Loading...
BLD20080464.pdf• • 11111111 OF 1..04, CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS.WA 98020 2q r. I R90 PIIORE 14251771.0220 -FAX 14 2 51 771-0221 STATUS: ISSUED 1/30/2009 p e m Permit k: BLD2 Expiration Date: 1/30/26W i Project Address: 123 SUNSET AVE N, EDMOND Parcel No: 00434401 J0030gla— _ w SUNSET 100 LP SUNSEr 100 LP 16118 72ND AVE W 16118 72ND AVE W Martin Construction 19929 108th Ave SE EDMONDS, WA 98026 EDMONDS, WA 98026 Snohomish, WA 98296 206-948-1195 206-948-1195 MARTIC'890MH 7/8/13 ENEEMMMUL- TWO-UNIT CONDOM ONIUM. SEE BLD20080463 FOR PARKING GA RACE AND SITE IMPROVEMENTS COMPKETE VALUATION: $457,180 PERMIT TYPE Commercial PERMIT GROUP 6 - Apartment/Condo New GRADING N CYDS 0 IYPEOFCONSTRUCTION. VII RETAINING WALL ROCKERY- N OCCUPANT GROUP- R3 OCCUPANT LOAD 23 FENCE N ( 0 X 0 FT I - CODE. 2006 OTHER N-------OTIIF.RDESC ZONE. NUMBER OF STORIES 2 VLSI I..0 DATE NUMBER OF DWELLING UNITS- 2 LOT Y: BASEMENT- 0 I ST FLOOR- 0 2ND FLOOR 0 BASEMENT 0 IST FLOORS 2379 2ND FLOOR 2379 3RD FLOOR:0 GARAGE -0 DECK -0 OTHER 0 13RD FLOOR -0 GARAGE D DECK: 518 OTHER 38 F -QUI RED E 15 PROPOSED: 15 REQUIRED- N 5 PROPOSED: 5'2 5' IREQUIRED: W 0 PROPOSED0 EIGHT ALLOWED 25 PROPOSED .24.96 IREQUIRED S5 PROPOSED.5 ETBACK NOTES Zone -OR I AGREE TO COMPLY W ITH CITY AND STAT E LAWS REGULATING CONSTRUCTION AND IN DOING TIIE WORK AUTHORIZED THEREBY, NO PERSON WILL BF EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGI ON RELATINGTO WORKMEWSCOMPENSATION INSURANCE AND RCW 1827 IHISAPPLICATION ISNOT A PERMIT UNTIL SIGNED BY'riic BUILDING OFFICIAL OR IIISfHER DEPUTY AND ALL FEES ARE PAID ATTENTION ITIS UNLAWFUL TO USE OR OCCIIP,' A BUILDING OR SIHUCTURE UNTIL A DNA I. INSPECTIONHAS BEEN MADE: AND APPROVAL ORA CERIIFICKIF. OF OCCUPANCY IIAS BEEN GRANTYD UBC109/ IBCI 10/ IRCI 10 ARCHIVE = APPUCANI' = ASSESSOR X O'11*R 0 STATUS: ISSUED BLD20080464 SURVEY REQUIRED FOR HEIGHT VERIFICATION: Due to the location of the datum point in relation to the subject site, a survey will be required to verify the height of the budding (based on approved height calculations) stamped and signed by a State licensed land Surveyor. Subrttit for approval prior to framing inspection. SPECIAL NSPECTIONS: (See Sheet SI.I for specific information) I. EXCAVATION, GRADING and SITE PREPARATION 2. A UGERCA ST PI LE INSTA LLATION 3. SIIORING INSTALIATION AN'D MONITORING 4. SOI I- BEA RING VERIFICATION' 5. PLA CEM ETT OF FILL. AND COM PA CTION, fNCI.UDINGATCONSTRUCT IONIENTRANCE 6. RETAININGWALL.CON STRUCTION, INCUDINGDRAINA GE T FOUNDATION DRAINA GE 8. CONCRETECONSTRUCTION— SEE S1.1FOR SPECIFICS 5. WOOD CONSTRUCT ION— SEE S1.1FOR SPKI FICS FINAL SPECIA I. INSPECTION REPORTS REQURIID PRIOR TO FINAI. BUILDING INSPECTION. BUIIDING ENCLOSURE INSPECTION LETTER REQUIRED BY FINAL INSPECTION SUBMIT SPECIAL INSPECTION FIELD REPORTS TO THE CITY ONA W 11X1 Y BA SIS. • Call Gina Coma for Planning inspection (425.771.0220, x1718) when landscaping is installed. Design Review approved through AD&2008-17. Max height 44.14(25 feet). • Scperatc Permits and Deferred Submittals: I) PLUMBING 2) MECHAN'ICAUHVAC 3) FIREALARM 4) FI RESPRINKLER (NF PA -13) 5) FIRE DEPARTMENT CONNECTION 6) SIDESEWFR 7) WATER METER 8) SIGNS 9) STATE FIF.CTRICALPERMIT 10) STATEFIEVATOR 11) TRASH ENCLOSURE PERMIT ON ADJACENT PROPERTY AND AGREEMBSIT. 12) FINAI. PT DECK PLANS AND CA LCS 13) WATERPROOFING'BUILDINGENCLOSUREPLANS/DETAILS 14) SHOP DRAWINGS PFR SI. I&STFFI.STAIRWAYS 15) LISTED AND TESTED FIRE STOPPINGASSFMBLIFS • Lot lute stakes must be in place at the tiny of foundation/setback inspection. • All new, exended, re -built or relocated electrical utility and/or service shall be placed underground. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290.1309 • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon subaittal and are non-refundable. Approval ofany plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision ofcity code orstatc lawdoes not approve any items not to code specification. • Sound/Noise originating fromtemporary construction sites as a resuh ofconstruction activity are exempt from the noise limits of F -CC Chapter 5.30 only during the hours of 7,00am to 6:00pm on weekdays and I0:ODam and 6,00pm on Saturdays, excluding 0 0 Sundays and Federal Holidays. At all othertbrcs the noise originating from construction sites/activites mut comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to FCC 5.30.120. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold hamnless the City of Fdmonds, Washington, its officials, employees, and agents fromany and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance to this pemlit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. The building enclosure must be inspected by a qualified inspector In accordance with RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter fromthe inspector must be submitted to the Building Division prior to final inspection by the City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction occurs, coordinate inspection with the City Building Inspector to insure that all required Inspections are performed. Inspection by the building enclosure inspector to meet RCW 64.55 does not substitute for required City building inspections which must be performed by the City Building Inspector. • Applicant shall repair/replace all damage to utilities or frontage improvements In City fight -of -way per City standards that it caused by or occurs during the permitted project. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS. SIDEWALKS. DRIVEWAYS. MAROUEES. ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT. SEE ECDC 19.00.006(AX6) PLJBLJC WORKS 425 M-0 i PR&TRE1TME]Yf 425 672-5755 1 RLCYCLJNC 425 2754801 an Name and Phone FPre-Con • FErosion Control/Mobilbation • FStornTightline • FStornConnect to Stub • FFooting Drain Connection • &Double Check Detector AssemVault FRPBA with HotBox • &Driveway Forth& Slope Ver. • &Retaining WallFormrss/Location • F Retaining Wall Drainage • F.-Fire/Aid Address Sign • &Cross Connection Final • &Engineering Final B -Setbacks • B -Footings • B -Foundation Wall • B -Isolated Footmgs,'Piers • El -Retaining Wall • B -Slab Insulation • &Ptumb Cround Work B -First Floor Framing • B -Plumb Rough In • B{'as Test/Pipe B -Equipment -Meth B -Evertor Sheathing • B -Shear Nailing • &Height Verification • B -Fire Stopping afternoon. B-Frendng &Wall I n s u lat io n/Cau ik B -Floor Insulation/CauEk B -Ceiling Insutation/Caulk B-Sheetrock Nail B -Building Final F.Damguishers F -Fite Dept Inspection F -Addressing Visibility F -Fire Final P -Planning Final -4 -4 mmm mAo y v H = 7 00% Oz" nr0 Tyr �zT c� nO D2 0 i/i smy ym *qVim mz g o .Z a 9 1!'y O 2 Om T m Op 0 ff C C m zm 0 z « Dy z0 m m mc m T O 2 f1 S STI m CL 5 m 2 7 n 1 z O N z O N 0 u N 0 .L O EOV °a °M Inspection Comments BLD20080464 6 - Apartment/Condo New Applied: 06/05/2008 Issued: 01/30/2009 Expires: 01/30/2012 enc. i aqo Address: 123 SUNSET AVE N, EDMONDS ,.:: ''.` 'DATEti? x..,,V!r -_._. - -.,,, "7jk - � INSPECTION INSPECT(ilk ACTION .: CMP Comment: Installed and backflow reports provided to the City. 1000 - E -Pre -Con 08/18/2011 MCCONNELL CMP Comment: Project finaled. 1060 - E-Fire/Aid Address Sign 08/18/2011 1001 - E -Erosion ControlfMobilizatlon 05/19/2009 Zulauf INC Comment: tesc adequate, special inspector also apprd MCCONNELL CMP 1001 - E -Erosion Control/Mobilization 08/1812011 MCCONNELL CMP Comment: Project finaled. COR Comment: Preliminary correction notice provided on site. 1013 - E -Storm Tightline 0512112009 lambert] I INC McConnell Comment: Partial OK to backfill 1013 - E -Storm Tightline 06/10/2009 lam bertj / INC McConnell Comment: OK to backfill 1013 - E -Storm Tightline 0710712009 Zulauf/Sibrel INC Comment: ok to b/f section along south wall 1013 - E -Storm Tightline 05/19/2011 ZULAUF COM Comment: TL connected to CB 1013 - E -Storm Tightline 08118/2011 MCCONNELL CMP Comment: Project finaled. 1014 - E -Storm Connect to Stub 08/18/2011 MCCONNELL CMP Comment: Contractor installed CB at SW corner of the building and connected to stone main installed by City contract for BNSF project. 1017 - E -Footing Drain Connection 05/19/2009 MCCONNELL CMP Comment: ok'd connection to new CB set in SW comer of property. 1034 - E -Water Service Line 03/11f2010 LAMBERTJ CMP Comment: okay to backfill 1039 - E-RPBA with HotBox 08/18/2011 MCCONNELL CMP Comment: Installed and backflow reports provided to the City. 1054 - E -Retaining Wall Drainage 08/18/2011 MCCONNELL CMP Comment: Part of building foundation. 1060 - E-Fire/Aid Address Sign 08/18/2011 MCCONNELL CMP Comment: Approved 1076 - E -Cross Connection Final 08/03/2011 MCCONNELL CMP Comment: Backflow test reports provided to Linda Mc. 1077 - E -Engineering Final 04/15/2011 MCCONNELL COR Comment: Preliminary correction notice provided on site. 1RJ/2012 1:52:09 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 3 INSPECTION W' DATE_ INSPECTOR ACTION 1077 - E -Engineering Final 04/20/2011 MCCONNELL COR Comment: Final correction notice emailed to Landsverk. 1077 - E -Engineering Final 07/27/2011 MCCONNELL COM Comment: Met with new contractor on site and discussed oustanding correction items 1077 - E -Engineering Final 08/18/2011 MCCONNELL CMP Comment: Project finaled. 1106 - B -Setbacks 05/13/2009 steinike CMP Comment: 1108 - B -Footings 05/12/2009 steinike INC Comment: Not Ready. 1108 - B -Footings 05/13/2009 steinike INC Comment: Locations on plan for west side. 1108 - B -Footings 08/04/2009 STEINIKE CMP Comment: 1110 - B -Foundation Wall 08/04/2009 STEINIKE CMP Comment: 1114 - B -Isolated Footings/Piers 08/04/2009 STEINIKE CMP Comment: 1128 - B -Gas Test/Pipe 03/16/2010 STEINIKE CMP Comment: 1130 - B -Equipment -Mach 04/02/2010 steinike CMP Comment: 1132 - B -Exterior Sheathing 03/24/2010 STEINIKE CMP Comment: 1136 - B -Shear Nailing 08/26/2009 lawler INC Comment: see jobsite plans 1136 - B -Shear Nailing 03/24/2010 steinike CMP Comment: 1140 - B -Height Verification 04/12/2011 STEINIKE CMP Comment: Received Survey letter! 1141 - B -Fire Stopping 04/02/2010 STEINIKE PAR Comment: Above slab. 1141 - B -Fire Stopping 08/31/2011 STEINIKE CMP Comment: 1142 - B -Framing 03/24/2010 steinike CMP Comment: 1144-B-WallInsulation/Caulk 03/24/2010 steinike CMP Comment: 1/9/2012 1:52:09 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 3 I- -- -" ..._...... INSPECTION . - - - DATE - - .._. _........_.... INSPECTOR . ACTION — 1146 - B -Floor InsulatlonlCaulk 03/24/2010 steinike CMP Comment: 1148 - B -Ceiling Insulation/Caulk 03/24/2010 steinike CMP Comment: 1150 - B-Sheetrock Nail 01/14/2010 steinike INC Comment: Wrote Correction Notice. 1150 - B-Sheetrock Nail 04/02/2010 steinike CMP Comment: 1158 - B -Building Final 04/11/2011 STEINIKE COR Comment: Gave correction notice. 1158 - B -Building Final 08/24/2011 BJORBACK COM Comment: Correction notice on residential units only. 1158 - B -Building Final 09/09/2011 STEINIKE COR Comment: Gave Correction Notice on ALL units. 1158 - B -Building Final 01/06/2012 LAWLER CMP Comment: 1955 -F -Extinguishers 01/09/2012 SMITHM CMP Comment: APPROVED 1975 - F -Fire Dept Inspection 01/09/2012 SMITHM CMP Comment: APPROVED 1980 - F -Addressing Visibility 01/09/2012 SMITHM CMP Comment: APPROVED 1985 - F -Fire Final 01/09/2012 SMITHM CMP Comment: APPROVED 2000 - P -Planning Final 01/30/2009 Coccia INC Comment: Assign final inspection to GINA... 2000 - P -Planning Final 09/09/2011 COCCIA CMP Comment: Inspected 4/8/2011. 1/9/2012 1:52:09 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 3