BLD20080634.pdfSTATUS: ISSUED 9/19/2008
Expiration Date: 9/19/2009
CITY OF EDMONDS
121 5TH AVENUE NOR'I"❑ - F'DMONDS,WA 98020
PHONE' (425) 771-0220 - FAX (425) 771-0221
Project Address:
#: BLD20080634
01 OLYMPIC VIEW DR,
EDMONDS
Parcel No: 00565600100500
HARRY POLL HARRY POLL CAVALIERE CONSTRUCTION COMPANY
18401 OI"YMPIC VIEW DRIVE 18401 OLYMPIC VIEW DRIVE PO BOX 1982
E'DMONDS. WA 98020
206-617-7876
ADD 180
VALUATION: $11,736
EDMONDS, WA 98020
206-617-7876
TO EXISTING DETACHED GA
WOODINVILLE, WA 980721992
425-402-1 803
LICENSE #. CAVALCCO23BK EXP_I/3/2009
PERMITTYPE Residential
PERMI"FGROUP .2-Addis
GRADING N CYDS.0
'TYPE OF CONSIRUCTION. VB
RETAINING WALL ROCKERY: N
OCCUPANT GROUP: R3
OCCUPANT LOAD_
PENCE- N ( 0 X 0 FT)
CODE 2006
OTHER N------- OTHERDESC.
ZONE RS-12
NUMBER OF STORIES: 0
VESTED DATE -
NUMBER OF DWELLING UNITS 0
BASEMENT: 0 1 SF FLOOR 0 2ND FLOOR. 0
BASEMENT: 0 1 SF FLOOR 0 2ND FLOOR. 0
3RD FLOOR' 0 GARAGE'. 0 DECK: 0 OTHER
13RD FLOOR. 0 GARAGE. 0 DECK'. 0 OTHER'. 0
FRONTSIFTBACK i
2EQUIRED EAST 25 PROPOSED'. 87 REQUIRED. NORTH 10 PROPOSED'. 10 REQUIRED: WEST 25 PROPOSED. 180
TEIGHT ALLOWED15 PROPOSED. 14.16 IREQUIRED. SOUTH 10 PROPOSED. 87
iE7'13ACK NO'I"ES. - Project proposed — 90' from top ofslope
' Eaves may pro)ect up to 30" mto the 10' setback-
1 AGREE TO COMPLY WITH Cl"TY AND STATE LAW S REGULA"PING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED
'THEREBY, NO PF"RSON WILL BE EMPLOYED IN VIOLATION OF THE, LABORCODE OF THE STATE OF WASHINGTON RELATINGTO
WORKMEN'S COMPENSATION INSURANCEAND RCW 18-27
'f HISAPPLICA'1"ION IS NOT A PERMIT UNTIL SIGNED BY 7"FIE BUILDING OFFICIAL OR HIS/HER ;PU'FY ND ALL FLES ARE PAID.
Print Name Date
Released
ATTENTION
I IS UNLAWFUL TO USE OR OCCUPY A HUILDING OR STRUCTURE UN'BL A FINA I. INSPECTION I [AS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
O('CUPANCY HAS BEEN GRANTED t1B('109/ IBC'I 10/ IRC'I 10
= ARCHIVE = APPLICANT = ASSESSOR OTHER
STATUS: ISSUED BLD20080634
• *Max projection of eaves into the setback is 30".
• project mist comply with the Washington State Department of Fah & Wildlife - letter of approval attached.
• Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are eronpt from the noise firnits
ofECC Chapter 5.30 only during the hours of7:00amto 6:00pmon weekdays and 10:0 u and 6:00pmon Saturdays, erxinding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the
noise frosts of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents fromany and all claim for damages of
whatever nature, arising directly or indirectly fromthe issuance fo this permit. Issuance of this penrit shall not be deemed to
modify, waive or reduce any requirements of any Cry ordinance not limit in any way the City's ability to enforce any ordinance
provision.
• Maintain erosion & sedhmntation control percity standards.
THIS PERIAT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS. DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERIATTIME LIMIT: SEE ECDC 19.00.005(Ax9)
PUBLIC WORKS 425 rI-0735 PR IMTM 4 672-5755 1 RECVCUNG 425 275-4801
for an inspection Please lease the
or
• &Erosion ControFMoblhmtion
• E-Engineering Final
• BSetbacks
• B•Footings
• B-Foundation Wall
• B-Exterior Sheathing
• B-Framing
• B-Building Final
Permit Inspection Details
Permit: BLD2O08O634
1001 - E-Erosion Control/Mobilization
Complete?
y
02/09/2009 Sibrel
10 TESC good
y
Total Time:
10
1077 - E-Engineering Final
Complete?
y
02/09/2009 Sibrel
10 OK to Final
y
Total Time:
10
1106 - B-Setbacks
Complete?
y
09/23/2008 steinike
15
y
Total Time:
15
1108 - B-Footings
Complete?
y
09/23/2008 steinike
20
y
Total Time:
20
1110 - B-Foundation Wall
Complete?
y
09/23/2008 steinike
15
y
Total Time:
15
1132 - B-Exterior Sheathing
Complete?
y
01/06/2009 steinike
15
y
Total Time:
15
1142 - B-Framing
Complete?
y
01/06/2009 steinike
15
y
Total Time:
15
1150 - B-Sheetrock Nail
Complete?
y
01/20/2009 steinike 20
y
Total Time:
20
1158 - B-Building Final
Complete?
y
02/04/2009 steinike 20 Wrote Correction Notice.
N
02/10/2009 steinike 20
y
Total Time:
40
Total Inspections: 10 Total Time: 160
2/10/2009 4:46:39 PM Page 1 of 1
O y{(T9(9921:PU10 Q
14116 RN'�PNPPK �� ���
M:O WLl3l caa i•
3van r� � i
HII
WIGIIiMIAPI •itl'6!A GNY AYANA11p
3.?N3aIS321 onoa $I �
0
W
0
4.
4
0
lP dpp
fill
16ffy
P
Q
11��iN
uM
ayya
C
4
QI
F
Ali
r y„Y�r
ut
S
A
ao
_
U
�
Q
0
0
U
-o
�
0
!
t`t1Z
OY
a
w
C) cmw
d
cc
CS
U1
'P43
�
cv
?
W 0
1
Z shy a
O �
t-
Eagle Eye Consulting Engineers, P.S.
PO Box 623
Olalla, WA 98359
hoyteter@centurytel.net
360 874 0562 Coll
Fax 360 874 0591
To: Marie Harrison
121 5'h Ave N
Edmonds, WA 98020
Re: Poll Residence
18401 Olympic View Drive
Edmonds, WA 98020
Plan Review 112008-0634 EECE # EDM 08-77
Plan review number 01
structtseP
to e Additio_ns _i 18_0
to
total
180
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPF. OF REVIEW
The scope of this review is for the Structural, Ordinance, V&IAQC, Energy requirements
of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
AUG 19 Z038
MICROFILM BUILDING DEPT.
Page 2 of 3
Plan Review Number 01
EECE#: EDM 08-77
Poll Residence
2008-0634
STRUCTURAL COMMENTS
Sheet 4 Storage Shed Plans, elevations and Details
1. The drawing only shows braced wall panels on three sides. The braced wall panel
shall be on all four sides in using the IRC prescriptive method. Please modify
accordingly.
Sheet Notes and Details
2. Please note the plate washer shall be a minimum 3" x 3" x 0.229" at all anchor
bolts. The drawings state's W. R602.11.1. and IBC 2305.3.11
3. Please specify the reinforcement for the footing noted in the wall sections. This
just shows schematically what will be built.
4. Please specify the required hanger to support the 2x6-roof rafter. All that is noted
is "GALV HANGER".
ORDINANCE COMMENTS
Sheet 1
5. Please clarify why the purposed shed area does not match the dimension shown on
the drawings. Please modify accordingly.
Sheet 4 Storage Shed Plans, elevations and Details
6. Please clarify on the drawing the required roof ventilations. I was unable to
determine this from the drawings. R806
7. Provide attic access size & location. R807.1.
8. The building code requires roofs built with combustible material and has a vertical
height of 30" or more to have an attic access. Please note on the drawing the
vertical clearance or note the required attic access. Based off the drawing this will
be required. R807.1
VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS
Not applicable for this pennit
ENERGY COMMENTS
Not applicable for this permit
Page 3 of 3
Plan Review Number 01
EECE#: EDM 08-77
Poll Residence
2008-0634
Additional corrections may be required following receipt of corrections and
additional information as requested.
Your plans are being reviewed concurrently with the Building Department, lire
Department, Zoning Department and Public 'Works Engineering. Changes,
clarifications or additional corrections may be required subsequent to the Building
Department plan review when comments are received from the other concerned
departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at
(360) 874-0562 between 8:00 am. and 5:00 p.m.
By: `--
Hoyt Jeter, P.E.
President
0.90
�(3oa
S�
$(OGk _ Out-
r
432c�c� - J
—couex-�ot �l
0a pom?
��n1 �ov1�CtM 7w�7��z
" Page" 2 of3Plan Review Number 01
EECE4: EDM 08-77
Poll Residence
2008-0634
STRUCTURAL COMMENTS
Sheet 4 Storage Shed Plans, elevations and Details
1. The drawing only shows braced wall panels on three sides. The braced
wall pane
shall be on all four sides in using the IRC prescriptive method. Please
modify
accordingly.
Sheet Notes and Details
091021O8•• Added two- 6' /egth braced nulls an the south (exatinggarage wall) for all
four side.
2. Please note the plate washer shall be a minimum 3" x 3" x 0.229" at
all anchor
" bolts. The drawings state's 2x2. R602.11.1. and me 2305.3.11
09/02/08.• dnaged obnwing andgeaenlimte to show 3'x 3'x.229 plate *usher typicalat
a//anchor bolts
3. Please specify the reinforcement for the footing noted in the wall
sections. This
just shows schematically what will be built.
09102108. Added dimensions ands/se of horizanta/reinforcing stee/m the footing.
4. Please specify the required hanger to support the 2x6-roof rafter.
All that is noted
is "GAL V HANGER".
09IV2108 Addednote for Simpson LU210galkwuxedhager for roof rafter.
ORDINANCE COMMENTS
Sheet 1
5. Please clarify Why the purposed shed area does not match the
dimension shown OJ
the drawings. Please modify accordingly.
09/OZ/o8: draped drawing to show 22'x I1' building aid roof footprint.
Sheet 4 Storage Shed Plans, elevations and Details
6. Please clarify on the drawing the required roofventilations. I was
unable to
determine this from the drawings. R806
09/02/O8. Added notes and calculations for Car -a -vent roof ►entilotion aid note fa• soffit
vent.
7. Provide attic access size 6 location. R8O7.1.
09102108 Added attic aeeesnoteraid dimeuians for block out.
"8. The building code requires roofs built with combustible material and
has a vertica:
height of 30" or more to have an attic access. Please note on the
drawing the
vertical clearance or note the required attic access. Based off the
drawing this will
be required. R807.1
09/02/08: Addednote for attic access requiring 3671ninimum clear nmobstructed headroom.
Added dinmion of wifyiag 4'-6'
clear at ridge above rafters.
VENTILATION AND INDOOR QUALITY CONTROL COMMENTS
Not applicable for this permit.
ENERGY COMMENTS
Not applicable for this permit.