DATE: January 14, 2010
TO: Andrea Clinkscales
Sound Transit
andrea.clinkscales@soundtransit.org
FROM: Jeanie McConnell, Engineering Program Manager
RE: Application #: bld20080257
Project: Sound Transit Edmonds Station REVISED SCOPE
Project Address: 209 West Dayton Street
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Marie Harrison.
City of Edmonds handouts and standard details can be referenced on the City website under
Development Services Department, Engineering Division.
Review 6 January 14, 2010
Review 5 December 1, 2009 - REVISED SCOPE, new comments
Previous reviews:
Review 4 November 17, 2008
Review 3 July 22, 2008
Review 2 June 12, 2008
Review 1 - April 22, 2008
GENERAL
1/14/10 Specs have been provided, but not referenced in the plan set. Please reference.
1.
12/1/09 - Add Scope of Work to plan set or refer to separate specs.
1/14/10 Specs have been provided, but not referenced in the plan set. Please reference.
2.
12/1/09 - Add General Construction Notes to plan set or refer to separate specs.
ok
3.
1/14/10 Response letter states Community Transit is addressing this item. To date,
4.
nothing has been received from Community Transit.
12/1/09 - Has CT conducted a traffic study at WSDOT intersection SR-104 @ Dayton to
potentially add LT Phasing for SB movement. Please coordinate with WSDOT.
ok
5.
ok
6.
EDM-A4.1 & A6.1 CANOPY WINDSCREEN PLAN & PLATFORM SHELTER DETAILS
ok
1.
EDM-A4.7 TRASH ENCLOSURE PLAN AND ELEVATIONS
1/14/10 Plan sheet A4.7 is not included in the plan set.
1.
12/1/09 - Please revise Detail 1 to show how gates will be held in the open position. Will insert
pipes be provided or alternate method?
DRAINAGE REPORT
ok
1.
ok
2.
ok
3.
EDM-SV1 Sheet 6 - Existing Conditions and Survey
ok
1.
ok
2.
ok
3.
ok
4.
EDM-EC1 Sheet 9 Temporary Erosion and Sediment Control
ok
1.
EDM-DM1 Sheet 14 Demolition Plan
ok
1.
ok
2.
ok
3.
EDM-DM2 Sheet 15 Demolition Plan
ok
1.
ok
2.
ok
3.
EDM-PV1 Sheet 17 Paving and Horizontal Control Plan
ok
1.
ok
2.
ok
3.
ok
4.
1/14/10 Please add a wheel stop to the northernmost parking stall on the west side of the
5.
parking lot.
12/1/09 - Please show all wheel stops that are to be located along the parking stalls adjacent to
pedestrian walkways.
1/14/10 Please note the canopy and windscreen reference as typical (typ).
6.
12/1/09 - Please reference to platform shelter details found within architectural plan set.
1/14/10 Please note this request is for removal and replacement of all temporary asphalt
7.
walkway, curb and gutter. These areas can easily be identified/quantified and the note
shouldnt cause problems for prospective bidders.
Bld20080257 Sound Transit Edmonds Station Page 2 of 7
12/1/09 - Please add a note to the plans that indicates all temporary asphalt walkway, curb and
gutter is to be removed and replaced with concrete walk, curb and gutter. It appears as though
the restoration boundaries might fall just short of encompassing the entire asphalt area.
ok
8.
ok
9.
ok
10.
EDM-PV2 Sheet 18 Paving and Horizontal Control Plan
ok
1.
EDM-PV3 Sheet 19 Paving and Horizontal Control Plan
1/14/10 Consistent with our discussions on 1/13/10, please revise plans to show sidewalk
1.
curb ramps that are necessary to transition the full height sidewalk to be flush with the
stained concrete driveway approach. Please see attached plan markup of what this could
look like.
12/1/09 - While it is not clear from this plan sheet if the stained concrete area is flush with the
driveable surface, it appears from Sheet 32-EDM-PS3 that it is.
a.A break in the curb is noted on the west side of the stained concrete, but curb ramps have
been provided to indicate a grade change from sidewalk to driveable surface. Please
revise accordingly.
b.It appears as though the curbing should wrap around the sidewalk areas. Please revise
accordingly.
ok
c.
ok
2.
1/14/10 Please note this request is for removal and replacement of all temporary asphalt
3.
walkway, curb and gutter. These areas can easily be identified/quantified and the note
shouldnt cause problems for prospective bidders.
12/1/09 - Please add a note to the plans that indicates all temporary asphalt walkway, curb and
gutter is to be removed and replaced with concrete walk, curb and gutter. It is difficult to tell if
the restoration boundaries encompass the entire asphalt area.
1/14/10 A few light pole locations are now in too close of proximity to the water main. In
4.
addition, light poles should not be located within the easement area. Please relocate
accordingly.
12/1/09 - Several light pole locations appear to be proposed over the top of existing utilities.
Please revise plans accordingly.
ok
5.
ok
6.
ok
7.
ok
8.
EDM-PVD1 Sheet 20 Paving Details
1/14/10 Comment not addressed.
1.
12/1/09 - Detail 2 ACP Trench Restoration Detail add note that ACP shall be 3 or match
existing if existing in ACP is greater than 3.
1/14/10 Comment not addressed.
2.
Bld20080257 Sound Transit Edmonds Station Page 3 of 7
12/1/09 Detail 3 - Please revise to indicate 95% compaction of subgrade consistent with City
standard detail E2.3.
1/14/10 - Detail 5 Revise ramp detail to call out 4 minimum landing at top of ramp.
3.
EDM-PVD3 Sheet 22 Paving Details
ok
1.
EDM-PVS1 Sheet 23 Cross Sections
ok
1.
EDM-GD1 Sheet 24 Grading, Drainage and Utility Plan
1/14/10 Please reference construction Note #11 at the 3-valve cluster in West Dayton.
1.
12/1/09 - Show the required thrust block at the T in the water main 3-valve cluster in West
Dayton.
ok
2.
ok
3.
ok
4.
1/14/10 Thank you for relocating the water main and identifying the easement area. It
5.
appears as though a few of the parking lot light posts are now located within the easement
area and the concrete bases are too close to the water main. Please refer to Sheet 19
comment #4 above.
12/1/09 - Please adjust the location of the water and storm mains as follows on Sheets 24, & 25:
a.The City would like a 15 easement for the water main. While the easement will not be
provided until after the main install, consistent with plan note #5, the storm line will
need to be located outside the easement area. Show the location of the future water main
easement on the plans and adjust water and storm locations as needed so the only utility
within the easement area is the water main.
b.Move water main to west of current proposed location to eliminate/avoid bends in the
line.
c.Move the storm main east as needed to provide separation from water main and reduce
the need for bends in the water main.
6.The plans indicate the water service line will be 1 ½ diameter, while construction note 4 states
the size of the service is 1. Is note 4 really a reference to the water meter? Please revise
accordingly and ensure water meter size is called out on the plans.
ok
7.
ok
8.
ok
9.
1/14/10 It appears as though an existing storm catch basin has not been accounted for in
10.
the vicinity of the new water service line, RPBA and storm CB #2 near West Dayton.
Please revise plans accordingly.
EDM-GD2 Sheet 25 Grading, Drainage and Utility Plan
1.Plans indicate boring of a steel casing pipe under the railroad track and into Railroad Ave.
a.What utility will be placed in the in the steel casing?
b.Will the utility be placed with this project or is it for future use?
Bld20080257 Sound Transit Edmonds Station Page 4 of 7
c.Please clarify the area shown to the west of the steel casing in Railroad Ave. Is this the
remaining trench section for the utility or is this a bore pit?
d.Where will equipment be staged for this work?
2.Add in-line valves to either both sides of the hydrant connection to the main line.
EDM-GD3 Sheet 26 Grading, Drainage and Utility Plan
ok
1.
ok
2.
ok
3.
ok
4.
ok
5.
ok
6.
ok
7.
1/14/10 I am currently checking with staff to see if a separate encroachment permit will
8.
be required for the private water service lines and backflow assembly located in Railroad
Street.
EDM-SDD2 - Sheet 29 Storm Drain and Utility Details
ok
1.
ok
2.
EDM-PS1 Sheet 30 Striping and Signage
1.ok
2.ok
3.ok
4.ok
1/14/10 Pay Box is still showing on this plan sheet.
5.
12/1/09 - Remove Pay Box (shown at entrance to parking lot) from this plan sheet.
1/14/10 Please add a wheel stop to the northernmost parking stall on the west side of the
6.
parking lot.
12/1/09 - Please show all wheel stops that are to be located along the parking stalls adjacent to
pedestrian walkways.
ok
7.
ok
8.
1/14/10 Revise cross walk striping to show solid lines, similar to that shown on Sheet 32-
9.
EDM-PSI
1/14/10 No parking signs are shown to be installed facing the pedestrian crosswalk
10.
located in the middle of the parking lot. As these signs will not be visible to vehicles, you
might consider painting the curb yellow instead.
EDM-PS2 Sheet 31 Striping and Signage
1/14/10 Thank you for adding the pavement striping, however, the striping is difficult to
1.
see. Please add a note that further brings attention to this striping.
Bld20080257 Sound Transit Edmonds Station Page 5 of 7
12/1/09 - Add pavement striping (just South of station) to better direct one-way traffic in both
the NB and SB directions. Striping should allow one-way traffic to continue around the parking
island as well as direct the two-way traffic heading south into the one-way lane.
1/14/10 Comment not addressed.
2.
12/1/09 - Rotate Do Not Enter Sign (Note 3) to properly face SB movement.
ok
3.
ok
4.
1/14/10 Revise cross walk and ADA access aisle striping to show solid lines, similar to
5.
that shown on Sheet 32-EDM-PSI
1/14/10 Striping has not been indicated for the ADA accessible path from the 3 ADA
6.
stalls shown north of the Amtrak building to the curb ramp. Please revise.
1/14/10 Add 20 of center line delineating northbound and southbound lanes on the
7.
south side of the James Street traffic circle.
1/14/10 - Add striping at James Street intersection approach (for northbound traffic and
8.
westbound traffic) indicating that vehicles shall yield. Striping of isosceles triangles shall
be as shown on page 3B 25 & 26 of 2003 MUTCD.
EDM-PS3 Sheet 32 Striping and Signage
1/14/10 Thank you for adding the stop sign. It appears as though a Right Turn Only
1.
sign is identified on this stop sign and the stop sign at the exit from Railroad onto Main
Street. The MUTCD does not allow for placement of additional signs on the same post as
a stop sign. Please revise accordingly.
12/1/09 - Add Stop Sign to access Railroad Street heading west out of Skipper's parking lot.
ok
2.
ok
3.
1/14/10 Add 20 of centerline delineating westbound and eastbound lanes on the east side
4.
of the James Street traffic circle.
1/14/10 - Add striping at James Street intersection approach (for westbound traffic)
5.
indicating that vehicles shall yield. Striping of isosceles triangles shall be as shown on
page 3B 25 & 26 of 2003 MUTCD.
1/14/10 No parking along Railroad Street should just be indicated by yellow curb
6.
signage is redundant in this case. Please remove signage.
1/14/10 Please relocate the Do Not Enter sign, shown on the west side of Railroad Street
7.
near Main Street, so it is closer to the Main Street intersection. This sign will need to be
visible to traffic heading east on Main Street. Placing the sign in the concrete is acceptable
with a use of a unistrut post and sleeve.
EDM-PS4 Sheet 33 Striping Details
Please note on this plan set which details are provided in the spec book. Please add detail
1.
for striping of Yield indicators as required per comment #8/Sheet 31 above.
LANDSCAPE PLAN EDM-LO1 SHEET 74
1/14/10 Please remove crosswalk striping from crossing in between planter areas in
1.
middle of parking lot.
Bld20080257 Sound Transit Edmonds Station Page 6 of 7
LANDSCAPE PLAN EDM-LO2 SHEET 75
1/14/10 Show access aisle striping from ADA stalls to curb ramp.
1.
LANDSCAPE PLAN EDM-LO3 SHEET 78
ok
1.
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.