During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Marie Harrison.
City of Edmonds handouts and standard details can be referenced on the City website under
Development Services Department, Engineering Division.
Comments 1 January 15, 2009
Comments 2 July 28, 2009
Comments 3 December 18, 2009
GENERAL
December 18, 2009 Thank you for revising the cost estimate. Please provide a
1.
performance bond for right-of-way improvements in the amount of $16,495.80. Please
contact Marie Harrison to obtain the appropriate performance bond form.
July 28, 2009 Thank you for providing an itemized cost estimate. Please revise the estimate to
include the trash enclosure, asphalt saw cutting and yellow curb paint (5 both sides of the
driveway).
January 15, 2009 - Please provide an itemized cost estimate for both on-site and off-site (right-
of-way) improvements, including traffic control.
A bond is required to be placed for all right-of-way improvements. The amount of the bond
o
will be based on 120% of the City approved estimate for all right-of-way improvements.
The City will inform you of the appropriate bond amount after review of the cost estimate.
Bond forms can be obtained from Theresa Umbaugh, Permit Coordinator 425-771-0220 or
umbaugh@ci.edmonds.wa.us
Inspection fees for this project will be calculated at 2.2% of the 120% City approved
o
estimate for all improvements.
Bld20080938 North Crest
Page 2 of 3
SHEET 1 TESC & GRADING PLAN
1.December 18, 2009 Civil plan sheet no longer contains the revisions that were addressed
in June 2009, based on comments from January 2009. January 15, 2009 comments have
been attached for your reference. Please update plan sheet to address previous comments.
SHEET 2 ROAD, DRAINAGE, WATER & SEWER PLAN
December 18, 2009 Please find attached a breakdown of impervious areas based on the
1.
information provided on the civil plan sheet as well the architectural roof framing plan.
The impervious area has still been calculated to be in excess of 5000sf. Please revise plans
and/or storm detention system design accordingly.
July 28, 2009 I have confirmed with our building division that my understanding of the roof
framing plan is accurate. As an alternate approach, I have checked my calculations using the
foundation plan & floor plans and accounting for 30 overhangs I calculate the roof top
impervious area to be 3248.5sf. My previous calculation of 3344sf actually included the
gutters. Donna Breske has calculated the additional impervious areas to be 2120sf less 249sf =
1881sf, for a grand total of 5129.5 square feet.
The proposed impervious areas will either need to be reduced in size or the detention
·
system will need to be designed for over 5000sf of impervious area.
Please also provide additional information with regards to the corner planters. It
·
appears as though they are at-grade planters (not a planting pot) and if this is the case
then it is agreed these areas do not need to be included in the impervious surface area
calculations.
January 15, 2009 - The impervious area for this project has been calculated to be more than
5000sf. In review of the roof framing plan, the roof area is 3344sf. This plan sheet states the
rooftop area is 3030sf. Please revise accordingly. If the impervious area exceeds 5000sf the
storm detention system shall be designed and stamped by a licensed engineer and storm calcs
shall be submitted to the City for review and approval.
ok
2.
ok
3.
ok
4.
December 18, 2009 Thank you for revising the trash enclosure. Any comments on the
5.
roller gate will be provided by Steve Fisher, Recycling Coordinator.
July 28, 2009 It appears as though the revised power pole location will prevent full swing of
the trash enclosure gates. Please revise accordingly.
January 15, 2009 - There is an existing power pole located in the alley right-of-way that appears
to be in conflict with the proposed driveway. Please coordinate relocation of the power pole
with PUD, as required, and note new location on the plans.
ok
6.
ok
7.
ok
8.
ok
9.
ok
10.
ok
11.
ok
12.
ok
13.
Bld20080938 North Crest
Page 3 of 3
December 18, 2009 The storm system to the west of the project site has not yet been
14.
installed by the Michel Construction development. Please add a note to the plans that
states prior to this project connecting to the existing CB, it shall be verified that the storm
th
system to the west has been installed and connected to the storm system at 6 Ave N. If
the storm line has not yet been installed, the subject development will need to install the
storm system or consult with the engineer of record to determine an alternate plan. Any
revisions to the approved plans will need to be reviewed and approved by the City prior to
construction.
Landscape plan L-1 indicates plantings at the outside corners of the driveway and in
15.
between the garage doors. Please revise civil sheets to include this areas or revise the
landscape plan accordingly.
SHEET 3 TRAFFIC CONTROL PLAN
ok
1.
ok
2.
ok
3.
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have