Loading...
BLD20080846.pdfI OF E04f Y CITY OF EDMONDS 1 N 121 5TH AVENUE NORTH - EDMONDSWA 98020 45 i PHONE: (425) 771-0220 - FAX: (425) 771-0221 7o c, IR90 STATUS: ISSUED 12/9/2008 Permit #: BLD20080846 BUILDING Expiration Date: 12/9/2009 Project Address: 18809 OLYMPIC VIEW DR, EDMONDS No:00434600007302 TOM / VICKI KIRKENDALL / 9 18809 OLYMPIC VIEW DRIVE EDMONDS. WA 98020 425-775-3569 CHERMAK CONSTRUCTION INC. 855 EDMONDS WAY EDMONDS, WA 98020 425.776-1367 203 SQ FT ADDITION ON MAIN FLOOR OFF E)CISTINGLIVINGA BASEMENT)OFF EX)STINGOFFICE AREA. 129 SQ FT A DDITON OFF EXISTING LOWER FLOOR BEDROOM. 160 SQ FT DECK OFF UPPER ADDITION BATHROOM OFF MAIN FLOOR REMODEL CA20040149 VALUATION: $63527 CHERMAK CONSTRUCTION INC. 855 EDMONDS WAY EDMONDS, WA 98020 425-776-1367 LICENSE C CHERMCI I IONU EXP:8f72009 ADDITON ON PERMIT TYPE. Residential PERMIT GROUP: 2-Addition GRADING N CYDS 0 TYPE OF CONSTRUCTION- VB RETAINING WALL ROCKERY N OCCUPANT GROUP: OCCUPANT LOAD FENCE. N ( 0 X 0 FT) CODE 2006 OTHER.N -------OTHER DESC. ZONE, RS-12 NUMBER OF STORIES-. 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 r EXISTING AREA BASEMENT: 0 IST FLOOR 0 2ND FLOOR: O BASEMENT:O 1ST FLOOR: 0 2ND FLOOR:0 3RD FLOOR. 0 GARAGE- 0 DECK:0 OTHER: 0 3RD FLOOR:O GARAGE: 0 DECK: 0 OTHER.O REQUIRED: 10 PROPOSED: 80 RE UIRED: 10 PROPOSED: IS RE UIRED: 10 PROPOSED: 57 'HEIGHT ALLOWED:25 PROPOSEDA6.75 REQUIRED: 10 PROPOSED: 52 SETBACK NOTES: Distance to top of slope okay per 11.18 08 geotechnical report by Liu& Asmaates (File Number 8A100). I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCT ION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPLITY ANP ALL FEES Aff PAW. Signature Print Name Date Released By y v Da ARCHIVE = APPLJCANT ASSESSOR OT JER ATTENTION IT IS UNLA WFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBCI09/ IBCI 10/ IRCI 10. STATUS: ISSUED BLD20080846 • Follow recommendations of Liu & Associates geotechnical report dated 11.18.08, file number 8A 100. • REQUIRED SPECIAL rNSPECfIONS FOR THIS PROJECT: 1) Soil bearing verification 2) Footing drain 3) Final Letter from geotechnical engineer of record 4) Epoxy bolting • Obtain Electrical Permit from State Department of labor & Industries. 425-290.1309 • Final approval on a project or final occupancy approval nest be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request foraltematedesign, modification, variance or other administrative deviation (hereinafter "variance")from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits ofECC Chapter 5.30 only during the hours of7:00amto 690pmon weekdays and 10:00amand 6:00pmon Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5,30,120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. • Call for locates of underground utilhies prior to any excavation. • Maintain erosion & sedimentation control per city standards. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS. DRIVEWAYS. MARQUEES, ETC.) WALL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(AN9) BUBALYG (4251771-0220 EXT. 1333 ENGLYEWMG (425)771-0220 EXT. 1326 I N71te:(4"IJ) //1-ULr7 I PUBUC WORKS 425 771.0235 1 PRBTMTMLNT 425 672-5755 1 RDCVC JNG 425 275-4801 When calling for an inspecnon Pease rear uHc lm—ug..........."•.•......._..._..— -----. -" - remesled Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. E.Erosion Control/Mobilization E-Roof Drain/Tightfine • E-Drywell • &Footing Drain TL Conveyance • E-Engineering Final • B-Footings • B-Foundation Wall B-Foundation Drainage • B-Slab Insulation • B-Plumb Ground Work • B-Plumb Rough In B-E4eriorSheathing • B-Ranting • B-WallInsulation/Caulk B-Ceiling Insulation/Caulk • B-SheetrockNal &Building Final Permit Inspection Details r =�\ Permit: bId20080846 PERMITTi �+?: 1001 - E-Erosion Control/Mobilization Complete? Com P , Y , 01/092009 Sibrel 0 TESC adequate for now. Contractor req'd to trench in sift fence -20 feet along N side of N property. 04232009 collinsj 15 Final Approved Y Total Time: 15 1013 - E-Roof Drain/Tightline Complete? Y 01/092009 Sibrel 10 Vfy'd Connection to Infiltration trench. Y Total Time: 10 1018 - E-Drywell Compete? Y , "Y 01/092009 Sibret 10 Infiltration trench OK. Total Time: 10 1019 - E-Footing Drain TL Conveyance Complete? Y 011/092009 Sibrel 30 Approved: No footing drains installed. Special inspector approved the non -installation. Y Special inspector is same as geotech of record. Asst Bldg Official notified and is OK with situation. Total Time: 30 1077 - E-Engineering Final Complete? Y 04232009 collinsj 15 Final Approved Y Total Time: 15 1106 - B-Setbacks Complete? _Y_. 01/022009 lawler 15 Y Total Time: 15 1108 - B-Footings Complete? Y "Y " 01/022009 lawler 15 Total Time: 15 1110 - B-Foundation Wall Complete? Y 01/022009 Lawler 15 Y Total Time: 15 1112 - B-Foundation Drainage Complete? Y 04232009 steinike 20 Y Total Time: 20 1118 - B-Slab Insulation Complete? Y 01/122009 steinike 20 Y Total Time: 20 1120 - B-Plumb Ground Work Complete? Y 01/02/2009 lawler 15 Y Total Time: 15 1126 - B-Plumb Rough In - Complete? Y,y 01/142009 steinike 15 Wrote correction Notice no test. N 02/052009 steinike 20 Y Total Time: 35 1132 - B-Exterior Sheathing Complete? Y 02/032009 bjorback 40 CORRECTION NOTICE N 02/052009 steinike 10 Y Total Time: 50 1142 - B-Framing Complete? ,Y 02/05/2009 steinike 25 Y Total Time: 25 424/2009 4:31:48 PM Page 1 of 2 1144 - B-Wall Insulation/Caulk 02M2/2009 steinike 20 1148 - B-Celling Insulation/Caulk 02/12/2009 steinike 10 1150 - B-Sheetrock Nail 02/17/2009 biorback 1158 - B-Building Final 04232009 steinike 0 APPROVED 25 Complete? Y Y. Total Time: 20 Complete? Y ' Y Total Time: 10 Complete? Y Y Total Time: 0 Complete? Y Y Total Time: 25 Total Inspections: 21 Total Time: 345 4/24/2009 4:31:48 PM Page 2 of 2 Y °V FOA' v G l E+1. 1890 CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT PERMIT # 3't-0 "GJ I eAv DATE: ! / e F PROJECT SITE ADDRESS: l DUe 9 Dl Gff ie'fe V'(� hY PROJECT // / f-Jen SPECIAL INSPECTION AGENCY_ *One form must be completed by each Agency or SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testing/inspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION DATTACHED •'APPROVED PLAN SHEET ❑ Fabrication (1704.2) ❑ Wood Construction (1704.6 0 Steel Construction (1704.3) ❑ Soils (1704.7 ❑ Concrete (1704.4) o Bolts installed in Concrete (1704.13) ❑ Special Moment Resisting Concrete Frames (1704.4) ❑ Reinforcen Steel, Prestressing Steel Tendons (1704.4) ❑ Structural Welding (1704.3.1) ❑ High Strength Bolting (1704.3.3) ❑ Mason (1704.5) ❑ Reinforced Gypsum Concrete (1704.4) ❑ Structural Masonry for Seismic Resistance (1708.1) ❑ Structural Observation (1709) ❑ Insulating Concrete Fill (1704.4) ❑ Spray Applied Fire -Resistive Materials (1704.10 ❑ Piling, Drilled Piers, and Caissons (1704.8, 1704.9) ❑ Shoterete (1704.4) ❑ Pier Foundations (1707.5) ❑ Structural Steel (1707.2 ❑ Grading. Excavation. Fill, Proof Rollin (1704.7) ❑ Smoke -Control Systems (1704.14) ❑ Exterior Insulation and Finish Systems (1704.12) ❑ Designated Seismic Systems (1707.9) ❑ Mechanical Components (1707.8) ❑ Cold Formed Steel Framing (I707.4 o Storage Racks (1707.6) ❑ Architectural Components (1707.7 ❑ Structural Wood (1707.3) ❑ Special Cases (1704.13 o Seismic Isolation System (1707.10) L? J- u2 ❑ Mastic. Intumescent Fire Resistant Coatings (1704.11) 0 c High Load Diaphragms (1704.6.1) 0 BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval prior to permit issuance. L: ,TEMP\BUILDING\FORMS\Inspection\SpeciallnspectionAgreementlBC I RE V.doc7/07 9,aPPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description and date of daily inspections and tests made with applicable locations • List of all non -conforming items and locations • Report on status of non -conforming items (how each was resolved or unresolved) • Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. L JEMPBUILDING FORM S\Inspection\SpeciallnspectionAgreementlBCIREV.doc7/07 ti 5. FINAL CONSTRUCTION REPORT - The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D. Owner Responsibilities 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities 1. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. L:\TEMP\BUILDING\FORMS\Inspection.SpeciallnspectionAgreementlBC I RE V.doc7/07 j" ACKNOWLEDGEMENTS I have read and agree to comply with the terms and ditions of this agreement p Owner name `� O� �Il �� �� L-• (p a e kint or typ Signature ate L /� General Contractor Copm any/Owner name ti (please print or type) Date Z ZOa� Special Inspector/Agency name or type) Date 0P8 Archid Return the original signed agreement to the Building Division City of Edmonds Building Division 121 5tn Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CITY OF City Official $UILDING DIVISION: Date M L:\TEMP\BUILDING\FORM S\Inspection\SpeciallnspectionAgreementlBC 1 RE V.doc7/07 0 b J a� 11 �o w fY� O f Z W Z o A J f °o aW w u Q Q v Q C mm F N O O W W w d O -A w.n 0 LU 3 „M.— d a zlailui' jr N1 / SC'NOWCa 1Ndtwolina ons3u N. Lei i I r We 12 gel® I i I �' n m 4Y ti�lw I � $i RW� I I � I � I I I I I I I ! OI \\ 16 �Ip IA y I � I I �1 �I �I vlv I I II I I I � ( I i rrpp Qi1 O ccp(_�~yam~ a, 7.0 G CY+�F+ t\ t✓nfn�lie �'t7 \ -�,\ °z`64 G+. o a W N I p $ 4S � ��\ \\ 3 ,,z60Z o0N ELI