Loading...
bld20080263_Breske_drainage_1.pdf DATE: July 29, 2009 TO: Fred Breske fredbreske@gmail.com FROM: Jeanie McConnell, Engineering Program Manager RE: Plan Check #: BLD20080263 Project: Breske - SFR th Project Address: 9330 218 Pl SW In review of the drainage report and associated plans, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Theresa Umbaugh. GENERAL Please apply a correction factor to the measured infiltration rate to account for variation 1. in the measured infiltration rates (if any), effect of unregulated maintenance of the system, and natural clogging of the system. Correction factors have a minimum value of two (1992 Ecology manual) based on the aforementioned factors. (The design infiltration rate is equal to the measured rate divided by the correction factor.) Alternately, as included in the document but not used in the design, the Edmonds sizing equation can be use for the design of downspout infiltration systems only, using the average measured infiltration rate. A rain garden along the northern part of the site may be an alternative to consider for 2. roof and pavement runoff. This is an option and is not a requirement. Rain garden design should be per the Puget Sound Low impact Development Manual (2005). If designed and constructed correctly, this could be an amenity to boost the value of the property. DRAINAGE PLAN 1. Revise the construction sequence as follows: #1: revise to state engineering inspector instead of city engineer. #8: revise to include verbiage “once site has been permanently stabilized”. 2. It is unclear how the roof downspouts connect to the proposed infiltration system. Please revise plans to show the connection. 3. Please revise the drainage plan sheets per the attached redline markups. 4. Show location of water service line from the meter to the house. 5. Revise plans to show a 6” cleanout with 12” locking cast iron lamphole cover on the right-of-way side of the property line. DRAINAGE REPORT Please find attached a Storm Water Management Review Checklist with plan review 1. comments. A copy of the drainage report with redline markups is also attached for your reference. 2. Please contact me at 425-771-0220 or by e-mail at collinsj@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Page 2 of 2