Loading...
bld20080257_Sound Trans-Ed Station_209 West Dayton_2.pdf DATE: June 12, 2008 TO: Brian Vanderburg, P.E. KPFF Consulting Engineers Brian.Vanderburg@kpff.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application #: bld20080257 Project: Sound Transit – Edmonds Station Project Address: 209 West Dayton Street During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. Review 2 – June 12, 2008 Review 1 - April 22, 2008 GENERAL Thank you for providing the cost estimate. Please provide a separate breakdown for on- 1. site and off-site improvements. The estimate will be reviewed in further detail at the next submittal. Please provide an itemized cost estimate for both on-site and off-site (right-of-way) improvements, including traffic control. ok 2. ok 3. Response letter requests that the traffic control and haul route plans be deferred 4. submittals. Please submit the haul route plan at this time. It is preferred that the traffic control plan also be submitted and reviewed with the main permit so any potential conflicts can be addressed during the review phase instead of during the construction phase. However, the traffic control plan can be deferred, but the right-of-way permit for the project will not be issued until it has been reviewed and approved by the City. Please submit a traffic control and haul route plan for review and approval. Individual plans shall be provided for all elements of work to be completed on Main Street, Railroad Ave, West Dayton Street and James Street. The Lift Station #7 project involves installing new sanitary sewer main in West Dayton · Street, from the east side of SR-104 west to approximately the east side of BNSF property. The City will be utilizing much of James Street for staging. · The response letter states that trucks will be entering the site from West Dayton and · exiting onto Main Street. Sheet EDM-EC2 however states that all vehicles with mud or dirt on their tires are to exit at Dayton Street. Please submit a haul route plan consistent with the provisions provided within the erosion control plan. Truck access shall be limited to West Dayton Street to prevent conflicts with ferry traffic. It does not appear as though the plans were revised as the response letter indicates they 5. would be. A sequence of plan sheets have been provided showing Existing Conditions and subsequently those features that are to be Demolished. Throughout the remaining plan sheets however, some of the existing conditions that were to be demolished still appear and it makes it difficult to tell what the finished product will be and/or which elements are critical to each plan sheet. For clarity, please revise plan sheets so existing features, to be removed, are only shown where it provides critical information to the plan sheet. Stephan has not yet received the Subordination Agreement, please provide. 6. Please coordinate finalization of the Subordination Agreement through Stephan Clifton. Response letter states the relocated street lights are shown on the paving and horizontal 7. control plan, but they do not appear to be shown. Plans shall be revised to include street lighting relocation & replacement on Railroad Ave, near Main Street. Please revise the plans as needed and incorporate details consistent with the direction previously received from the City. STREET USE PERMIT – ENCROACHMENT PERMIT Reponse letter states the encroachment permit will be submitted by Sound Transit at a 1. later date. A Street Use Permit was submitted to allow for reconfiguration of a portion of the parking lot into the right-of-way and also for a sign at Sunset and James St. An Encroachment Permit is required for encroachment into the City right-of-way, not a Street Use Permit. Please submit an Encroachment Permit application and all required attachments. · You may reference Encroachment Permit handout #E26, available on the City website. · STORM DRAINAGE REPORT ok 1. ok 2. Sheet 6 - EDM-SV1 – EXISTING CONDITIONS AND SURVEY AFN # not noted on plans as requested. 1. Please identify City of Edmonds Utility Easement with AFN #200705010056. Sheet 9 - EDM-EC1 – TEMPORARY EROSION & SEDIMENT CONTROL Response states a 30’ diameter turnaround has been added to the drawings, but I do not 1. see it on this plan sheet. Also, it is noted that the hope is for construction traffic to travel south to north through the site with no need for a turnaround. The proposed route needs to have adequate erosion control measures to eliminate tracking of dirt and debris onto paved streets and/or storm systems. Please revise the plans accordingly. Bld20080257 Sound Transit Edmonds Station Page 2 of 5 The rock construction entrance shall be placed so as to provide an on-site turnaround within the rock pad. ok 2. EDM-EC2 – TEMPORARY EROSION & SEDIMENT CONTROL Please revise the sign shown on this sheet to simply indicate direction of travel for 1. construction vehicles versus stating specifically “vehicles with mud or dirt on their tires”. Sheet 12 - EDM-ECN1 – TEMPORARY EROSION & SEDIMENT CONTROL Plans were not revised as response letter states they will be. 1. It is assumed that the existing asphalt parking lot will not be removed immediately and therefore the rock construction entrance will not be installed at the beginning of the project. Please identify in the construction sequence the appropriate time to construct the rock entrance and wheel wash. 2.See next note, #3. Please revise. Note #1 shall be revised to also state: Call for all inspection 24 hours in advance at 425-771- 0220, ext. 1326. 3.ESC Notes verbatim from the ECDC were added, but the Construction Sequence notes were removed. Please revise. Erosion and Sedimentation Control notes, verbatim from ECDC 18.30.050, shall be added to this plan sheet. 4.Please refer to the attached ESC checklist and ensure compliance with those items marked as incomplete. It is understood that most of this information will be provided when the Construction Sequence notes are added back into the plan set. Please also provide a narrative on how much area is being disturbed and address the potential need for a sedimentation pond. Sheet 13 - EDM-DM1 – DEMOLITION PLAN ok 1. Sheet 16 - EDM-PV1 – PAVING AND HORIZONTAL CONTROL PLAN ok 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. Sheet 17 - EDM-PV2 – PAVING AND HORIZONTAL CONTROL PLAN ok 1. ok 2. Bld20080257 Sound Transit Edmonds Station Page 3 of 5 Sheet 18 - EDM-PV3 – PAVING AND HORIZONTAL CONTROL PLAN ok 1. ok 2. ok 3. ok 4. ok 5. Sheet 22 - EDM-GD1 – GRADING, DRAINAGE & UTILITY PLAN ok 1. ok 2. ok 3. Please provide an RPBA on the domestic service that supplies water to the box hydrants 4. on the east side of the tracks. Please revise the proposed 8” private water main as follows: 5. The City Fire Department is requiring the installation of 3 hydrants in conjunction a. with this project. One hydrant is to be located at the entrance off of West Dayton Street. The second hydrant should be located in the landscape island in the parking lot to the south of the Amtrak Building. The third hydrant should be located in the planter strip on the north side of James Street. The 8” water main should be a looped, public water system. Accordingly, Sound b. Transit would not be required to install a DCDA on the main line. Sound Transit would be responsible for constructing the water main to the northernmost fire hydrant at James Street. The City would complete the water system loop to Sunset under a separate capital improvement project. The domestic service that supplies water to the box hydrants on the east side of the c. railroad tracks could be tapped off of the new 8” water main instead of off the main in West Dayton Street. A meter and RPBA would still be required, but would be located at the edge of the easement instead of at the property line. A public water utility easement would need to be granted to the City of Edmonds for those 6. portions of the water main located on private property. Sheet 24 - EDM-GD3 – GRADING, DRAINAGE & UTILITY PLAN ok 1. ok 2. Please add surface flow directional arrows within the parking lot. 3. Sheet 25 - EDM-SDN1 – STORM DRAINAGE NOTES ok 1. ok 2. Sheet 28 - EDM-PS1 – STRIPING AND SIGNAGE PLAN The parking stall striping as shown along the west side of the parking lot scale out at 7’ 1. wide. Please revise striping to meet the required 8.5’ width. Show drive aisle and parking stall dimensions. As the pedestrian aisle in between the curbed landscape planters and the two one-way 2. drive aisles is large enough for a vehicle (it is 10’ wide), this area should also be striped to clearly indicate it is a pedestrian pathway. Bld20080257 Sound Transit Edmonds Station Page 4 of 5 Also, the stop bar is not necessary at the crosswalk as there is not stop sign provided here. Stripe pedestrian aisle between parking lots so it is clear the area is not intended for vehicles. ok 3. Please number the sign that is to be placed at the entrance off West Dayton Street. 4. Sheet 29 - EDM-PS2 – STRIPING AND SIGNAGE PLAN ok 1. ok 2. ok 3. Please remove sign #15 as shown on the west side of Railroad Ave. 4. Revise striping note #14 to state solid yellow curb, instead of solid red curb. 5. Sheet 30 - EDM-PS3 – STRIPING AND SIGNAGE PLAN ok 1. ok 2. ok 3. ok 4. EDM-SND1 – SIGNAGE DETAILS Sign #12 shall also be installed with W16-7p. Please revise plans to show the requirement 1. for this sign just below the pedestrian crossing sign W11-2. Sheet 31 - EDM-PD1 – STRIPING DETAILS Response letter states the detail was revised, but the detail appears to have been removed 1. from the drawing. Please update. Detail #4, yellow center lane stripe shall be per City standard detail E3.1.1. Please replace this detail with the City detail. Response letter states the detail was revised, but the detail appears to have been removed 2. from the drawing. Please update. Detail #8, Crosswalk detail, shall be per City standard detail E3.2. Please replace this detail with the City detail. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Bld20080257 Sound Transit Edmonds Station Page 5 of 5