www.ci.edmonds.wa.us/engr_dept.stm 5. Sheet 9 of 9 Remove all references to “sprinklers” and “not sprinklered”. If a structure is sprinklered, it shall be sprinklered throughout. Your group classifications (B, S2, U) and building design do not meet sprinkler system requirements. You are cautioned that changes to these classifications, design, or certain activities can lead to (building) fire sprinkler requirements, fire alarm requirements, or both. 6. Sheet 9 of 9 Identify detail E7.18 as called out on plan Architectural 7. I don’t understand a private garage in a commercial building conducting public business. Justify this classification. City of Edmonds Fire Marshal   8. Remove all references to “sprinklers” and “not sprinklered”. If a structure is sprinklered, it will be sprinklered throughout. Your group classifications (B, S2, U) and design arrangements do not meet sprinkler system requirement. You are cautioned that changes to these classifications and design can lead to tenant occupancy fire sprinkler or fire alarm requirements, or both. Tenant validation and requirements are deferred to City Business Licensing review follow construction of building. 9. General “S-2” classification does not indicate fire sprinkler or fire alarm requirements. Additional information you can provide regarding warehouse storage will be helpful for proper review and eliminate and last minute requirements when tenant is set to move in. Call out warehouse storage items, how they are packaged, how they are stacked, how high the storage will reach. 10. Delete all smoke alarms and references to “110 V smoke detectors interconnected” in LEGEND, notes, plans and elsewhere. If required (it is not currently) or desired, the fire alarm installation would be permitted and installed iaw NFPA 72. 11. Provide 2A:10B:C minimum rated portable fire extinguishers within 75’ travel distance to all building areas and levels. Special hazards, storage, & processes may require additional fire extinguishers or fire protection systems. 12. Sheets 7 of 16/8 of 16 Calculate total area of building and total occupant loads. 13. Sheet 5 of 16 Post approved building numbers in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their installed background. Address numbers shall be Arabic numerals or alphabet letters. 14. Add note: Provide Fire Department lockbox. Coordinate with Fire Department for a “Lockbox Authorization Letter” and instructions to obtain and install lockbox outside the sprinkler rooms on your site. 425.775.7720 15. During pre-application in May 2005 you indicated welding as an activity. If that is still valid call it out to be addressed now not later. Call out power source of welder(s), quantities of gases (if gas-fueled) and location(s) of use/storage. 16. During pre-application in May 2005 you indicated LPG powered forklifts. If that is still valid call out all locations where they will be stored and used and identify maximum quantity of LPG on site at any one time and location of storage. Cc: Applicant Mr. Al Ostman, fax 425 778-5265 Assistant Building Official Ann Bullis Engineering Technician Jeanie McConnell