bld20090122-0123_Cost Estimate.pdf
DATE: March 27, 2009
TO: Jordy Kostelyk
jordyk@earthlink.net
FROM: Jeanie McConnell, Engineering Program Manager
RE: Application #: bld20090122 and bld20090123
Project: Belanich Duplexes
th
Project Address: 7510 and 7512 210 St SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Marie Harrison.
City of Edmonds handouts and standard details can be referenced on the City website under
Development Services Department, Engineering Division.
GENERAL
1.Please provide an itemized cost estimate for both on-site and off-site (right-of-way)
improvements, including traffic control.
A bond is required to be placed for all right-of-way improvements. The amount of the bond
o
will be based on 120% of the City approved estimate for all right-of-way improvements.
The City will inform you of the appropriate bond amount after review of the cost estimate.
Bond forms can be obtained from Theresa Umbaugh, Permit Coordinator 425-771-0220 or
umbaugh@ci.edmonds.wa.us
Inspection fees for this project will be calculated at 2.2% of the 120% City approved
o
estimate for all improvements.
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.
bld20090122-0123_Cost Estimate Page 1 of 1