Loading...
bld20090120-Stanker-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check :Date: #2009-0120 March 5, 2009 th Project Name/Address: Stanker Addition_________24313 78 Pl W Contact Person/Address/Fax: Richard Wayland wayland@verizon.net Reviewer: JoAnne Zulauf Division:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at under City Government / Development Services Department / our website: www.ci.edmonds.wa.us Engineering Division then scroll down to Handouts: 1. Impervious surface includes the eves of all structures. Please add the additional square footage to account for the eves for the addition and for the original structure if not already included. 2. How will the drainage be handled for the addition? What drainage system, if any, does the current structure use? Please note/show on site plan. 3. If the side sewer connection on the outside of the structure will be changed/moved to accommodate the new addition, a side sewer repair permit will be required. Let me know on your resubmittal and I will set one up for you if necessary. Please resubmit 3 copies of the revised plans/documents to your Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 3/5/2009 PAGE ___ OF __ 11