Loading...
BLD20090285.pdfSTATUS: ISSUED 5/29/2009 Expiration Date: 11/29/2009 No:27031300102500 MARIA & STROM PETERSON-MONTALVO 9323 OLYMPIC VIEW DR EDMONM WA 98020-2397 (425) 175-2774 Ext. VALUATION: $6,680 CITY OF EDMONDS 121 STH AVENUE NORTH- EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX (425) 771-0221 �-� Permit #: BLD20090285 CHERMAK 655 EDMONDS WAY EDMONDS, WA 98020- (425)776.1367 Ext. Project Address: 9323 OLYMPIC VIEW CHERMAK CONSTRUCTION 655 EDMONDS WAY EDMONDS, WA 98020- (425) 776.1367 Ext. LICENSE C CHERMCII 1 PERMIT TYPE: Residential PERMIT GROUP: 22 - Deck/Porch Cover GRADING: N CYDS: 0 TYPE OF CONSTRUCTION. RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N 0 X 0 FT.) CODE: OTHER:N ----OTHER DESC: ZONE: RS-12 NUMBER OF STORIES 0 VESTED DATE: NUMBER OF DWELLING UNIT S 0 LOT 1: BASEMENT: 0 IST FLOOR: 0 2ND FLOOR.0 BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR:0 3RD FLOOR 0 GARAGE: 0 DECK: 0 OTHER' 0 13RD FLOOR 0 GARAGE: 0 DECK: 334 OTHER- 0 REQUIRED' (E) 25' PROPOSED: 25'+ IREQUIRED: (N) 10' PROPOSED: 10' REQUIRED: (W) 25' PROPOSED: 25'+ HEIGHT ALLOWED25 PROPOSED 25 REQUIRED: (S) 10' PROPOSED- 10'* SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING T HE W ORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELAT LNG TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. ITHMAPPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR IMIER DEPUTY AND ALL FEESARE PAID Name Date ATTENTION rT IS UNLAWFUL 70 USE OR OCCUPY A BUILDrNO OR STRUC URE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBCI09/ IBCI I W IRCI 10. ARCHIVE APPLICANT O ASSESSOR OMER STATUS: ISSUED BLD20090285 • Follow all recommendations of the geotech report by GcoGroup Northwest dated 5/6109 and any subsequent reports. • Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision ofcity code or state law does not approve any hems not to code specification. • Sound/Noise originating ftomtcnporary construction sites as a result of construction activity are emnpt fiomthe noise Ihrms of ECC Chapter 5.30 only during the hours of 7 00arn to 6,DDpm on weekdays and 10 00am and 614m on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction shcs/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly ftomthe issuance fo this permit. Issuance of this pernit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not lint in anyway the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO RE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMWN (CURDS. SIDEWALKS. DRIVEWAYS. MARQUEES. ETC.) WILL REWIRE SEPARATE PERMISSION. PERMIT TIME LIMIT. SEE ECDC 19.00.005(Axe)' 771-= EXT. 1333 1 FNGQV MING (425) 7714M EXT. 1326 PUBLIC WORKS 4 771-M5 I PR&TRFATMEVT 425 672-5755 1 RECYCIJNG 425 2754901 When calling for an Inspection please lease the following information: Permit Number, Job Site Address, Type of Ins pecdon being regucsted, Contact Name and Phone Number Date Pirtfereed, and whether you prefer morning or afternoon. &Engineering Final &Setbacks • &Footings • &First Floor Framing &Framing &Building Final 5n�� W Q d u J O w a J Q F^ x V r M r o.1Ei: IY� �C i ¢ w W Z m ro Q W O C6o 16 �3 z sat Cal Geotochnleal Englneors. Gooloots Group Northwest, Inc. d EnAronmental scientists August 5, 2009 Jennifer Machuga, Planner City of Edmonds, Planning Division 121 - 5th Avenue North Edmonds, WA 98020 G-2878 Subject: Geotechnical Review, Revised Deck Location Peterson/Montulvo Residence 9323 Olympic View Drive Edmonds, WA Ref: Report titled, "Critical Area Study, Proposed Deck - Peterson/Montalvo Residence, 9323 Olympic View Drive, Edmonds, WA.," dated May 6, 2009, by GEO Group Northwest, Inc. Dear Ms. Machuga: We understand the location of the subject wood deck was revised and the deck was constructed 10 feet from the top of the slope. The size of the deck did not change. Based upon our review of the revised deck plans, the recommendations in the referenced report are still valid, with no changes to those recommendations. It is acceptable for the deck to be sited within the building setback, 10 feet from the top of the slope. Please call if you have any questions. Sincerely, GEO Group Northwest, Inc. Wade J. Lassey Engineering Geologist ZA� William Chang, P.E. Principal cc: Mr. Darrin Mock, Chermak Construction Mr. Strom Peterson, Owner 13240 NE 20th Street, Suite 10 • Bellevue, Washington 98005 Phone 425/849-8757 • Fax 4251649-8758 it !i, a (C ®]?ll � v o AUG 05 1005 BUILDING DEPAR,•MEW CITY OF EDMANDS I�1 Permit Inspection Details �1 Permit: BLD20090285 PERMITTRAX 1077 - E•Engineering Final '�w ry; IL° Complete? Y v ` 06/1t12009 Sibml 15 Approved. Y Total Time: Is 1106 - B-Setbacks Com lete7 Y __ _ _ _ .. _._ P O6/022009 sleinike 20 Aol l%;d to obtain new Site plan slwwing new locatb o1 Dock. N 07/312009 sloinike 20 Y Total Time: 40 x- r.y _.,.. ,lr 1108 - B-Footings :.,.�,� °"—.13.•, �n`n&.:a Nn sr._ ; ... .,.;�.,��.....�ei@eB?* Complete? .. — - ----_......-- as/osrzaas steiniko zo — - Y Total Time: 20 �'--._— ._ _. �... .._. ..-_.._r, __.�.—._. .. ..__.. 1142 - B-framing _ ___,w,,.... .ny, Byrd•-�--. __ .. _ Complete? .._ 1 Y _.....J,.�4: 06/162009 steiniko 20 Y Total Tim: 20 -- 1�,158-B-Building Final _,.,r.�,.�.. ., ,..,•o. ,, Complete? Plate? Y ... .._—._.. __ _. __—_— 07/312009—_ sle_inike 20 Y Total Time: 20 Total Inspections: 6 Total Time: 115 2/1&2010 7.35:01 AM Page 1 of 1