Loading...
BLD20090376.pdfSTATUS: ISSUED 9/22/2009 Expiration Date: 9/2 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Permit #: BLD2 90376 Project Address: 16319 75TH PL W, EDMONDS Parcel No:00513100006300 4 /9- .OP O. DEBDRAH-DAVID STEWART-FRITSCHEN HWA GEOSCIENCES DAVID FRITSCHEN 19925 13TH DR SE 19730 64TH AVE W, SUTIE 200 19925 13 DR SE BOTHELL, WA 98012- LYNNWOOD, WA 98036- BOTHELL, WA 98012- (206)271-9499 Ext. (425) 774-0 106 Ext. (206) 27 1-9499 Ext. LICENSE #: DAVIDF*91601 EXP:9/21/201 I 0 DESCRIPTION ESLHA NEW SFR VALUATION: $595,990 PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING: Y CYDS: 1450 TYPE OF CONSTRUCTION. VB RETAININGWALL ROCKERY: Y OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE N ( 0 X 0 FT.) CODE: 2006 OTHER: N------- OTHER DESC: ZONE RS-20 NUMBER OF STORIES:) VESTED DATE. NUMBER OF DWELLING UNITS: I ILOT #: EXISTING AREA BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 PROPOSED AREA BASEMENT: 0 IST FLOOR: 2721 2ND FLOOR:2659 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 925 DECK: 530 OTHER: 0 FRONTiACK SIDESETBACK REQUIRED: W 25 PROPOSED: 36.6 REQUIRED: N 15 PROPOSED: 15 REQUIRED: E 65 PROPOSED: 71 HEIGHT ALLOWED:25 PROPOSED.24.7 REQUIRED: S 10 PROPOSED 10 SETBACK NOTES: Setbacks defined in S-8-87 and AP-93-1 10 I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON LL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO /J WORKMEN'S COMPENSATION INSURANCE AND RCW 18,27. TLI+SAPP ICA T A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HI$,fHER DEPUTY AND ALL FEES ARE PAJD Name Date ._ r� N NY—ITMI IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. ARCHIVE APPLICANT ASSESSOR)4 OTHER a-19 STATUS: ISSUED BLD20090376 CONDITIONS • APPLICANT MUST COMPLY WITH REVISED LAND CLEARING AND TREE CUTTING PLAN DATED 8/9/07 REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: 1) START OF WORK 2) Excavation, grading, & site preparation 3) Placement of fill and compaction 4) Soil bearing verification 5) Pipe Pile Installation and pile cap 6) Piling refusal verification 7) Concrete reinforcement placement 8) Concrete placement 9) Field Welding (must use WABO cerified welders)(Steel Welding) 10) Subsurface drainage installation 11) Rockery placement and drainage 12) Temporary and Final Erosion Control 13) General Site Monitoring 14) Final letter from geotechnical engineer of record • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Approval ofthis foundation design is conditional subject to inspection of existing site soil conditions. Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. • Installer shall provide the manufacturers installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Maximum Height 25 feet. Measured from average elevation of undisturbed soil at comers of extended building rectangle. Subject to field check by building department. • Special inspections have been called for on this project and are noted on the approved construction plans and building pemtit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised— if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City: • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. , • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Type B or L vent connectors required on fuel-buming appliances passing through unheated spaces. Per IMC 803.2 • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Pursuant to UPC 605.2 a water service shutoff shall be installed on the water be as it enters the building. • City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping shall be of like materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1309. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • As required by Ordinance #3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including: site excavation, shoring, soil support for foundation including piles, soil bearing capacity, subdrainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written, dated reports on the progress of the construction and submit the report to the Building Official on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechinical report and/or approved plans or specifications shall be highlighted and immediately submitted in a seperate letter to the City for review. The City shall be advised in writing of work stoppages of more than one week In addition to the geotechnical monitoring, special inspections based on the provisions of IBC Section 1704 are required when specified on the approved plans. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record (refer to approved plan set). At the completion of final site grading and all permitted structures, a final geotechnical report, prepared by the geotechnical engineer shall be submitted to the Building Official. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related perntit requirements. Any deviations or omissions in the report, plans, or specifications that occured during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits ofECC Chapter 5.30 only during the hours of7:00amto 6:00pmon weekdays and 10:00amand 6:00pmon Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. • Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements. • 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, e)d.1326. • New and eAsting buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible fromthe street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible fromthe public way, at least 4 inches high with a %: inch min. stroke width on a contrasting background. • Maintain erosion & sedimentation control per city standards. • Maintain 10' separation between the sanitary side sewer and the water service line. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements. INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMITTIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INSPECTIONS BUILDING (425) 771-0220 EXT. 1333 ENGINIDiING (425) 771-0220 EXT. 1326 FIRE (425) 771-0215 PUBLIC WORKS 425 771-0235 PRE-TREATMENT 425 672-5755 RECYCLING 425 275-4801 When calling for an inspection please leave the following information: Permit Number, JobSite Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E-Erosion Control/Mobilization • E-Traffic Control • E-Storm Connect to Stub • E-Infiltration System • E-Footing Drain Connection • E-Water Service Line B-Retaining Wall Forms/Location • B-Retaining Wall Special Inspection • E-Retaining Wall Drainage ti ti. • E-Engineering Final B-Setbacks • B-Footings • B-Foundation Wall • B-Isolated Footings/Piers • B-Retaining Wall • B-Slab Insulation • B-Plumb Ground Work B-First Floor Framing • B-Plumb Rough In • B-Gas Test/Pipe • B-Equipment-Mech • . B-E#erior Sheathing • B-Shear Nailing • B-Height Verification • B-Framing • B-Wall Insulation/Caulk • B-Floor Insulation/Caulk B-Ceiling Insulation/Caulk • B-SheetrockNail B-Building Final • X-Special Inspection • E-Tightline Drain Connection