bld20080287-Jantz-Revision-E1.pdf
DATE: August 13, 2010
TO: Warren Lafon
warrenlafon@earthlink.net
FROM: Jeanie McConnell, Engineering Program Manager
RE: Application #: bld20080287
Project: Jantz full revision
Project Address: 547 Dayton Street
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Theresa Umbaugh.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
1.Please clarify the intent of the storm drainage revision. I had understood that the existing
detention system was going to be cut short to account for this a new section of detention pipe
would be added. The revised plans show the large pipe section shifted, but not shortened in
length. Please provide information on the existing detention system, including system capacity,
pipe size, material & length. In addition, indicate on the plans how the existing system will be
modified how much of what size pipe will removed, etc.
2.It is also my understanding that the existing sanitary sewer line does not exist as shown on the
plans. Please accurately show the location of existing sanitary sewer line and confirm the
proposed storm revisions do not create a conflict.
Please contact me at 425-771-0220 or by e-mail at
mcconnell@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.
bld20080287-Jantz-Revision-E1 Page 1 of 1